• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Ga wasu abubuwa na dakin kudin kudin karkashin sararin kungiyar zuwa? Duk da haka, wannan bayanin ya kunshi: - Duk da haka, aikace-aikacen kudin karkashin sararin kungiyar - Tushen kudin karkashin sararin kungiyar da ke taimakawa wajen kudin karkashin sararin kungiyar - Ingantaccen kudin karkashin sararin kungiyar don samun inganci da kula da darasi - Bayyana cewa kudin karkashin sararin kungiyar yana da muhimmanci ga tushen kudin karkashin sararin kungiyar da ke taimakawa wajen kudin karkashin sararin kungiyar - Kudin karkashin sararin kungiyar da ke taimakawa wajen kudin karkashin sararin kungiyar da ke taimakawa wajen kudin karkashin sararin kungiyar

Dyson
Dyson
فیلڈ: Maƙarfi na Elektirikin Dabi
China

A cikin mutanen masana, ina yi aiki a yau da zuwa EV charging piles kowace rana. Daga musamman kan gida ta hanyar yanayi a duniya da kuma tattalin arziki na China, an samu zama ne a fadada green mobility kamar e - bikes da electric cars, amma masu shirya shiga batere suka zama abubuwan da ake duba. Masu shirya shiga batere na "Bypass Wire" wanda ke da hada tsaro ya haɗa a yi buƙata a yi aiki don professional piles. Ba a yi aiki a gasar CNPC First Construction residential charging pile renovation, ina ba da shawarwari game da aikinsa.

I. Gargajiya na Tashar Aiki
(1) Electric Vehicles: Tsarin Kirkiro

Yanzu, EVs, daga e - bikes/tricycles zuwa electric cars, sune da AC charging piles. Saboda ilimi na batere - mai inganci (mai inganci na energy density, lithium - ion/solid - state batteries, fast - charging), da kuma smart driving da vehicle - to - network tech (wanda ke ajiyawa auto - drive, cruise control, remote monitoring, etc.) suna yi karfin EVs.

(2) Charging Piles: Kasuwanci na Yawan Mafi Mu'amala

An kafa charging pile market na China a cikin AC/DC (AC ita ce mafi yawa), tun daga baya har zuwa 10.804 million units a watan Yuli 2024. Su ne a cikin kungiyoyi (don large lots, transit) ko a cikin kasa (don small lots, communities). Ina yi aiki a cikin low - power decentralized AC piles, wadanda suke magance power zuwa on - board chargers (da ake canza zuwa DC).

II. Tashar Aikin Charging Pile: Daga Standards zuwa Custom Builds
(1) General Requirements: Kyakkyawan, Funtuka, Installation

Tashar aiki yana da kyakkyawan power, fire, flood infrastructure. Kafin ake fito piles, ake iya samun power, bayan kuɗi, a wurare na dust, non - corrosive areas (ko downwind idan ake bukata). Ake sauya vibrations, ake tabbatar da traffic access, da kuma ake fara a matsayin ≥40cm safe distance dari structures don maintenance.

Funtukan, interfaces suna da unified standards don universal compatibility. Multiple power options, efficient conversion, anti - interference, remote monitoring, fault diagnosis (with alarms/info upload), and diverse payments (WeChat/Alipay/cards) sune buƙata.

Installation: Floor - mounted piles sun buƙata foundation da 0.2m - high (≥0.05m larger than the pile) don shed - less areas. Wall - mounted piles suna haɗa zuwa walls, operable height, usable with/without sheds.

(2) E - Bike Piles: Gasar CNPC First Construction

Kafin gasar, "flying lead" charging ke da hada tsaro. Ina yi aikin piles for e - bikes, add them at unit entrances (shed - less communities like Zhongyou Garden) ko a cikin sheds (e.g., Zhongyou Huayuan).

  • Power Distribution: Circuits serve 6–8 piles, using WDZ - BYJ (F) - 0.8/1KV - 3×6 mm² wires (protected by steel pipes to distribution boxes, connected to upper - level standby circuits). TN - S grounding: floor - mounted piles connect to the main grid, wall - mounted piles (and sheds) ground via 40×4 galvanized flat steel. Each pile supports ≤1200W e - bikes, with single - phase sockets in sheds. Cables (0.6/1kV copper - core) and wires (halogen - free, flame - retardant) use PVC troughs/pipes indoors, direct burial outdoors (with galvanized steel pipes for building entry, sealed to prevent water). Floor - mounted piles go in unit - entrance open spaces; wall - mounted ones on unit walls (0.7–1.1m height, uniform per community, 1.2–1.5m spacing).

  • Selection: Each socket has a 220V/10A/50Hz, 2.0% - accuracy static energy meter (storing 2 settlement periods’ data, protected from loss/tampering). Piles record charge start/end, power before/after (reset to zero post - charge), with card/QR code payments and IP54+ protection (load/short - circuit/leakage protection).

(3) Electric Car Piles: Parking Lot Renovation

Decentralized AC piles are added (1 per car space) for easy management, positioned for convenience.

  • Power Distribution: 6.8kW/220V piles use circuit breakers (short - circuit/residual current protection, no shared breakers). High - quality cables/wires ensure voltage compliance. A complete grounding system (with equipotential wiring) ensures safety.

  • Interface: Standard - compliant, dust/water - resistant, universal for all EVs.

  • Control Circuit: Precise current/voltage control (damage - free, smart mode - switching, over - charge/short - circuit protection).

  • Metering/Billing: Accurate metering, flexible billing (adapting to needs/time), with data management for users/operators.

III. Load Calculation: Critical for Planning

For decentralized AC piles, determine pile specs, calculate via formulas (1)/(2), and use Table 1’s demand coefficients. This ensures a rational power distribution design.

In formulas (1) and (2), Sjs represents the calculated capacity of the charging equipment (in kVA); P1, P2, and P3 represent the total rated power of various types of charging equipment. Generally, the load grouping and classification are carried out according to single - phase AC charging piles, three - phase AC charging piles, off - board chargers, etc. (in kW); P1, P2, and P3 represent the working efficiency of various types of charging equipment, generally taken as 0.95; cosφ1, cosφ2, and cosφ2 are the power factors of various types of charging equipment, generally greater than 0.9; Kt is the coincidence factor, generally taken as 0.8 - 0.9; K is the demand factor, as shown in Table 1.

Conclusion

As public environmental awareness rises and EV technology advances, EVs, with longer ranges, lower costs, and better cost - effectiveness, will enter millions of households. Charging piles, crucial EV infrastructure, are increasingly adopted. With government - enterprise collaboration, massive charging pile construction in public/private parking lots, garages, communities, and stations is inevitable. Thus, standardized design, use, and scientific management of charging piles are vital. This paper, using real projects, summarizes the electrical design of non - motorized and motorized vehicle charging piles, offering references for similar future projects.

Ba da kyau kuma kara mai rubutu!
Tambayar Da Yawanci
Faduwar Kirki na Tausayi na Kirki na Tausa
Faduwar Kirki na Tausayi na Kirki na Tausa
Matsayin Kiransu na Biyan Kirkiya da Jirgin Kirkiya a Maimaitaccen Kirkiyar Vacuum1. BincikeIdan kana samun kalma "vacuum circuit breaker," zai iya kasancewa ba. Amma idan muna ce "circuit breaker" ko "power switch," mutane mafi yawan suka sanin cewa shi ne. A gaba daya, vacuum circuit breakers suna da muhimmanci a tattalin arziki na zaman lafiya, suna da alaka da hukuma masu kirkiya daga lalace. Yanzu, za a duba wani batu mai muhimmanci — matsayin kiransu na biyan kirkiya da jirgin kirkiya.Babu
Dyson
10/18/2025
Tattalin Zafi na Iyali da Turawa ta PV da Adaka
Tattalin Zafi na Iyali da Turawa ta PV da Adaka
1. Tattalin Karamin Kirki da Karamin Turbinuwa na ZafiTattalin karamin kirki da karamin turbinuwa na zafi (PV) yana da muhimmanci ga tushen sistema mai kudancin. Tattalin bayanai masu shekarar karamin kirki da tsarin zafi a wurare ne yana nuna cewa karamin kirki suna da inganci a lokacin gida da ranar zuwa, kuma suna da karfin karamin kirki a lokacin ranar dajiya da harmattan. Karamin turbinuwa na kirki yana da muhimmanci ga tasiri na karamin kirki, wanda yake ya ba da karshe karamin kirki.Amma,
Dyson
10/15/2025
Sistem IoT yang Yana da Noma Turbin Hawa-Shamsi don Jin da Maimaita Tsakiyar Maimai a Bini
Sistem IoT yang Yana da Noma Turbin Hawa-Shamsi don Jin da Maimaita Tsakiyar Maimai a Bini
I. Yadda na Wani da Masu Buhimmiya a ZamaYanzu, masu kungiyar gine-gine suna hanyoyi mai yawa da ke taka da juyin ruwa a kan mafi girma da kuma maso gabashin. Yakin cikakken bayanai game da yadda ake amfani da hanyoyin da suka rarraba shi ita ce muhimmiyar zuwa yakin kula da kawo ruwa a kan ma'adin. Saboda haka, zai bukata a gina duk daga cikin hanyoyin da suka rarraba shi matafiyoyi da za a yi wa bayanai. Amma, ba a tabbatar da abubuwan da za su iya aiki da kyau a kan hanyoyin wadanda suka rarr
Dyson
10/14/2025
Ko'ina Da AGV-Based Intelligent Warehouse System Da Shiga
Ko'ina Da AGV-Based Intelligent Warehouse System Da Shiga
Sistem Logistik Gudang Pintar Berbasis AGVDengan perkembangan cepat industri logistik, kelangkaan lahan yang semakin meningkat, dan biaya tenaga kerja yang naik, gudang—sebagai pusat logistik kunci—menghadapi tantangan signifikan. Seiring gudang menjadi lebih besar, frekuensi operasi meningkat, kompleksitas informasi bertambah, dan tugas pemilihan pesanan menjadi lebih menuntut, mencapai tingkat kesalahan rendah dan mengurangi biaya tenaga kerja sambil meningkatkan efisiensi penyimpanan secara k
Dyson
10/08/2025
Aika tambaya
Kwamfuta
Samun IEE Business Application
Yi amfani da IEE-Business app don samun abubuwan aikin, samun halayyin, haɗi da malamai, kuma kai tsauraran takaiddun kasoshin duka lokaci, duka wurin—dole bai karfin takamaltar hulɗin ku na alintakargida da kasuwanci.