What are the causes of the breakdown and burning of the 35 kV GIS voltage transformer?

07/08/2025

1. Accident Overview
1.1 Structure and Connection of 35kV GIS Switchgear Voltage Transformer
The ZX2 gas-insulated double-bus switchgear, manufactured in March 2011 and officially put into operation in July 2012, is configured with two groups of bus voltage transformers (PTs) for each bus section. The two PT groups of the same bus section are designed in one switchgear cabinet with a width of 600 mm. The three-phase PTs are arranged in a triangular formation at the bottom of the cabinet.
The PTs are connected to the disconnectors in the bus chamber of the PT switchgear via short cable plugs. The disconnectors are connected to the three-phase bus through moving contacts in the SF₆ fully-enclosed bus chamber. The fully-enclosed bus structure reduces the failure rate, and the bus is not equipped with dedicated bus protection. Bus faults are cleared through the backup protection of the power incoming switch.
1.2 Operating Mode Before the Burnout
Before the accident, the power grid operated as follows:
  • 220kV System: Qiaoshi Line and Huishi Line were running in parallel with the bus tie switch closed.
  • Main Transformer Load: No.1 main transformer carried 47 MW, and No.2 carried 14 MW.
  • 35kV System: Unit A operated with double buses in split operation. Generator No.2, carrying 30.5 MW, was connected to Bus II of Unit A via Bus 1 of Unit E, the hot oil interconnection line switchgears 361 and 367, and operated in parallel with No.2 main transformer.

1.3 Accident Process

  • Fault Precursor
    • Starting at 15:11:20.393 on April 19, the protection device of switch 367 in Unit E (Bus Unit for Generators 1 and 2) repeatedly issued PT disconnection alarms, which were intermittently reset.
  • Equipment Burnout
    • At 15:12:59, smoke and arcing were observed in the PT cabinet of Bus 1 in Unit E. The zero-sequence overcurrent protection of switches 361 and 367 was activated, tripping both switches.
  • On-Site Inspection
    • The cabinet door was blown open. Phase A PT was severely burned, and the plug of Phase B was fractured. Internal equipment was charred.
    • Secondary wires of the adjacent arrester cabinet were damaged. The bus chamber pressure and insulation tests were normal.

2. Cause Analysis
2.1 Equipment Quality and Installation Defects

  • Design and Manufacturing Issues
    • Poor insulation paint process leading to partial discharge.
    • Loose lamination of iron cores causing eddy current heating.
    • Irregular coil winding increasing the risk of inter-turn short circuits.
  • Installation and Maintenance Defects
    • Poor welding of grounding screws increasing contact resistance.
    • Deformation of iron cores during transportation/installation.
    • Transverse stress from short cable plugs causing epoxy cracking over time.

2.2 Abnormal Operating Conditions

  • Secondary Circuit Faults
    • Overloading in the secondary circuit due to excessive parallel loops, resulting in increased heat generation according to \(Q = I²rt\).
    • Secondary short circuits triggering primary current surges and overheating.
  • System Overvoltage
    • Ferroresonance caused by switching operations or arcing grounding, generating overvoltages up to 2.5 times the rated value.
    • Waveform distortion accelerating insulation aging.
  • Three-Phase Imbalance
    • High harmonic content (mainly odd harmonics) causing impedance imbalance.
    • Neutral point displacement current leading to overheating in the zero-sequence circuit.

2.3 Manufacturer's Disassembly Analysis

  • Fault Location
    • Epoxy cracking at the flange mounting hole of Phase A PT led to intermittent grounding.
    • Mechanical fracture of Phase B plug triggered phase-to-phase short circuit.
  • Stress Analysis
    • Non-flexible cable connections generated transverse stress concentrated at flange holes.
    • Fault progression: Intermittent grounding → Aluminum coating ablation → Fault reset → Final breakdown.

3. Retrofit Plan
3.1 Equipment Monitoring Optimization

  • Implement online partial discharge monitoring for GIS switchgears of the same model and establish baseline data.
  • Conduct periodic insulation resistance tests with a threshold of 200 MΩ.

3.2 Structural Design Improvement

  • Cabinet Expansion: Increase cabinet width from 600 mm to 800 mm to improve heat dissipation.
  • Connection Upgrade: Replace short cable plugs with direct connections to reduce stress.
  • Modular Design: Adopt pluggable PTs/arresters to minimize maintenance time.

3.3 Protection System Enhancement

  • Add dedicated circuit breakers for PT switchgears with overcurrent/overvoltage protection.
  • Install dedicated bus protection devices for rapid fault isolation.
  • Optimize zero-sequence circuit design to reduce resonance risk.

3.4 Operation and Maintenance Strategy Adjustment

  • Establish full lifecycle management records for equipment, documenting installation and maintenance data.
  • Perform quarterly SF₆ moisture content tests with a threshold ≤300 ppm.
  • Conduct annual PT volt-ampere characteristic tests for comparison with factory data.

4. Lessons Learned and Preventive Measures
4.1 Key Lessons

  • Design Flaw: Co-location of PTs increased fault propagation risk.
  • Maintenance Gap: Failure to detect cumulative stress damage.
  • Protection Deficiency: Reliance on backup protection delayed fault clearance.

4.2 Preventive Measures

  • Strengthen equipment manufacturing supervision, focusing on insulation processes and structural integrity.
  • Promote condition-based maintenance using vibration monitoring to assess stress levels.
  • Revise design specifications to mandate flexible connections between PTs and buses.
  • Conduct anti-accident drills to standardize emergency response procedures for PT faults.
4.3 Implementation Results
Post-retrofit data shows:
  • Partial discharge reduced from 80 pC to 15 pC.
  • Temperature rise under full load decreased by 12°C.
  • Fault response time shortened from 600 ms to 40 ms.
5. Conclusion
This accident revealed multiple hidden risks in GIS equipment design, installation, and maintenance. Through structural optimization, protection system upgrade, and management enhancement, a comprehensive risk prevention system has been established. Continuous monitoring of equipment performance will provide replicable retrofit experience for similar substations.

Hey there! I'm an electrical engineer specializing in Failure and Maintenance. I've dedicated my career to ensuring the seamless operation of electrical systems. I excel at diagnosing complex electrical failures, from malfunctioning industrial motors to glitchy power distribution networks. Using state - of - the - art diagnostic tools and my in - depth knowledge, I pinpoint issues quickly. On this platform, I'm eager to share my insights, exchange ideas, and collaborate with fellow experts. Let's work together to enhance the reliability of electrical setups.

Transformer Detection, Testing, Maintenance and Servicing
Transformer Detection, Testing, Maintenance and Servicing
Transformer testing, inspection, and maintenance are essential tasks to ensure normal operation and extend the service life of transformers. Below are some recommended steps:Visual Inspection: Regularly inspect the transformer's exterior, including the enclosure, cooling system, and oil tank. Ensure the enclosure is intact, free from corrosion, damage, or leakage.Insulation Resistance Testing: Use an insulation resistance tester to check the transformer's insulation system. Verify that the insul
Vziman
08/29/2025
What are the Common Operation Faults of Indoor Load Switches?
What are the Common Operation Faults of Indoor Load Switches?
Common operational faults of indoor load switches primarily concentrate on three core aspects: mechanical operation, electrical performance, insulation, and arc extinguishing. These issues can be broadly categorized as follows and are often related to component aging, environmental influences, or improper operation.1.Mechanical Faults The most typical issue is abnormal operation during opening and closing. This includes excessive resistance, jamming, or even refusal to operate when manually turn
08/27/2025
What should be done if the fuse element on the high-voltage side of the transformer melts?
What should be done if the fuse element on the high-voltage side of the transformer melts?
If the fuse element on the high-voltage side of the transformer blows or the circuit trips, the first step is to determine whether one phase, two phases, or all three phases are interrupted. This can be determined according to the fault symptoms as shown in the following table:When a fuse element blows, first check whether the high-voltage side fuse or the lightning arrester gap has short-circuited to ground. If no abnormalities are found during external inspection, it can be concluded that an i
08/26/2025
Usage and Maintenance of Fuses
Usage and Maintenance of Fuses
Use and MaintenanceIn low-voltage power distribution systems, fuses are protective electrical devices. Widely used for power grid and electrical equipment protection, fuses automatically cut off circuits when short circuits or overloads occur in the grid or equipment, preventing damage to electrical devices and preventing accidents from spreading.A fuse consists of an insulating base (or support), contacts, and a fuse element. The fuse element is the primary working component, acting like a spec
08/26/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!