Mga Item sa Pagsasauli at Pagmamanila para sa 10kV High-Voltage Switchgear

Edwiin
Larangan: Pansakto ng kuryente
China

I. Pagsasanay at Pagtingin Nang Regular

(1) Pagtingin sa Mata sa Switchgear Enclosure

  • Walang deformation o pisikal na pinsala sa enclosure.

  • Ang protective paint coating ay walang malubhang rust, peeling, o flaking.

  • Ang cabinet ay ligtas na nai-install, malinis ang ibabaw, at walang mga foreign objects.

  • Ang nameplates at identification labels ay maayos na nakalagay at hindi naglalaho.

(2) Pagsusuri ng Operating Parameters ng Switchgear

  • Ang instruments at meters ay nagpapakita ng normal na values (katulad ng typical operating data, walang malaking deviation at consistent sa estado ng equipment).

(3) Pagsusuri ng Temperature ng Mga Komponente, Electrical Connections, Wires, at Cables

  • Gumamit ng infrared thermometer para sukatin ang accessible na komponente, electrical joints, wires, at cables: operating temperature ≤ 60°C.

  • Walang kakaibang amoy sa loob ng cabinet.

(4) Pagsusuri ng Switch Positions, Indicator Lights, Meter Displays, at Selector Switch Positions

  • Tama ang open/closed position ng circuit breaker.

  • Walang alarm indications.

  • Ang lahat ng selector switches ay nasa tama na posisyon.

II. Taunang Na-schedule na Pagsasanay

(1) Pagsusuri, Paglilinis, at Paggawa ng Defect Correction sa Enclosure

  • Linisin gamit ang alcohol at malinis na cotton cloth upang siguraduhing walang dust accumulation o stains.

  • Suriin ang protective paint para sa malubhang rust o peeling; kung may natuklasan, gawin ang rust removal at repaint.

(2) Pagsusuri at Pagsasanay ng Cable Compartment

  • Ang cable entry seals ay buo.

  • Ang cable plug fixing screws ay hindi loose.

  • Ang cable identification tags at phase color markings ay naroroon at hindi nawawala o nalis.

  • Ang cable compartment ay dry, walang condensation; malinis at walang dust.

  • Linisin ang insulators gamit ang alcohol at malinis na cotton cloth upang siguraduhing walang dust o contamination.

  • Ang grounding conductor ay ligtas at walang looseness.

(3) Pagsusuri ng Grounding Switch

  • Manually operate the grounding switch through one full open-close cycle.

  • Ang operasyon ay dapat smooth, walang jamming.

  • Ang switch position ay dapat tumugma sa indicator sa front panel.

(4) Pagsusuri at Pagsasanay ng Circuit Breaker Compartment

  • Withdraw the main circuit breaker to the test position and use a trolley to pull it outside the compartment. Inspect the primary isolation contacts and connected copper busbars for signs of burning or arcing. If necessary, polish with sandpaper and clean with alcohol-soaked cloth.

  • Apply a uniform layer of conductive grease (0.5–1 mm thick) to the main circuit breaker’s isolation contacts.

  • Tighten all primary circuit bolts to specified torque values. After tightening, check that spring washers are flat. Mark anti-loosening lines on all tightened bolts.

  • Wipe all components inside the circuit breaker compartment with alcohol and clean cotton cloth to ensure no dust or contamination.

  • Reinsert the circuit breaker trolley into the compartment and move to the test position. Perform one manual close-open operation cycle. Verify smooth operation, correct mechanical position indication, breaker position indication, and spring charged/uncharged status.

  • After verification, move the breaker to the service position and perform power on/off operations as required.

(5) Pagsusuri at Pagsasanay ng Secondary Circuit Compartment

  • Suriin ang secondary wiring: ang mga koneksyon ay dapat tight at clear ang wire labels.

  • Siguraduhing malinis ang compartment: walang dust o foreign objects.

  • Kung kinakailangan, linisin at i-tighten ang secondary terminals.

III. Taunang Electrical Testing

(1) Main Circuit Insulation Resistance Test

  • Gumamit ng 2500 V megohmmeter.

  • Measured value > 50 MΩ.

(2) Power Frequency Withstand Voltage Test
(Test on main circuit: phase-to-ground, phase-to-phase, and across open contacts)

  • After major maintenance: apply test voltage as per standard.

  • During service: apply 80% of the standard test voltage.

(3) Insulation Test of Auxiliary and Control Circuits

  • Gumamit ng 500 V megohmmeter.

  • Measured value > 2 MΩ.

IV. Fault-Based Maintenance (When Required)

(1) Circuit Breaker Operating Position Alignment

  • Apply conductive grease or Vaseline to the inner ring of the moving contact.

  • Insert the trolley to the service position and then withdraw it.

  • Use a caliper to measure the effective engagement depth between moving and stationary contacts on the visible part: should be 15–25 mm.

(2) Circuit Breaker Repair or Replacement

  • Carry out in accordance with manufacturer’s specific technical specifications.

(3) Instrument and Meter Repair or Replacement

  • Carry out in accordance with manufacturer’s specific technical specifications.

Magbigay ng tip at hikayatin ang may-akda!

Inirerekomenda

Mga Aksidente sa Pangunahing Transformer at mga Isyu sa Pagsasanay ng Light Gas
1. Tala ng Aksidente (Marso 19, 2019)Noong ika-16:13 ng Marso 19, 2019, inulat ng monitoring background ang isang light gas action ng No. 3 main transformer. Ayon sa Code for Operation of Power Transformers (DL/T572-2010), sinaunang tiningnan ng mga tauhan ng operation and maintenance (O&M) ang kondisyon ng No. 3 main transformer sa lugar.Konfirmasyon sa lugar: Inulat ng WBH non-electrical protection panel ng No. 3 main transformer ang isang Phase B light gas action ng katawan ng transformer
02/05/2026
Mga Kamalian at Pamamaraan sa Paggamot ng Single-phase Grounding sa 10kV Distribution Lines
Mga Katangian at mga Device na Paggamit sa Pagkakakilanlan ng Single-Phase Ground Fault1. Mga Katangian ng Single-Phase Ground FaultMga Signal ng Sentral na Alarm:Tumutunog ang bell ng babala, at nag-iilaw ang indicator lamp na may label na “Ground Fault sa [X] kV Bus Section [Y].” Sa mga sistema na may Petersen coil (arc suppression coil) na nakakonekta sa neutral point, nag-iilaw din ang indicator na “Petersen Coil Operated.”Mga Indikasyon ng Insulation Monitoring Voltmeter:Bumababa ang voltag
01/30/2026
Pamamaraan ng pag-ground ng neutral point para sa 110kV~220kV power grid transformers
Ang pagkakasunod-sunod ng mga paraan ng pag-ground ng neutral point sa mga transformer ng power grid na 110kV~220kV ay dapat tugunan ang mga pangangailangan ng insulation withstand ng mga neutral points ng mga transformer, at kailangang ito ring panatilihin ang zero-sequence impedance ng mga substation na hindi masyadong nagbabago, habang sinisigurado na ang zero-sequence comprehensive impedance sa anumang short-circuit point sa sistema ay hindi liliit ng tatlong beses ang positive-sequence comp
01/29/2026
Bakit Gumagamit ng Bato Gravel Pebbles at Crushed Rock ang mga Substation?
Bakit Gumagamit ng Bato, Gravel, Pebbles, at Crushed Rock ang mga Substation?Sa mga substation, ang mga kagamitan tulad ng power at distribution transformers, transmission lines, voltage transformers, current transformers, at disconnect switches ay nangangailangan ng pag-ground. Sa labas ng pag-ground, susuriin natin nang mas malalim kung bakit karaniwang ginagamit ang gravel at crushed stone sa mga substation. Bagama't tila ordinaryo lang sila, ang mga bato na ito ay gumaganap ng mahalagang pap
01/29/2026
Inquiry
+86
I-click para i-upload ang file
I-download
Kumuha ng IEE-Business Application
Gamit ang app na IEE-Business upang makahanap ng kagamitan makuha ang mga solusyon makipag-ugnayan sa mga eksperto at sumama sa industriyal na pakikipagtulungan kahit kailan at saanman buong pagsuporta sa pag-unlad ng iyong mga proyekto at negosyo sa enerhiya