Bincike na Tattalin GIS Equipment
Yadda Ake Iya Gargajiya Don Tattalin GIS Equipment
Karki, ya kamata a gina aiki da kare kan masana a cikin dararwa. Kafin haka, ya kamata a gina wanda ake magance a tafin chanel steel don kawo aiki tsakanin chanel steel zuwa gidajen. Ana iya samun shi da roller ko forklift don kawo shi. Kafin kawo shi a yi aiki ba, ana bukata a yi gargajiya masu yawa daga baya. Karki, ana bukata a yi nufin da aiki ga aiki don tabbatar da aiki ya kai hukuma da ma'adar suka. Duka, ana bukata a yi aiki mai sauri ga aiki don tabbatar da aiki ya ci gaba da zama. Idan haka, ana bukata a kirkiro tushen bayani da takalmafi masu yawan lafiya da za a yi daidai.
A cikin aiki, ana bukata a tabbatar da abubuwan da suka:
Akwai bukatar a yi aiki ga sadarwa, rokon rawa, da tashirwa a wurin da ake tattauna aiki, kuma a yi aiki ga sadarwa ta hanyar kula.
An bukata masu mallakarwa masu aiki don kawo aiki a lokacin da ake tattauna aiki.
Tabbatar da adana amfani da rikitar da take mika da jiki da za a amfani da su kafin a yi aiki.
Ana bukata a yi wurin da ake kula da kyau a wurin da ake tattauna aiki don kudeta alatun, mutanen, da abubuwan da za a amfani da su, kuma a yi kartun da ake kula da alatun da mutanen da za a amfani da su.
Wurin da ake tattauna aiki ya bukata a kula da kyau. Ana bukata a kula da floor leather a wurin, kuma ana bukata a kula da vacuum cleaner ko mop mai ruwa a lokacin haruwa.
Ana bukata a yi mobile power strip (380 V, 220 V) don kula da duk wurin da ake tattauna aiki.
Mutane da ba suka samun ido ba suna da yiwu a gine a wurin da ake tattauna aiki a lokacin da ake tattauna aiki.
Binciken faduwar abubuwan da ke da lalace da ayyukan da za a yi wa su:
Faduwar 1: Rikicin Maza
Ayyukan da za a yi wa su:
Kafin aiki, mallam aiki ya bukata a bayyana masu aiki game da abubuwan da ke da lalace da za a gine a cikin aikin.
Tabbatar da adana nufin da aiki ya kai hukuma da za a yi, kafin haka ake gine aiki.
Rikice gaba-gaban aiki.
Faduwar 2: Lallace da Take Bisa Da Gas SF₆
Gas SF₆ an yi aikin da ake tsa da electric arc, akwai lallace da take bisa da su, kafin ake gine a cikin su, za a iya rikicin mutum. Ayyukan da za a yi wa su:
Kafin a bukata GIS cylinder, masu aiki suna da yiwu a gine a wurin da ke goma, kuma a yi kula da kyau a lokacin da na 0.5 awa.
Masu aiki da ke gine a cikin gas, suna da yiwu a gine uniform da maska.
Faduwar 3: Faduwar da Na Samu Pressure da Gas Chamber
Ayyukan da za a yi wa su:
Rikice da kara gas SF₆, kuma a yi mallaka da kiyaye instrument ga aiki.
Idan haka, a tabbatar da adana kara pressure da gas SF₆ ya kai hukuma, kafin haka ake gine a bukata bolts da ke kula cover plate ko flange.
Tattalin GIS Equipment
Mas'ulliyoyin Masana GIS Equipment
A lokacin da ake tattauna aiki, masana ya yi tushen bayani da mallakarwa masu aiki, kuma ya bayyana aiki ga masu aiki da ke tattauna aiki a lokacin da na farko. Abubuwan da za a yi wa su:
Bayyana tushen bayani da za a amfani da su a lokacin da ake tattauna aiki.
Bayyana tushen bayani a lokacin da ake tattauna aiki, kawo, da aiki.
Nufin da aiki ga mutanen da ke kula da tank, kuma a yi nufin da aiki ga quality.
Bayyana abubuwan da ke da wiring cables, cable tags, da terminal blocks daga local control cabinet zuwa aiki.
Mas'ulliyoyin Yankin da Ke Tattauna Aiki
Don mallakarwa masu aiki GIS equipment da mallakarwa masu aiki, yankin da ke tattauna aiki ya bukata a yi abubuwan da su:
Gina aiki da kara packaging.
Kawo da kula GIS equipment.
Kawo, kula, da nufin da aiki ga mutanen da ke kula da tank.
Yi aiki da vacuum-pumping, gas-filling, leak-detection da wrapping, da micro-water detection.
Kawo da kula grounding plates, install product supports, maintenance platforms, da control cabinets.
Yi aiki da resistance tests, da characteristic tests of current transformers, voltage transformers, circuit breakers, grounding switches, da disconnectors.
Kula bolts da ke kula flange joints a waje na tank.
Lay cables da kula wiring work.
Amfani da anti-corrosion silicone grease a lokacin da ake tattauna aiki a cikin flange joint positions.
Control Process na Tattalin Aiki: Karki, a yi nufin da aiki ga baya-bayan bayan, don tabbatar da aiki ya kai hukuma da drawing requirements. Kafin haka, a yi kula da bayan a cikin wurun da ke kula, kula da lint-free paper mai alcohol, kuma kula da interfaces. Kafin haka, a yi kula da bayan, tabbatar da aiki ya kai hukuma da technological requirements. Kafin haka, a yi secondary debugging da aiki ga system din, don tabbatar da aiki ya kai lafiya. A cikin aiki, ana bukata a tabbatar da abubuwan da suka:
Za a tabbatar da aiki ya kai hukuma da drawing requirements, kafin haka ake gine aiki, don tabbatar da aiki ya kai lafiya.
Kulun bayan da bayan, za a tabbatar da aiki ya kai hukuma da cleanliness requirements, don tabbatar da aiki ya kai lafiya.
Nufin da Aiki Ga Tattalin GIS Equipment
Metal surfaces da insulating surfaces da ke cikin components GIS equipment, suna bukata a yi nufin da aiki ga su. Tabbatar da adana kula da scratches, uneven areas, ko dust a cikin surface da dukkan components, don tabbatar da aiki ya kai hukuma da internal electric field GIS equipment da aiki ya kai lafiya.
Acceptance na GIS Equipment
A lokacin da ake tattauna aiki GIS equipment, acceptance ita ce muhimmanci. A yi nufin da aiki ga GIS equipment, za a tabbatar da aiki ya kai hukuma da design specifications da quality standards, kafin haka ake gine aiki ga lafiya. A cikin aiki, ana bukata a tabbatar da abubuwan da suka:
Nufin da aiki ga appearance GIS equipment, don tabbatar da aiki ya kai hukuma da damages ko defects.
Nufin da aiki ga wiring da mechanisms control cabinet, including electrical circuits, sensors, heaters, da drive systems, don tabbatar da aiki ya kai lafiya.
Test electrical operating performance GIS equipment, don tabbatar da aiki ya kai hukuma da functional requirements electrical operation.
A cikin types da dama GIS equipment, methods da za a amfani da su za a iya kasancewa. Misali, a cikin hydraulic spring mechanism circuit breaker, ana bukata a yi measurements da analysis oil pressure, speed, da opening/closing time, don tabbatar da aiki ya kai hukuma da stable and reliable. A cikin mechanical transmission devices, ana bukata a yi tests characteristics motion accuracy da stability, don tabbatar da aiki ya kai hukuma.
Key Points na Tattalin GIS Equipment Control
Technological Requirements na Tattalin GIS Equipment
Masu aiki suna bukata a tabbatar da basic construction methods da technical requirements a cikin relevant maintenance regulations ko on-site maintenance plans. Kafin spare parts suka gine a site, ana bukata a yi unpacking da nufin da aiki ga shi, kuma a yi comparison da on-site equipment. Kafin haka, ana bukata a yi inventory da register spare parts da tools. Idan haka, a tabbatar da aiki ya kai hukuma, kafin haka ake gine aiki. A lokacin da ake kawo da kula equipment, actions suna bukata a yi slow, don tabbatar da collisions. A lokacin da ake kula tank, ana bukata a yi dust-proof da moisture-proof measures wa:
Usage requirements na SF₆ gas recovery devices wa:
Gas cylinders suna bukata a gine amfani da safety da vibration-proof rubber rings, kuma ana bukata a gine clearly labeled, don tabbatar da confusion between old and new gases. Tank-opening work suna bukata a gine review. Review work suna bukata a gine assigned to dedicated personnel, especially to check tightness da internal screws. Idan haka, ana bukata a gine review marks on each screw, kafin haka person in charge ya gine final inspection. Tightening torque da bolts, suna bukata a gine applied as required by the manufacturer.Selection da usage requirements na lubricating greases da sealing greases wa:
Technological requirements na disassembly da assembly sealing surfaces wa:
Technological requirements na replacing adsorbents wa:
Technological requirements na vacuum-pumping wa:
Technological requirements na filling SF₆ gas wa:
Technological requirements na local cover-type leak detection wa:
Inspection Work After GIS Equipment Installation
After the GIS equipment installation is completed, strict inspection and acceptance are required. Each component should be inspected in detail to ensure its quality and performance meet the standards. Then, a comprehensive inspection and test of the entire system should be carried out to ensure its normal operation and prevent potential safety hazards for users.
Only by carefully completing each step of the preliminary work can all tasks of subsequent work be successfully accomplished.
Effective Strategies for Optimizing GIS Equipment Installation Processes and Key Control Points
Implementing Safety Measures in GIS Equipment Installation
During the GIS equipment installation process, safety is a crucial aspect. To ensure the normal operation of the equipment and the safety of personnel's lives and property, a series of safety measures need to be taken, as follows.

Strengthening Inspection and Maintenance of GIS Equipment after Installation
Pay attention to safety protection measures. During operation, relevant regulations and standards must be strictly adhered to. Appropriate personal protective equipment should be worn to avoid accidents. Meanwhile, management of the on-site environment should also be strengthened to prevent dust, oil stains, etc. from entering the interior of electrical components and affecting their normal operation.
Monitor changes in equipment status. In daily use, attention should be paid to changes in the equipment's status, such as temperature rise and abnormal current fluctuations, so that corresponding measures can be taken in a timely manner.
Maintain records and feedback. For any problems or defects discovered, timely recording and reporting should be carried out, and solutions should be submitted to relevant departments for improvement and refinement. Based on actual conditions, formulating a reasonable inspection and maintenance plan to enhance the safety performance and service life of the equipment is one of the important means to achieve efficient and stable operation of GIS equipment.
Improving the Quality Control of On-site Gas Filling for GIS Equipment
The inspection and maintenance requirements for gas pipelines are as follows:
All connecting pipelines and connection components should be in good condition, clean, and free of oil stains. The connection between the pipeline and the product should be kept clean and can be wiped with lint-free paper dipped in alcohol.
Before a pipeline that has been out of use for more than 10 days is reused, it needs to be purged and cleaned with high-purity nitrogen. After pipeline operations are completed, the connection heads should be sealed with plastic caps to prevent dust and foreign objects from entering.
Install filters at the gas-filling joints of pipelines to ensure the quality of gas filling.
Strengthening the Emergency Management of GIS Equipment
The specific measures for strengthening the emergency management of GIS equipment are as follows:
In case of a malfunction, immediately stop the operation, notify relevant personnel for handling, and promptly contact the maintenance department or the technical support team of the manufacturer to resolve the issue quickly. In case of emergencies such as fires or explosions, evacuate the site as soon as possible to avoid casualties.
In case of equipment damage, immediately stop the machine and notify the relevant department for handling. Meanwhile, isolate the damaged part to prevent other components from being affected. If necessary, temporary repair methods can be adopted to ensure the normal operation of the equipment.
Pay attention to basic safety issues, such as the wiring method of electrical circuits and the selection of power supply voltage. In actual operation, strictly comply with relevant safety regulations and standards to ensure that the device can operate normally without endangering the surrounding environment.
Conclusion
In conclusion, during the installation process of GIS equipment, it is necessary to strictly comply with relevant standards and specifications to ensure the safe and stable operation of the equipment. At the same time, attention should also be paid to issues such as the connection methods and circuit layout between equipment to ensure the stability and reliability of the system. In addition