High-Efficiency Production Process of Special Transformers: Process Flow, Quality Control, and Performance Benchmarking

Leon
Leon
Field: Fault Diagnosis
China

A certain special transformer manufacturing enterprise, which has been producing special transformers such as split - phase - shifting rectifier transformers, rectifier transformers for electrolysis, and transformers for submerged arc furnaces for more than 20 years. Now, an evaluation is made on the production process flow and its characteristics of the special transformers after the company's transformation.

1.Production Process Flow Chart of Special Transformers

The production of special transformers mainly includes core production, insulation part production, winding winding, clamp and fastener production, oil tank and oil conservator production, assembly, and transformer inspection and testing, etc. Metal plates and profiles shall be subjected to spray and shot blasting for rust removal before blanking. After the clamps are cleaned of slag, acid pickling and phosphating surface treatment shall be carried out. The oil tank, oil conservator, clamps, etc. shall all be spray - painted with anti - rust paint and finish paint in accordance with the process requirements.

1.1 Production of Core Components
First, re - inspect incoming silicon steel sheets, checking items like B - H characteristics, P₁₅/₅₀, surface resistance, and mechanical properties. Then, blank via longitudinal/transverse shearing as per the nesting plan, stack the cut sheets to form the core. After passing the inspection, hoist it to the test station, and the tester will carry out the specified tests. After passing tests, bundle, shape, remove fasteners, and transfer to assembly.

1.2 Production of Insulation Components

First, re-inspect insulation materials. Then, blank per the nesting plan, apply glue to cardboard, stack, hot-press via steam, and finally saw/mill to shape.
The insulation workshop mainly produces insulation parts, fasteners, and clamps. Shaft parts use lathes/milling machines; box-type, special-shaped insulation parts use machining centers; planers handle plates/blocks. Additionally, an electrostatic plate wrapping machine makes electrostatic plates, and some parts use hot presses.

1.3 Winding of Windings

Prepare raw materials (enameled wires, electromagnetic wires, insulation parts). Inspect wire gauge, winding die dimensions. Select a winder based on the winding structure to wind the coil. After passing inspection, dry, preheat, and send to vacuum impregnation equipment. Post-impregnation, dry in a vacuum tank; transfer to assembly if qualified.

1.4 Production of Welded Components

First, degrease/rust-remove plates/profiles in a shot-blasting room. After passing, blank and weld. Small oil tanks/fin radiators use a full welding line. For all welded parts (boxes, covers, corrugated tanks, etc.), apply anti-rust/insulating paint as required post-welding.

1.5 Assembly Process

First, prepare qualified cores and ready for upper yoke disassembly/assembly. Take insulation parts/windings, assemble and insert plates in the designated area. After, the operator self-inspects; pass to quality inspector, then test the transformer body at the test station. After passing, proceed to next steps (welding wires, installing covers/switches/bushings). Post-operation, inspect via a special quality inspector; dry in a vacuum tank if qualified. After drying, fasten the body, hoist to test semi-finished products. After passing, final-assemble: hoist to the final assembly area, secure bolts, install oil conservators, etc. Then, pressure/leak test, stand at the test station. Conduct final tests as required; touch-up paint and store if qualified.

2 Analysis of Process Characteristics

The upgraded special transformer production process has a concise flow, smooth logistics, ensuring reliable production line operation. Easy to organize, suitable for mass production, efficient, and quality-reliable. It fully considers environmental protection, occupational safety, and energy-saving, aligning with international advanced tech. The flexible production line meets diverse market demands.

3 Guarantee of Production Process on Quality & Equipment Matching

Special transformers made via this process meet standards like GB1094.1-1996, GB8286-1996, etc. Key indicators (load loss, no-load loss, no-load current) exceed standards.
The company uses advanced equipment (German Georg shearing lines, domestic winders). Years of operation show good process-equipment matching.

4 Comparison with Domestic and Foreign Similar Products

Taking the submerged arc furnace transformer for magnesia smelting as an example, it can automatically complete adjustable changes of voltage and current within the specified smelting time. The no-load loss of this product is 21% lower than that of domestic similar products, the no-load current is reduced by 30%, and the load loss is decreased by 22.3%. Compared with foreign similar products, the no-load loss is 15% lower and the load loss is 13% lower.

For general transformers, the energy consumption for electro - fused magnesia is 3200kW·h/t - 3500kW·h/t, while the transformers produced by this company have an energy consumption of 2300kW·h/t - 2600kW·h/t, saving nearly 1000kW·h of electricity per ton. The performance parameter comparison with foreign similar products is shown in Table 1.

Give a tip and encourage the author!
Recommended
How to Design 10kV Overhead Line Poles
How to Design 10kV Overhead Line Poles
This article combines practical examples to refine the selection logic for 10kV steel tubular poles, discussing clear general rules, design procedures, and specific requirements for use in 10kV overhead line design and construction.Special conditions (such as long spans or heavy ice zones) require additional specialized verifications based on this foundation to ensure safe and reliable tower operation.General Rules for Overhead Transmission Line Tower SelectionThe rational selection of overhead
James
10/20/2025
How to select a dry-type transformer?
How to select a dry-type transformer?
1. Temperature Control SystemOne of the main causes of transformer failure is insulation damage, and the greatest threat to insulation comes from exceeding the allowable temperature limit of the windings. Therefore, monitoring temperature and implementing alarm systems for transformers in operation are essential. The following introduces the temperature control system using the TTC-300 as an example.1.1 Automatic Cooling FansA thermistor is pre-embedded at the hottest spot of the low-voltage win
James
10/18/2025
How to Choose the Right Transformer?
How to Choose the Right Transformer?
Transformer Selection and Configuration Standards1. Importance of Transformer Selection and ConfigurationTransformers play a critical role in power systems. They adjust voltage levels to suit different requirements, enabling electricity generated at power plants to be efficiently transmitted and distributed. Improper transformer selection or configuration can lead to serious issues. For example, if the capacity is too small, the transformer may not support the connected load, causing voltage dro
James
10/18/2025
How to Choose Vacuum Circuit Breakers Correctly?
How to Choose Vacuum Circuit Breakers Correctly?
01 PrefaceIn medium-voltage systems, circuit breakers are indispensable primary components. Vacuum circuit breakers dominate the domestic market. Therefore, correct electrical design is inseparable from the proper selection of vacuum circuit breakers. In this section, we will discuss how to correctly select vacuum circuit breakers and common misconceptions in their selection.02 Interrupting Capacity for Short-Circuit Current Need Not Be Excessively HighThe short-circuit interrupting capacity of
James
10/18/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.