What is Equal Area Criterion?

Encyclopedia
Encyclopedia
Field: Encyclopedia
0
China


What is Equal Area Criterion?


Equal Area Criterion Definition


The equal area criterion is a graphical method to determine the transient stability of a single or two-machine system against an infinite bus.

 


Equal Area Criterion for Stability



Over a lossless line, the real power transmitted will be Consider a fault occurs in a synchronous machine which was operating in steady state. Here, the power delivered is given by

To clear a fault, the circuit breaker in the affected section must open. This takes about 5 to 6 cycles, and the following post-fault transient lasts a few more cycles.


84a96514806dfa7bb5b2fa6e82aaf32f.jpeg

 


The prime mover, driven by a steam turbine, provides input power. The time constant for a turbine mass system is a few seconds, while for the electrical system, it’s milliseconds. Therefore, during electrical transients, mechanical power remains stable. Transient studies focus on the power system‘s ability to recover from faults and provide stable power with a new load angle (δ).

 


1aa8fb6113054e6923e496685d5cd88c.jpeg

 

4c3c8996dfbf69d597810cc6ead79361.jpeg

e265bfb21c85443fc5c92f3919a3a961.jpeg

The power angle curve is considered which is shown in fig.1. Imagine a system delivering ‘Pm’ power on an angle of δ0 (fig.2) is working in a steady state. When a fault occurs; the circuit breakers opened and the real power is decreased to zero. But the Pm will be stable. As a result, accelerating power.


The power differences will result in rate of change of kinetic energy stored within the rotor masses. Therefore, due to the stable influence of non-zero accelerating power, the rotor will accelerate. Consequently, the load angle (δ) will increase.

 


a7c92e5592ad094205e75716272958b6.jpeg

 


Now, we can consider an angle δc at which the circuit breaker re-closes. The power will then come back to the usual operating curve. At this moment, the electrical power will be higher than the mechanical power. But, the accelerating power (Pa) will be negative. Therefore, the machine will get decelerate. The load power angle will still continue to increase because of the inertia in the rotor masses. This increase in load power angle will stop in due course and rotor of the machine will start to decelerate or else the synchronisation of the system will get lose.

 


The Swings equation is given by

 


f2ac1e02689e3c5a7a42b1c4fa84d05c.jpeg

 


Pm → Mechanical power

Pe → Electrical power

δ → Load angle

H → Inertia constant

ωs → Synchronous speed

We know that,

 


Putting equation (2) in equation (1), we get

 


Now, multiply dt to either side of equation (3) and integrate it among the two arbitrary load angles which are δ0 and δc. Then we get,

 


f1b21b8864100aadb3be101fceef8567.jpeg

 


Assume the generator is at rest when load angle is δ0. We know that

 


dbb207b1e8819375aba8110d14f4697b.jpeg

 


At the time of occurrence of a fault, the machine will start to accelerate. When the fault is cleared, it will continue to increase speed before it reaches to its peak value (δc). At this point,

 


1a11910166b3de11d96370c25d070df5.jpeg

 


So the area of accelerating from equation (4) is

 


Similarly, the area of deceleration is

 


Next, we can assume the line to be reclosed at load angle, δc. In this case, the area of acceleration is bigger than area of deceleration.

 


7e014d70beade9e986db82077f384330.jpeg

 


A1 > A2. The load angle of the generator will pass the point δm. Beyond this point, the mechanical power is greater than electrical power and it forces the accelerating power to remain positive. Before slowing down, the generator therefore gets accelerate. Consequently, the system will become unstable.


When A2 > A1, the system will decelerate entirely before getting accelerated again. Here, the rotor inertia will force the successive acceleration and deceleration areas to become smaller than the previous ones. Consequently, the system will reach steady state.


When A2 = A1, the margin of the stability limit is defined by this condition. Here, the clearing angle is given by δcr, the critical clearing angle.

Since, A2 = A1. We get

 


The critical clearing angle is related to the equality of areas, it is termed as equal area criterion. It can be used to find out the utmost limit on the load which the system can acquire without crossing the stability limit.

 

4df0606799346dadff12ec760ac0055a.jpegc

 

Give a tip and encourage the author!
Recommended
Three-Phase SPD: Types, Wiring & Maintenance Guide
Three-Phase SPD: Types, Wiring & Maintenance Guide
1. What Is a Three-Phase Power Surge Protective Device (SPD)?A three-phase power surge protective device (SPD), also known as a three-phase lightning arrester, is specifically designed for three-phase AC power systems. Its primary function is to limit transient overvoltages caused by lightning strikes or switching operations in the power grid, thereby protecting downstream electrical equipment from damage. The SPD operates based on energy absorption and dissipation: when an overvoltage event occ
James
12/02/2025
Railway 10kV Power Through Lines: Design & Operation Requirements
Railway 10kV Power Through Lines: Design & Operation Requirements
The Daquan Line has a large power load, with numerous and scattered load points along the section. Each load point has a small capacity, with an average of one load point every 2-3 km, so two 10 kV power through lines should be adopted for power supply. High-speed railways use two lines for power supply: primary through line and comprehensive through line. The power sources of the two through lines are taken from the dedicated bus sections fed by the voltage regulators installed in each power di
Edwiin
11/26/2025
Neutral Grounding Methods for Conventional-Speed Railway Power Systems
Neutral Grounding Methods for Conventional-Speed Railway Power Systems
Railway power systems primarily consist of automatic block signaling lines, through-feeder power lines, railway substations and distribution stations, and incoming power supply lines. They provide electricity to critical railway operations—including signaling, communications, rolling stock systems, station passenger handling, and maintenance facilities. As an integral part of the national power grid, railway power systems exhibit distinct characteristics of both electrical power engineering and
Echo
11/26/2025
Application of Condition Monitoring Technology in UHV Transmission Lines
Application of Condition Monitoring Technology in UHV Transmission Lines
1. Application of Condition Monitoring Technology in UHV Transmission LinesAt present, the main characteristics of UHV (Ultra-High Voltage) transmission line condition monitoring technology in China are reflected in the following aspects: Comprehensiveness: In general, during the implementation of monitoring technology, supporting facilities and integrated systems are required to ensure effective monitoring performance; High value: UHV transmission line condition monitoring technology is a criti
Echo
11/20/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.