• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Auto Reclosing Scheme of Transmission System

Electrical4u
Electrical4u
Field: Basic Electrical
0
China

What Is Auto Reclosing Scheme Of Transmission System

The extra high voltage transmission lines transmit huge amount of electric power. Hence, it is always desirable that the continuation of power flow through the lines should not be interrupted for a long time. There may be a temporary or permanent fault in the lines. Temporary faults get automatically cleared, and these do not require any attempt for fault rectification. It is normal practice by the operators that after each initial faulty tripping of the line, they close the line. If the fault is transient, the line holds after the second attempt of closing the circuit breaker, but if the fault persists, the protection system again trips the line and then it is declared as permanent fault.
But as the extra high voltage transmission lines carry huge power, if any delay occurs due to manual operation for reclosing the circuit, there will be a big loss of system in the view of cost and stability. By introducing the auto reclosing scheme in the extra high voltage transmission systems, we can avoid the unwanted delay due to human operation. We categorize the faults in electrical transmission system in three ways,

  1. Transient Fault

  2. Semi Permanent Fault

  3. Permanent Fault

auto reclosing scheme of transmission systemThe transient faults are those which automatically removed momentarily. Semi permanent faults are also transient in nature but there take few moments to remove. Semi-permanent faults may get occurred due to the falling of things on the live conductors. Semi-permanent faults get removed after the cause of faults is burnt away. During both of the above mentioned faults, line is tripped but the line can be restored if the circuit breakers associated with the line are closed.

Auto-recloser or auto-reclosing scheme exactly does this. In an overhead transmission system, 80% of the faults are transient, and 12% of faults are semi-permanent. In auto-reclosing scheme if the fault is not cleared at first attempt, there will be double or triple shorts of reclosing until the fault is cleared. It the fault still persists, this scheme permanently opens the circuit breaker. A prescribed time delay may be imposed on the auto-reclosing system to permit the semi-permanent fault to remove from the circuit.

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Give a tip and encourage the author!
Recommended
THD Measurement Error Standards for Power Systems
THD Measurement Error Standards for Power Systems
Error Tolerance of Total Harmonic Distortion (THD): A Comprehensive Analysis Based on Application Scenarios, Equipment Accuracy, and Industry StandardsThe acceptable error range for Total Harmonic Distortion (THD) must be evaluated based on specific application contexts, measurement equipment accuracy, and applicable industry standards. Below is a detailed analysis of key performance indicators in power systems, industrial equipment, and general measurement applications.1. Harmonic Error Standar
Edwiin
11/03/2025
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Solid insulation assistance combined with dry air insulation is a development direction for 24 kV ring main units. By balancing insulation performance and compactness, the use of solid auxiliary insulation allows passing insulation tests without significantly increasing phase-to-phase or phase-to-ground dimensions. Encapsulation of the pole can address the insulation of the vacuum interrupter and its connected conductors.For the 24 kV outgoing busbar, with the phase spacing maintained at 110 mm,
Dyson
11/03/2025
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
Ring main units (RMUs) are used in secondary power distribution, directly connecting to end-users such as residential communities, construction sites, commercial buildings, highways, etc.In a residential substation, the RMU introduces 12 kV medium voltage, which is then stepped down to 380 V low voltage through transformers. The low-voltage switchgear distributes electrical energy to various user units. For a 1250 kVA distribution transformer in a residential community, the medium-voltage ring m
James
11/03/2025
What Is THD? How It Affects Power Quality & Equipment
What Is THD? How It Affects Power Quality & Equipment
In the field of electrical engineering, the stability and reliability of power systems are of paramount importance. With the advancement of power electronics technology, the widespread use of nonlinear loads has led to an increasingly serious problem of harmonic distortion in power systems.Definition of THDTotal Harmonic Distortion (THD) is defined as the ratio of the root mean square (RMS) value of all harmonic components to the RMS value of the fundamental component in a periodic signal. It is
Encyclopedia
11/01/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.