Sa industriyal na produksyon, emergency rescue, komersyal na gusali, at iba pang mga scenario, ang silent-canopy diesel generator sets ay ginagamit bilang "core backup" para sa matatag na suplay ng kuryente. Ang kalidad ng on-site installation ay direktang nagpapasya sa operational efficiency, noise control performance, at serbisyo buhay ng unit; kahit ang maliit na pagkakamali ay maaaring magresulta sa potensyal na pagkakamali. Ngayon, batay sa aktwal na karanasan, inilalarawan namin ang kumpletong standardized procedures at critical details para sa on-site installation ng silent-canopy diesel generator sets upang suportahan ang efficient installation at commissioning.
1.Pag-prepare Bago ang Installation: Precise Planning, Solid Foundation
Ang maikling paghanda bago ang installation ay mahalaga upang maiwasan ang repaso sa huli. Dapat itong maisagawa nang komprehensibo mula sa tatlong aspeto: site, equipment, at tools.
Paggamit ng Site at Layout: Paboransin ang lugar na may mahusay na ventilation, flat terrain, at smooth drainage, malayo sa residential zones at precision equipment workshops na sensitibo sa tunog. I-maintain ang maintenance clearance na hindi bababa sa 1.5 metro. Ang lupa ay dapat sumuporta sa kabuuang bigat ng unit (kasama ang foundation). Inirerekomenda ang paggawa ng concrete foundation (kapal ≥15 cm, flatness tolerance ≤3 mm) at pre-embed anchor bolt holes upang minimizahan ang operational vibration.
Pagsusuri at Inventory Check ng Equipment: Pagkatapos ng unpacking, i-verify na ang lahat ng components—kabilang ang main generator set, silent canopy, control cabinet, fuel tank, at muffler—ay kompleto. Isusuri ang equipment para sa transport damage at ikumpirma ang integrity ng critical components (e.g., engine, generator, radiator). Siguraduhin na ang modelo ng unit, rated power, at iba pang specifications ay tugma sa design requirements, at i-check na ang lahat ng kasama na technical documents (manual, certificate of conformity, wiring diagrams) ay kompleto.
Pag-prepare ng Tool at Auxiliary Materials: Handa ang lifting equipment (forklift, crane—rated for the unit’s weight), spirit level, torque wrench, multimeter, insulation resistance tester, etc. Handa rin ang bolts, washers, sealant, cables, high-temperature-resistant materials para sa exhaust pipes, at iba pang auxiliary materials na sumasaklaw sa installation standards.

2. Core Installation Process: Standardized Operation, Attention to Detail
2.1 Unit Positioning and Fixing
Gumamit ng lifting equipment upang maingat na ilagay ang unit sa concrete foundation nang walang tilting o impact, siguraduhing ang pinto ng silent canopy ay nakaharap sa direksyon na convenient para sa operasyon at maintenance.
Gumamit ng spirit level upang i-check ang leveling ng unit (longitudinal at transverse deviation ≤0.5 mm/m). Fine-tune using shims upang masiguro ang even weight distribution.
I-insert ang anchor bolts at i-tighten sila sa torque na isinasagawa sa manual (typical 35–50 N·m). Keep exposed bolt lengths uniform at gamitin ang double nuts para sa anti-loosening upang maiwasan ang displacement dahil sa vibration during operation.
2.2 Piping Connections: Sealing + Compatibility, Eliminate Risks
Fuel Line Connection: Gumamit ng oil-resistant rubber hoses o seamless steel pipes. Route the piping nang straight kung posible with minimal bends, avoiding sharp kinks. Wrap thread seal tape o apply sealant sa joints, then conduct a pressure test (pressure ≥0.3 MPa, hold for 30 minutes with no leakage). Keep the distance between the fuel tank and unit ≤5 meters, at position the tank bottom higher than the fuel pump upang masiguro ang smooth fuel delivery.
Exhaust System Installation: Install flexible connectors sa exhaust pipe upang mabawasan ang transmission ng vibration. Seal joints with high-temperature gaskets. Route the exhaust away from flammable materials (minimum distance ≥50 cm). Outdoors, install a rain cap; for indoor discharge, use dedicated silencing ducts upang masiguro ang smooth exhaust flow at compliant noise levels.
Cooling System Commissioning: Check coolant level sa radiator at top up with the same type of antifreeze if low (do not use plain water to avoid scale buildup). Confirm the cooling fan rotates freely and the airflow path is unobstructed. Align the silent canopy’s air intake and exhaust vents with ambient ventilation openings upang masiguro ang effective heat dissipation.

2.3 Electrical Connections: Safety First, Accurate Wiring
Cable Wiring: Konektahin ang generator set sa control cabinet at load equipment ayon sa wiring diagram. Piliin ang cable cross-sections na tugma sa power rating ng unit (copper cable current density ≤2.5 A/mm²). Crimp terminals securely at insulate with electrical tape. Clearly distinguish phase lines (L1/L2/L3), neutral (N), and protective earth (PE)—never miswire. Grounding resistance must be ≤4 Ω.
Control Cabinet Commissioning: After connection, check for loose wiring inside the control cabinet and verify that fuse and circuit breaker ratings match specifications. Power on and test indicator lights and instrument displays on the control panel. Confirm voltage and frequency are within standard ranges (380 V ±5%, 50 Hz ±1%).
Protection Device Verification: Test overload protection, short-circuit protection, low oil pressure protection, and high coolant temperature protection upang masiguro ang accurate trigger thresholds at reliable operation, preventing equipment damage during abnormal conditions.
2.4 Silent Canopy Commissioning: Optimize Sealing and Noise Reduction
Isusuri ang sealing performance ng canopy—ensure door seals are intact at fill any gaps in the enclosure with sealant upang maiwasan ang noise leakage at water ingress.
Confirm internal cooling fans and exhaust channels operate normally upang maiwasan ang excessive internal temperature during operation (recommended internal temperature ≤60°C).
Sukatin ang ingay sa operasyon: sa 1 metro mula sa canopy, ang ingay ay dapat tugunan ang mga pangangailangan ng disenyo (karaniwang ≤75 dB(A)). Kung ang ingay ay lumampas sa limitasyon, suriin ang pag-install ng muffler at tingnan kung mayroong pagkalabas ng acoustic insulation; ayusin at i-optimize kung kinakailangan.

3. Pagtanggap pagkatapos ng Installasyon: Komprehensibong Pagsusulit, Siguraduhing Tugon
Pagsusulit sa Walang Load: I-start ang yunit at i-run ito nang walang load para sa 30-60 minuto. Obserbahan ang bilis ng engine at ang estabilidad ng output voltage/frequency ng generator. Suriin kung may anumang abnormal na pagbibigkas, ingay, pagdumi ng langis, tubig, o hangin. Gamitin ang infrared thermometer upang bantayan ang temperatura sa bearings, exhaust pipes, atbp., siguraduhing ito ay nasa ilalim ng rated limits.
Pagsusulit sa Load: Gradwal na tumaas ang load hanggang 50%, 80%, at 100% ng rated capacity, patakaran ang bawat level para sa 15-30 minuto. Bantayan ang output power, current, at estabilidad ng voltage, tiyakin ang tamang response ng mga device ng proteksyon, at kumpirmahin ang fuel consumption at exhaust emissions ay tugon sa mga pamantayan.
Dokumentasyon at Handover: Pagkatapos ng matagumpay na pagtanggap, isama ang mga rekord ng installasyon, data ng pagsusulit, at mga manual ng equipment sa isang buong dossier ng installasyon. Ihanda ang equipment sa user, magbigay ng pagsasanay sa mga araw-araw na proseso ng operasyon, mga babala sa kaligtasan, at basic na pag-maintain upang siguraduhing maayos ang paggamit sa hinaharap.
Mga Mahahalagang Pansin: Bawasan ang mga Riesgo, Palawakin ang Buhay ng Serbisyo
Ipaglaban ang prinsipyong "power-off operation" sa panahon ng installasyon. Kumpirmahin na ang yunit ay walang kuryente bago ang mga koneksyon ng kuryente upang maiwasan ang electric shock.
Huwag ilagay ang mga bagay-bagay, lalo na ang mga flammable o explosive materials, sa loob ng silent canopy. Panatilihin ang malinaw na ventilasyon.
Iwasan ang madalas na pag-start-stop sa panahon ng operasyon. Pagkatapos ng unang installasyon, palitan ang langis ng engine at oil filter pagkatapos ng unang run. Gumanap ng regular na pag-maintain ayon sa manual pagkatapos nito.
Para sa espesyal na kondisyon ng site (halimbawa, mataas na temperatura, mataas na humidity, ekstremong lamig), ipatupad ang mga pinagtutuonang protective measures (halimbawa, sunshade canopy, dehumidifier, thermal insulation).