What is Steam Consumption in a Pipe?

Steam consumed and steam utilized at the point of application are not equal. Normally steam consumed or generated in a steam boiler is more than what is required for use at the point of application.


The difference in steam consumption and steam utilization is due to:


  • Steam condensation when it travels on its way to point of use mainly due to exposed surfaces.

  • Leakages (if any)

When steam condenses on the wall of an exposed/uninsulated steam pipe, it gives up its enthalpy of evaporation.

Proper utilization of steam helps in saving in the input cost of water and coal. Saving of each kg of steam is directly proportional to the saving of some percentage of water, coal and electricity.

Calculation of steam consumption in a pipe during the start-up operation and normal continuous operation is possible, and will be discussed in detail below.

Steam Consumption in Steam Mains

Steam consumption within the pipe system needs to be judiciously monitored and controlled. The rate of condensation of the steam in the steam piping network depends upon the type of load (i.e. warm-up load or running load).

The rate of condensation of steam needs to be taken into account for sizing the steam traps, and also in finalizing the boiler output.

What is Warm-Up Load ?

During the plant start-up after a long time or from cold, then the steam is required to heat the system uniformly to bring the system close to the normal working temperature of the system.

The ‘warm-up load’ is the steam load which is associated with the steam consumption during the start-up of the plant. This can be either from the cold shut down, or from start-up after a very long time.

The rate of condensation of steam during the warm-up period is maximum. The design of steam trap shall be based on this load.

A good practice is to warm-up the system very slowly for safety-reasons, pipes have the benefit of reduced thermal and mechanical stress. Thus results in the following benefits:

  • Eliminations of leaks

  • Lower-maintenance-costs

  • Longer life for the pipes

  • No water hammer.

What is Process Plant Running Load?

Process plant running load is the steam load which is related to the normal (full load) continuous load of the plant. The rate of condensation of steam during the full load running a load of the plant is minimum.




How to Warm-Up a System?

Uniform and slow system warm-up can be achieved by a small by-pass valve in parallel to the main line isolation valve.

The time required to warm up the pipe network decides the warm-up (bypass) valve size. This valve can be a manual or automatic type depending on the user/client.

It is always better to discourage the practice of using the main valve for warm-up instead of the bypass valve. Since the main valve is far bigger in size (designed for full flow requirement) and not appropriate to use for small flow during the warm-up period.

As shown in figure1 above, before the main valve/bypass valve separator is installed to ensure that steam passing through the valve should be dry to protect the valve wear and tear.

If we provide sufficient time for the warming-up, then it is possible to get the following benefits:

  • For minimizing the pipe stress

  • For operational safety

  • Reduce start-up loads on boiler

The steam flowrate required to bring a pipework system up to operating temperature is a function of:

  • Mass

  • Specific heat of the material

  • Temperature increase

  • Enthalpy of evaporation of steam or Enthalpy of saturated steam

  • Allowable time




Where:

  • ms: Mean rate of condensation of steam in kg/hr

  • W: Total weight of pipe plus flanges and fittings in kg

  • Ts: Steam temperature oC

  • Tamb: Ambient temperature

  • Cp: Specific heat of pipe material in kj/kgoC

  • hfg: Enthalpy of evaporation or saturated enthalpy at operating pressure in kj/kg

  • t: Time of warming-up in minutes

Note: Suppose if the warm-up/heating time of the system is increased to 12 minutes from 6 minutes, then the initial flow rate of the steam can easily be reduced to half. If the warm-up/heating time of the system is increased to say 24 minutes, then the initial steam flow rate for heating can be reduced further.

Method to calculate the warm-up condensing load for a period of 30 minutes in a steam system

Let:

  • The system consists of carbon steel pipe of size — 150 mm

  • Steam Pressure — 16 bar(g)

  • Steam temperature (Ts) — 201oC

  • Enthalpy of evaporation corresponding to above parameters hfg — 1933

  • Ambient air temperature (Tamb) — 20oC

  • Length of the pipe shall be — 120 m

  • Cp of steel is —- 0.49 kj/kgo C

  • Warming-up time in minutes (t) — 30

  • Total weight of pipe plus flanges and fittings in kg (W)

  • Pipe network consists of 10 pairs of PN-40 flanged joints and two isolation valves

Table 1: Typical weights of steel pipe, flanges and bolts, and isolating valves in kg.

Pipe size(mm)

Sch.40 pipe kg/m

Flange weight per pair

Isolating valve flanged PN40





PN40

ANSI150

ANSI300


150

28.2

28.0

26.0

32

88

To find W, find the mass of the various steam main items from Table 1

  • 150 mm steel main = 28.2 kg/m

  • 150 mm flanges to PN-40 = 28 kg per pair

  • 150 mm stop valve = 88 kg each





Rate of condensation generated during warm-up time is given by:





Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Hello,I'm Wdwiin. A decade of hands-on experience in electrical engineering, specializing in high-voltage systems, smart grids, and renewable energy technologies. Passionate about technical exchange and knowledge sharing, committed to interpreting industry trends with professional insights to empower peers. Connection creates value—let’s explore the boundless possibilities of the electrical world together!

What is the difference between a dielectric and an insulator?
What is the difference between a dielectric and an insulator?
Dielectrics and insulators are distinguished primarily by their applications. One of the main differences is that a dielectric can store electrical energy by becoming polarized in an electric field, whereas an insulator resists the flow of electrons to prevent current conduction. Other key differences between them are outlined in the comparison chart below.Definition of DielectricA dielectric material is a type of insulator that contains few or no free electrons. When subjected to an electric fi
08/30/2025
What losses occur during operation of the transformer? How to reduce losses?
What losses occur during operation of the transformer? How to reduce losses?
Transformers experience various types of losses during operation, primarily categorized into two main types: copper losses and iron losses.Copper LossesCopper losses, also known as I²R losses, are caused by the electrical resistance of the transformer windings—typically made of copper. As current flows through the windings, energy is dissipated in the form of heat. These losses are proportional to the square of the load current (I²R), meaning they increase significantly with high
Rockwell
08/29/2025
Cable Fault Detection, Testing, Location and Repair
Cable Fault Detection, Testing, Location and Repair
I. Methods for Cable Testing and Inspection:Insulation Resistance Test: Use an insulation resistance tester to measure the insulation resistance value of the cable. A high insulation resistance value indicates good insulation, while a low value may suggest insulation problems requiring further investigation.Voltage Withstand Test: Apply a high-voltage test using a high-voltage tester to verify whether the cable can withstand high voltage under its rated operating conditions. Under normal circums
08/29/2025
Cable Quality Inspection and Cable Detection & Testing
Cable Quality Inspection and Cable Detection & Testing
Power cable quality inspection and cable testing are conducted to ensure that the cable's quality and performance meet specified requirements, thereby guaranteeing the safe and stable operation of power systems. Below are some common contents of power cable quality inspection and cable testing:Visual Inspection: Check the cable surface for physical defects such as damage, deformation, or scratches to ensure the cable's exterior is intact.Dimensional Measurement: Measure dimensional parameters su
08/29/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!