1. Summarium Accidentis

Explosio GIS in novo constructo substationis 110kV facta est tempore commissionis ob circuitum secundarium PT short-circuit. Licet causa sit simpliciter, tamen consequentiae gravioris sunt, quae ad reflectionem provocant.

2. Processus Accidentis

In die transmissionis electricitatis:

  • Supra alimentatio electricitatis caricae est 110kV GIS (apparatus combinatus).

  • Post 20s clausurae commutatoris ingressi et primae impingendi 110kV bus, fumus albus emersit inter compartmentum PT et cabinetum controlis.

  • Intra decem secunda, compartimentum GIS PT bus explosit. Supra alimentatio interrupta est; discus insulator PT compartimenti ruptus est, fragmentis insulatoris et SF₆ comburentibus productis GIS camera plena est.

3. Analyse Causae
3.1 Investigatio In Situ

PT 110kV (Shanghai MWB, typus electromagneticus) habuit:

  • 1 fundamentale winding secundarium: 100/√3 V (150VA, classis 0.2).

  • 1 auxiliare winding secundarium: 100V (150VA, classis 3P), non usitatum per designum (ductum ad terminal block cabinetum controlis, nulla externa connectio).

Inventio Clavis:

  • Phasus C: Graviter insulatio PT winding secundarii combusta; conductor fundamentalis carbonizatus. Insulatio conductoris auxiliaris totaliter combusta; insulatio cylindrus inter auxiliare winding et ferrum core carbonizatus. Resistentia insulatio inter fundamentalis et auxiliare windings = 0.

  • Phasus B: Externa insulatio winding secundarii fundamentalis habuit signa combustionis; film pictura interna intacta. Superficies insulatio winding auxiliaris monstravit carbonizatum ab overheating.

  • Phasus A: Slight superficies insulatio winding secundarii fundamentalis combusta; alii conductores/insulatio intacta.

Conclusio Praeliminalis: Circuitus secundarius PT short-circuit, verisimile in winding auxiliaris B/C phasus.

Ulterior inspectio cabineti controlis: Winding auxiliaris B/C phasus shorted intra. Conectio designata (C - ncf ad terminalem 11, B - nbf ad terminalem 15) fuit misrouted (C - ncf ad 12, shorting ad 14 - cf; B - nbf ad 16, shorting ad 18 - bf).

3.2 Progressus Accidentis

  • Initium short-circuit: Post clausuram systematis primarii, winding auxiliaris B/C phasus (cf, ncf; bf, nbf) shorted → B/C voltage cadit.

  • Finis short-circuit B phasus: Post 20s, B phasus short-circuit disjunctus (arcus ignis conducens principale). Tempus breve causavit solum B winding auxiliaris overheating.

  • Consequencia C phasus: 43s short-circuit (per accident recording) overheated C phasus secundarius conductor → insulatio melt/char. Fumus albus hinc venit.

  • Insulatio defectiva: Melt insulatio winding auxiliaris PT degradavit gas SF₆ in camera PT → minor insulatio level.

  • Discharges: Reducta insulatio + proxima distantes phase-to-ground → A/B/C phases dischargerunt ad GIS shell.

  • Explosio: Energia arcus elevavit pressionem camerae gaseosae → discus insulator PT rupit.

3.3 Error Humanus

Tempore commissionis:

  • Technici reviderunt polaritatem/insulatio PT.

  • Pro comoditate, removerunt circuitum secundarium PT ab terminal block cabineti controlis.

  • Errone shorted finibus winding auxiliaris B/C phasus; non verificaverunt → B/C winding auxiliaris shorted.

4. Precautiones Preventivae
4.1 Securitas Circuiti Secundarii PT

Short-circuits in circuitu secundario PT laedunt componentes aut incendunt PTs. Installati in camera GIS clausa, defectus PT causant explosions (risicum laesionis, mora reparations). Itaque, installatio/wiring GIS PT postulat strictam attentionem.

4.2 Protocollum Circuiti Secundarii

"Regulationes Operis Securitatis Electricae" et "Regulationes Securitatis Operis in Situ Protectionis Relativae" mandant tickets securitatis operis secundarii pro disassembly/wiring. Usus horum (et integratio controlis risici) potuit praeventisse wiring erratum in pressione operis/temporis.

4.3 Testes Pre-Energization

Robora testes pre-energization PT (standardizati, documentati). Enforce stricta executio testorum ut errores ex negligentia operis evitentur.

4.4 Measures Organizationalis et Protectivae

Protege apparatus commissionatis (claudere cabinets, uti sigillis). Modifica post approbationem; habe supervisum restitutio.

4.5 Remotio Circuiti Non Usitati

Remove circuitus secundarios non usitatos (reducit risicum erroris). Hic, winding auxiliaris non usitatus (ductus ad cabinetum controlis) causavit accidentem per miswiring.

4.6 Aer Switch PT Corpus

Installa aer switches secundarios in box wiring corporis PT (setup currentis in cabinetis controlis non potest protegere circuits GIS-PT). Hoc isolat defectus infra outlet secundarium PT.Per reconstructionem accidentis, analysin causarum, et propositionem sex precautionum preventivarum, roadmap pro securitate circuiti secundarii GIS constituitur.