What are the causes of the breakdown and burning of the 35 kV GIS voltage transformer?

Felix Spark
Felix Spark
Field: Failure and maintenance
China

1. Accident Overview
1.1 Structure and Connection of 35kV GIS Switchgear Voltage Transformer

The ZX2 gas-insulated double-bus switchgear, manufactured in March 2011 and officially put into operation in July 2012, is configured with two groups of bus voltage transformers (PTs) for each bus section. The two PT groups of the same bus section are designed in one switchgear cabinet with a width of 600 mm. The three-phase PTs are arranged in a triangular formation at the bottom of the cabinet.

The PTs are connected to the disconnectors in the bus chamber of the PT switchgear via short cable plugs. The disconnectors are connected to the three-phase bus through moving contacts in the SF₆ fully-enclosed bus chamber. The fully-enclosed bus structure reduces the failure rate, and the bus is not equipped with dedicated bus protection. Bus faults are cleared through the backup protection of the power incoming switch.

1.2 Operating Mode Before the Burnout

Before the accident, the power grid operated as follows:

  • 220kV System: Qiaoshi Line and Huishi Line were running in parallel with the bus tie switch closed.

  • Main Transformer Load: No.1 main transformer carried 47 MW, and No.2 carried 14 MW.

  • 35kV System: Unit A operated with double buses in split operation. Generator No.2, carrying 30.5 MW, was connected to Bus II of Unit A via Bus 1 of Unit E, the hot oil interconnection line switchgears 361 and 367, and operated in parallel with No.2 main transformer.

1.3 Accident Process

  • Fault Precursor

    • Starting at 15:11:20.393 on April 19, the protection device of switch 367 in Unit E (Bus Unit for Generators 1 and 2) repeatedly issued PT disconnection alarms, which were intermittently reset.

  • Equipment Burnout

    • At 15:12:59, smoke and arcing were observed in the PT cabinet of Bus 1 in Unit E. The zero-sequence overcurrent protection of switches 361 and 367 was activated, tripping both switches.

  • On-Site Inspection

    • The cabinet door was blown open. Phase A PT was severely burned, and the plug of Phase B was fractured. Internal equipment was charred.

    • Secondary wires of the adjacent arrester cabinet were damaged. The bus chamber pressure and insulation tests were normal.

2. Cause Analysis
2.1 Equipment Quality and Installation Defects

  • Design and Manufacturing Issues

    • Poor insulation paint process leading to partial discharge.

    • Loose lamination of iron cores causing eddy current heating.

    • Irregular coil winding increasing the risk of inter-turn short circuits.

  • Installation and Maintenance Defects

    • Poor welding of grounding screws increasing contact resistance.

    • Deformation of iron cores during transportation/installation.

    • Transverse stress from short cable plugs causing epoxy cracking over time.

2.2 Abnormal Operating Conditions

  • Secondary Circuit Faults

    • Overloading in the secondary circuit due to excessive parallel loops, resulting in increased heat generation according to \(Q = I²rt\).

    • Secondary short circuits triggering primary current surges and overheating.

  • System Overvoltage

    • Ferroresonance caused by switching operations or arcing grounding, generating overvoltages up to 2.5 times the rated value.

    • Waveform distortion accelerating insulation aging.

  • Three-Phase Imbalance

    • High harmonic content (mainly odd harmonics) causing impedance imbalance.

    • Neutral point displacement current leading to overheating in the zero-sequence circuit.

2.3 Manufacturer's Disassembly Analysis

  • Fault Location

    • Epoxy cracking at the flange mounting hole of Phase A PT led to intermittent grounding.

    • Mechanical fracture of Phase B plug triggered phase-to-phase short circuit.

  • Stress Analysis

    • Non-flexible cable connections generated transverse stress concentrated at flange holes.

    • Fault progression: Intermittent grounding → Aluminum coating ablation → Fault reset → Final breakdown.

3. Retrofit Plan
3.1 Equipment Monitoring Optimization

  • Implement online partial discharge monitoring for GIS switchgears of the same model and establish baseline data.

  • Conduct periodic insulation resistance tests with a threshold of 200 MΩ.

3.2 Structural Design Improvement

  • Cabinet Expansion: Increase cabinet width from 600 mm to 800 mm to improve heat dissipation.

  • Connection Upgrade: Replace short cable plugs with direct connections to reduce stress.

  • Modular Design: Adopt pluggable PTs/arresters to minimize maintenance time.

3.3 Protection System Enhancement

  • Add dedicated circuit breakers for PT switchgears with overcurrent/overvoltage protection.

  • Install dedicated bus protection devices for rapid fault isolation.

  • Optimize zero-sequence circuit design to reduce resonance risk.

3.4 Operation and Maintenance Strategy Adjustment

  • Establish full lifecycle management records for equipment, documenting installation and maintenance data.

  • Perform quarterly SF₆ moisture content tests with a threshold ≤300 ppm.

  • Conduct annual PT volt-ampere characteristic tests for comparison with factory data.

4. Lessons Learned and Preventive Measures
4.1 Key Lessons

  • Design Flaw: Co-location of PTs increased fault propagation risk.

  • Maintenance Gap: Failure to detect cumulative stress damage.

  • Protection Deficiency: Reliance on backup protection delayed fault clearance.

4.2 Preventive Measures

  • Strengthen equipment manufacturing supervision, focusing on insulation processes and structural integrity.

  • Promote condition-based maintenance using vibration monitoring to assess stress levels.

  • Revise design specifications to mandate flexible connections between PTs and buses.

  • Conduct anti-accident drills to standardize emergency response procedures for PT faults.

4.3 Implementation Results

Post-retrofit data shows:

  • Partial discharge reduced from 80 pC to 15 pC.

  • Temperature rise under full load decreased by 12°C.

  • Fault response time shortened from 600 ms to 40 ms.

5. Conclusion

This accident revealed multiple hidden risks in GIS equipment design, installation, and maintenance. Through structural optimization, protection system upgrade, and management enhancement, a comprehensive risk prevention system has been established. Continuous monitoring of equipment performance will provide replicable retrofit experience for similar substations.

Give a tip and encourage the author!
Recommended
10kV RMU Common Faults & Solutions Guide
10kV RMU Common Faults & Solutions Guide
Application Issues and Handling Measures for 10kV Ring Main Units (RMUs)The 10kV ring main unit (RMU) is a common electrical distribution device in urban power distribution networks, primarily used for medium-voltage power supply and distribution. During actual operation, various issues may arise. Below are common problems and corresponding corrective measures.I. Electrical Faults Internal Short Circuit or Poor WiringA short circuit or loose connection inside the RMU can lead to abnormal operati
Echo
10/20/2025
High-Voltage Circuit Breaker Types & Fault Guide
High-Voltage Circuit Breaker Types & Fault Guide
High-Voltage Circuit Breakers: Classification and Fault DiagnosisHigh-voltage circuit breakers are critical protective devices in power systems. They rapidly interrupt current when a fault occurs, preventing damage to equipment from overloads or short circuits. However, due to long-term operation and other factors, circuit breakers may develop faults that require timely diagnosis and troubleshooting.I. Classification of High-Voltage Circuit Breakers1. By Installation Location: Indoor-type: Insta
Felix Spark
10/20/2025
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation! Never install the transformer too far away—avoid placing it in remote mountains or wilderness. Excessive distance not only wastes cables and increases line losses, but also makes management and maintenance difficult. Never choose transformer capacity arbitrarily. Selecting the right capacity is essential. If the capacity is too small, the transformer may be overloaded and easily damaged—overloading beyond 30% should not exceed two hours
James
10/20/2025
How to Maintain Dry-Type Transformers Safely?
How to Maintain Dry-Type Transformers Safely?
Maintenance Procedures for Dry-Type Transformers Put the standby transformer into operation, open the low-voltage side circuit breaker of the transformer to be maintained, remove the control power fuse, and hang a "DO NOT CLOSE" sign on the switch handle. Open the high-voltage side circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the high-voltage cabinet, and hang a "DO NOT CLOSE" sign on the switch handle. For dry-type trans
Felix Spark
10/20/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.