Is é an oibriú stiúrtha SF6 RMUs ardsholadacha ríthábhachtach don slándú na gréasáin. Chun fadhbanna tréitheacha a réiteach atá le feiceáil le linn oibriú fada, agus bunaithe ar cleachtais tionscail agus spéicí teicneolaíochta, tá na réiteacháin córasacha seo molta:
I. Plean Forbartha Iomlán um Imtharraingt Gais
- Feiniméan & Riscoil:
- Imtharraingt SF6 gas laghaíonn neart dielectric (bogann an spás buille síos thar 30% nuair is lú é an bpá séasta ná 0.4MPa).
- Ionsaí arc decompositions (mar shampla, SF4, SOF2) cuireann tionchar ar shábháilteacht na foirne.
- Córas Cosanta Proactach:
|
Cúnamh
|
Caighdeán
|
Tréimhse / Modh
|
|
Laser Imaging Leak Detection
|
DL/T 1145
|
Census bliantúil + Seantais speisialta tar éis báistí
|
|
Dual-Channel Density Relay Monitoring
|
IEC 62271
|
Socruithe carúil réalaí (0.55MPa ag 20°C)
|
|
Complete Sealing Component Retrofit
|
GB/T 11023
|
Úsáid O-rings fluororubber + seals metal bellows
|
|
Emergency Response Drills
|
Q/GDW 1799.2
|
Drills tri-mhíonna (lena n-áirítear úsáid apparátas análaíochta páirtíochta dearfach)
|
II. Stratéis chun Meacnaischíochtaí Oibriúcháin a Díoladh
- Mechanisms Fadhb:
- Mechanism sticking/jamming (80% mar gheall ar hardú greasa).
- Micro-switch failure.
- Operation refusal/maloperation caused by secondary wiring oxidation.
- Plean Meastóireachta Deagh:
- Seirbhís Bliantúil: Comhthaobh dhá chuid cheannródaí: 1) Disassembly and refurbishment of the operating mechanism; 2) Coil resistance testing. These tasks enable timely assessment of the equipment's fundamental condition.
- Intelligent Monitoring: Focuses on in-depth analysis of operational status, specifically including: 1) Analysis of open/close coil current waveforms; 2) Assessment of the energy storage motor status. This achieves precise control over equipment operation.
- Preventive Testing: Utilizes specialized instruments to ensure test accuracy, employing mechanical characteristic testers and micro-ohm meters for contact resistance testing. This provides robust data support for safe and stable operation.
III. Cóiríocht agus Rialú Réidhteachta & Tóir
- Uchtálacha Cosanta Iomlán:
- Insulation Refurbishment:
- Apply moisture-proof RTV coating to epoxy barrel surfaces (withstands 40% higher voltage).
- Replace porcelain bushings with silicone rubber bushings (impact resistance strength increased by 3 times).
- Thermal Management Upgrade:
Heat Dissipation Power = 6.5×10⁻³×(T_cabinet - 25)³ // Optimization Measures:
- Install IP55 centrifugal fans at the cabinet top (ΔT reduced by 8℃).
- Silver plating treatment of copper busbars (contact resistance reduced by 35%).
- Embed heat pipe radiators into the contact assemblies.
IV. Construction of Intelligent Operation & Maintenance (O&M) System
|
Technology Module
|
Function Implementation
|
Benefit
|
|
UHF Partial Discharge (PD) Monitoring
|
Captures 300MHz-1.5GHz signals
|
Provides 3-month early warning for insulation defects
|
|
Pressure Cloud Map Analysis
|
Leakage prediction based on temperature compensation
|
Increases leak location efficiency by 70%+
|
|
Mechanical Life Assessment
|
Stress analysis based on cumulative switching operations
|
Achieves >90% mechanism failure prediction rate
|
Validation via Typical Case
After implementing this solution at a State Grid 220kV substation:
▶ Annual SF6 leakage rate dropped from 0.8% to 0.05%.
▶ Number of mechanical failures decreased by 82% (from 2021 to 2023).
▶ Peak temperature rise reduced from 75K to 48K (IEC 60298).
Key O&M Implementation Points
- Establish a full life-cycle equipment database (including spare parts life warnings).
- Promote live detection techniques to replace scheduled outage testing.