Anailís ar an gCruthúnas GIS Equipment Installation Process
Pre - installation Preparations for GIS Equipment
Ar dtús, úsáid crainn chun an t-equipment a dhéanamh suas go dtí an dorus. Ansin, cuir ceannaire isteach sa ghroove steel channel chun an t-equipment a bhogadh síos an channel steel isteach sa seomra. Is féidir é a lorg ag rólóir nó forklift le haghaidh an t-ionadú. Roimh an t-suíomhú, tá roinnt oiriúnachtaí réamhshocraithe riachtanach. Ar dtús, ní mór do the equipment a sheiceáil agus a thástáil go coitianta chun cinntiú go bhfuil sé in líne leis na stándáird dearaithe agus na spéisifící. Ina dhiaidh sin, ní mór obair uatharais agus maointe a dhéanamh ar an t-equipment chun a chinntiú go mbeidh sé ag obair go normal. Sa deire, ní mór pleananna oibre sainiúla agus modhanna oibre a fhorbairt agus a chur i bhfeidhm go cruinn.
I measc na bpuntai suntasa is gá a bheith measctha san oibriú fíor:
Caithfidh na tionscadail in eagar talmhaíochta, solais, agus aicmíocht a bheith críochnaithe agus a bheith tar éis na díbhreitheoireachta.
Níos mó ná riarthóirí gnách a bheidh ag treorú an hoirthint ag am an tionscadal.
Cinntigh go bhfuil an t-eolas solais agus an t-eolas fuinnimh riachtanach in acmhainn a úsáid go cruinn roimh an tionscadal.
Níos mó ná seomra stórála dúnta agus glas le haghaidh na gcuidiúchán, na bpáirteanna, agus na neart eile a bheidh suite i gceantar na gcuidiúchán ag an áit a bheidh an tionscadal ag tarlú, agus cart aicmeach a sholáthar chun na gcuidiúchán agus na bpáirteanna a thiomáint.
Ní mór go mbeidh an suíomh agus an urlár go beacht. Ní mór clódh urlár a chur ar an urlár, agus an urlár a dhúntas gach lá le hoircín vacuaim nó le mop uisceach.
Ba chóir striop chumhacht mobhail (380 V, 220 V) a sholáthar ar an áit a bheidh an tionscadal ag tarlú.
Ní mór daoine gan cead a dhíchumasú ó dhlíthint an áit a bheidh an tionscadal ag tarlú le linn an choimeád.
Is mar seo a dhéantar anailís ar phointeanna córais agus bearta scóthach:
Pointe Córas 1: Diancharnacht ar Dhaoine
Is mar seo a dhéantar na bearta scóthach:
Roimh an obair, ní mór don uachtarán obair a chur in iúl do na hoibrithe faoi na cuid a bheidh beo agus comhcheangailte lenár n-obair.
Seiceáil go cruinn an réimse aicmiúcháin agus ná tosaigh an obair go dtí go mbeidh tú cinnte go bhfuil sé in ord.
Glacadh leis an dá taobh den réimse aicmiúcháin.
Piont Córas 2: Tóideachas Deiseacha SF₆ Gas
Tá na deiseacha SF₆ gas foirfe toideach agus is féidir leo a bheith go mór ar a dtugtar airgeadóirí nuair a teagmháil leo. Is mar seo a dhéantar na bearta scóthach:
Nuair a osclaíonn tú an cylinder GIS, ní mór do na hoibrithe a bheith ina luatha agus a chur ar siúl ventilation ar feadh 0.5 uair an chloig.
Ní mór do na hoibrithe a bheith ag plé leis na cúrsaí a bheith ag plé le cleite agus másc.
Piont Córas 3: Piont Córas Agus Brú ar an gGas Chamber
Is mar seo a dhéantar na bearta scóthach:
Athraigh agus lán SF₆ gas, agus tabhair duine aonair chun monatóireacht a dhéanamh ar an t-equipment instruments.
Ná déan an bolts a dhéanamh ar an gcover plate nó flange go dtí go mbeidh tú cinnte go bhfuil an brú atá ar ais SF₆ gas in líne leis an gcuid den phlean.
GIS Equipment Installation Process
Responsibilities of GIS Equipment Manufacturers
Le linn an pre - installation agus an tionscadal, déanann an tionscal cumarsáid teicniúil agus teagmháil leis na daoine a bhaineann leis, agus soláthraíonn sé oiliúint suíomhú don chéad uair a chuirfidh an tionscal ar an t-equipment. Is mar seo a bhíonn na freagrachtaí sainiúla:
Soláthraíonn an tionscal doiciméid teicniúla a bhaineann leis an tionscadal.
Soláthraíonn an tionscal treorú teicniúil tríd an tionscadal, an t-aicmiú, agus an tástáil.
Seiceáil na hábhair aicmiúcháin agus na haonracha a chur sa tank agus déan an t-aicmiúchán cáilithe deiridh.
Soláthraíonn an tionscal mide cáblach, cáblach taganna, agus terminal blocks ón gcabinet rialúcháin áitiúil go dtí an t-equipment.
Freagrachtaí na nIonad Suíomhú
Faoin treorú de phrofessionals ón tionscal GIS equipment agus faoin mbainisteoirí ar an áit, ní mór don ionad suíomhú freastal ar na tascanna seo:
Tiomáint agus aistriú an t-equipment.
Oirthint agus aicmiúchán an t-equipment GIS.
Aicmiú, nualú, agus seiceáil na hábhair aicmiúcháin sa tank.
Déan oibriú cosúil le vacuum - pumping, gas - filling, leak - detection by wrapping, agus micro - water detection.
Déan aicmiúchán agus aistriú ground plates, aistriú product supports, maintenance platforms, agus control cabinets.
Déan na tástáil ar an t-equipment, cosúil le tástáil ar resistance, agus tástáil ar characteristics transformers current, voltage, circuit breakers, grounding switches, agus disconnectors.
Gin an bolts ag gach joint flange lasmuigh den tank.
Lay cables and perform wiring work.
Apply anti - corrosion silicone grease in a timely manner at the flange joint positions during the product installation process.
Control Process Installation: First, conduct a detailed inspection of each bay to ensure it complies with the drawing requirements. Then, place the equipment bays or modules in their corresponding positions, clean them carefully with lint - free paper dipped in alcohol, and protect the interfaces. Next, connect the equipment bays, ensuring that the connections meet the technological requirements. Finally, conduct secondary debugging and testing on the entire system to ensure its trouble - free operation. In actual work, the following points need to be noted:
Equipment selection is crucial. Products with reliable quality that are suitable for the on - site environment must be chosen. For example, in plateau areas with large temperature differences between day and night, heaters need to be installed in the equipment to ensure the stability of the internal SF₆ gas. In coastal areas, anti - corrosion structures need to be considered, especially for the terminal plates of bushings, which are prone to moisture - induced corrosion, so a gluing process should be added.
Equipment installation must be carried out strictly in accordance with the drawing requirements to avoid potential safety hazards.
The connections between equipment must be carried out meticulously to meet cleanliness requirements and prevent potential discharge hazards.
Inspection During GIS Equipment Installation Process
Both the metal surfaces and insulating surfaces of GIS equipment components should be carefully inspected and cleaned. Ensure that there are no scratches, uneven areas, or dust on the surfaces of all components, so as to guarantee a uniform internal electric field of the GIS equipment and its long - term stable operation.
GIS Equipment Acceptance
During the installation of GIS equipment, acceptance is a crucial step. Through comprehensive inspection and testing of GIS equipment, it can be ensured that it complies with design specifications and quality standards, and subsequent operations can proceed smoothly. In practical work, the following steps should be followed:
Inspect the appearance of the GIS equipment to confirm whether there are any damages or defects.
Check the wiring of the control cabinet and its mechanisms, including electrical circuits, sensors, heaters, and drive systems, to ensure normal operation.
Test the electrical operating performance of the GIS equipment to ensure it meets the functional requirements for electrical operation.
For different types of GIS equipment, the specific acceptance methods may vary. For example, for the hydraulic spring mechanism of a circuit breaker, factors such as oil pressure, speed, and opening/closing time need to be measured and analyzed to determine whether its operating state is stable and reliable. For mechanical transmission devices, tests on characteristics such as motion accuracy and stability are required for evaluation.
Key Points of GIS Equipment Installation Control
Technological Requirements during GIS Equipment Installation
Construction workers should be familiar in advance with the basic construction methods and technical requirements according to relevant maintenance regulations or on - site maintenance plans. Upon the arrival of spare parts at the site, they should be unpacked and inspected immediately and compared with the on - site equipment. Before starting work, dedicated personnel should take inventory of and register spare parts and tools. If any damage or shortage is found, work is prohibited until they are replenished. During the equipment disassembly and restoration processes, actions must be slow to avoid collisions.During tank - opening maintenance, dust - proof and moisture - proof measures should be taken as follows:
The usage requirements for SF₆ gas recovery devices are as follows:
Gas cylinders should be equipped with safety and vibration - proof rubber rings and clearly labeled to prevent confusion between old and new gases. Tank - opening work should be reviewed. The review work should be assigned to dedicated personnel, especially to check the tightness of internal screws. If necessary, review marks should be made on each screw, and then the person in charge should conduct a final inspection. The tightening torque of bolts should be applied as required by the manufacturer.The selection and usage requirements for lubricating greases and sealing greases are as follows:
The technological requirements for disassembly and assembly of sealing surfaces are as follows:
The technological requirements for replacing adsorbents are as follows:
The technological requirements for vacuum - pumping are as follows:
The technological requirements for filling SF₆ gas are as follows:
The technological requirements for local cover - type leak detection are as follows:
Inspection Work after GIS Equipment Installation
After the GIS equipment installation is completed, strict inspection and acceptance are required. Each component should be inspected in detail to ensure its quality and performance meet the standards. Then, a comprehensive inspection and test of the entire system should be carried out to ensure its normal operation and prevent potential safety hazards for users.
Only by carefully completing each step of the preliminary work can all tasks of subsequent work be successfully accomplished.
Effective Strategies for Optimizing GIS Equipment Installation Processes and Key Control Points
Implementing Safety Measures in GIS Equipment Installation
During the GIS equipment installation process, safety is a crucial aspect. To ensure the normal operation of the equipment and the safety of personnel's lives and property, a series of safety measures need to be taken, as follows.

Strengthening Inspection and Maintenance of GIS Equipment after Installation
Pay attention to safety protection measures. During operation, relevant regulations and standards must be strictly adhered to. Appropriate personal protective equipment should be worn to avoid accidents. Meanwhile, management of the on - site environment should also be strengthened to prevent dust, oil stains, etc. from entering the interior of electrical components and affecting their normal operation.
Monitor changes in equipment status. In daily use, attention should be paid to changes in the equipment's status, such as temperature rise and abnormal current fluctuations, so that corresponding measures can be taken in a timely manner.
Maintain records and feedback. For any problems or defects discovered, timely recording and reporting should be carried out, and solutions should be submitted to relevant departments for improvement and refinement. Based on actual conditions, formulating a reasonable inspection and maintenance plan to enhance the safety performance and service life of the equipment is one of the important means to achieve efficient and stable operation of GIS equipment.
Improving the Quality Control of On - site Gas Filling for GIS Equipment
The inspection and maintenance requirements for gas pipelines are as follows:
All connecting pipelines and connection components should be in good condition, clean, and free of oil stains. The connection between the pipeline and the product should be kept clean and can be wiped with lint - free paper dipped in alcohol.
Before a pipeline that has been out of use for more than 10 days is reused, it needs to be purged and cleaned with high - purity nitrogen. After pipeline operations are completed, the connection heads should be sealed with plastic caps to prevent dust and foreign objects from entering.
Install filters at the gas - filling joints of pipelines to ensure the quality of gas filling.
Strengthening the Emergency Management of GIS Equipment
The specific measures for strengthening the emergency management of GIS equipment are as follows:
In case of a malfunction, immediately stop the operation, notify relevant personnel for handling, and promptly contact the maintenance department or the technical support team of the manufacturer to resolve the issue quickly. In case of emergencies such as fires or explosions, evacuate the site as soon as possible to avoid casualties.
In case of equipment damage, immediately stop the machine and notify the relevant department for handling. Meanwhile, isolate the damaged part to prevent other components from being affected. If necessary, temporary repair methods can be adopted to ensure the normal operation of the equipment.
Pay attention to basic safety issues, such as the wiring method of electrical circuits and the selection of power supply voltage. In actual operation, strictly comply with relevant safety regulations and standards to ensure that the device can operate normally without endangering the surrounding environment.
Conclusion
In conclusion, during the installation process of GIS equipment, it is necessary to strictly comply with relevant standards and specifications to ensure the safe and stable operation of the