According to the IEEE C37.122 standard, what are the routine tests for high-voltage gas-insulated substations (GIS)?

Dyson
Dyson
Field: Electrical Standards
China

As required for routine tests of gas-insulated metal-enclosed switchgear, it is necessary to ensure that each equipment unit undergoes systematic routine tests before leaving the factory. These tests (also known as production tests) core on confirming the consistency between the equipment's operating status and design requirements as well as type-test parameters, serving as an indispensable quality control link after assembly. Test parameters are directly derived from type-test data, so routine test results must align with type-test data within specific tolerance ranges.

Implementation Specifications for Dielectric Tests

Dielectric tests shall be carried out after completing mechanical routine tests, aiming to verify the dielectric performance of GIS, ensure correct equipment assembly and qualified dielectric manufacturing quality of components, and inspect for internal particles or contaminants.

  • Power Frequency Dielectric Test: Routine tests adopt the form of power frequency withstand voltage tests, excluding impulse tests such as lightning and switching impulse tests. Under the minimum functional SF₆ pressure, the following parts shall be tested: phase-to-ground, phase-to-phase (for three-phase-in-one-enclosure designs), and the breaks of open switching devices. The main criterion for passing the test is that the equipment can withstand the one-minute withstand voltage value without disruptive discharge.

  • Partial Discharge Measurement: This item is used to detect material or manufacturing defects, and shall be conducted simultaneously with dielectric tests after mechanical routine tests, covering all components of GIS.

Requirements for Main Circuit Resistance Measurement

A 100A DC current shall be used to measure the voltage drop or resistance value of the main circuit, with the allowable deviation of test data from type-test data controlled within ±20%.

Operation Procedures for Tightness Tests

During the test, SF₆ pipelines, leakage detectors, full-area inspection tools for enclosure components, SF₆ pressure gauges, and density monitoring devices shall be used to inspect for leaks in all parts of the equipment.

Standards for Enclosure Pressure Tests

Enclosures shall undergo pressure tests after machining:

  • The test pressure for welded aluminum and steel enclosures is 1.3 times the design pressure;

  • The test pressure for cast enclosures is 2 times the design pressure.

Automated test stations can immediately perform tightness tests with helium after the enclosure pressure tests. The specific standards are as follows:

  • Welded aluminum/steel enclosures: 1.3 times the design pressure;

  • Cast aluminum/composite aluminum enclosures: 2 times the design pressure.

The test pressure shall be maintained for at least 1 minute, and no rupture or permanent deformation of the enclosure is allowed.

The above test procedures are all implemented in accordance with the IEEE C37.122 standard to ensure that the mechanical strength, dielectric performance, and sealing reliability of each GIS equipment meet the factory requirements.

Give a tip and encourage the author!
Recommended
 Latest Standards for Surge Arresters in Cable Auxiliary Equipment (2025)
Latest Standards for Surge Arresters in Cable Auxiliary Equipment (2025)
Standards for Surge Arresters Used in Cable Auxiliary Equipment GB/T 2900.12-2008 Electrotechnical Terminology – Surge Arresters, Low-Voltage Surge Protective Devices, and ComponentsThis standard defines specialized terminology for surge arresters, low-voltage surge protective devices, and their functional components. It is primarily intended for use in drafting standards, writing technical documents, translating professional manuals, textbooks, journals, and publications. GB/T 11032-2020 Metal-
Edwiin
10/21/2025
Comprehensive Analysis of Global Transformer Standards
Comprehensive Analysis of Global Transformer Standards
Comparison of Domestic and International Transformer StandardsAs a core component of power systems, the performance and safety of transformers directly affect grid operation quality. The IEC 60076 series standards established by the International Electrotechnical Commission (IEC) correspond multidimensionally with China’s GB/T 1094 series standards in technical specifications. For example, regarding insulation levels, IEC specifies that power frequency withstand voltage for transformers rated at
Noah
10/18/2025
Key Differences: IEEE vs IEC Vacuum Circuit Breakers
Key Differences: IEEE vs IEC Vacuum Circuit Breakers
Differences Between Vacuum Circuit Breakers Complying with IEEE C37.04 and IEC/GB StandardsVacuum circuit breakers designed to meet the North American IEEE C37.04 standard exhibit several key design and functional differences compared to those conforming to IEC/GB standards. These differences primarily stem from safety, serviceability, and system integration requirements in North American switchgear practices.1. Trip-Free Mechanism (Anti-Pumping Function)The "trip-free" mechanism—functionally eq
Noah
10/17/2025
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122The final assembly of the gas - insulated substation (GIS) takes place in the field. This is where all the diverse components that make up the GIS are brought together for the first time. Even if it were possible to fully assemble the GIS in a factory, it would still have to be disassembled for transportation, shipped, and then reassembled at the installation site.The objective of the field tests is to confirm that
Dyson
04/07/2025
Send inquiry
Download
Get the IEE Business Application