• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Ogġetti ta' Manutenzjoni u Riparazzjoni għal Switchgear Elektriku 10kV

Edwiin
Edwiin
Camp: Interruttore tal-elettricità
China

I. Manutenzjoni u Verifika Ruttin

(1) Verifika Vizwali tal-Enclosure tal-Switchgear

  • L-enclosure ma jkunx deformata jew imċassra fiżiċament.

  • Il-livwa protettiva tajjeb l-enclosure ma tkunx serjat, mqassma, jew flakka.

  • Il-kabinet hu installat b'sigurtà, ċar tas-silġ, u bla objetti esterni.

  • It-tiftix u l-etiketti ta' identifikazzjoni huma affiċċati nettament u ma jkunu qatt mhux qed jiġu skidati.

(2) Verifika tal-Parametri Operativi tal-Switchgear

  • Il-instrumenti u l-meters jimmutaw valuri normali (komparabili mal-data operattiva tipika, mingħajr devjazzjonijiet signifikanti u konsistenti mal-status tal-equipament).

(3) Verifika tal-Temperatura tal-Komponents, tal-Konnessjonijiet Elettriki, tal-Filji, u tal-Kabli

  • Uża termometru infraruđu biex timmeta l-komponents accessibbli, l-konnessjonijiet elettriki, l-filji, u l-kabli: temperatura operattiva ≤ 60°C.

  • Ma jkunx xejn odor strambi fil-kabinet.

(4) Verifika tal-Posizzjonijiet tal-Switches, tal-Lumijiet Indikaturi, tal-Displays tal-Meters, u tal-Posizzjonijiet tal-Selector Switches

  • Il-posizzjoni tal-circuit breaker aperta/chiusa hija korretta.

  • Ma jkunx indikazzjonijiet tal-allarmi.

  • Kull selector switch hu f'posizzjoni korretta.

II. Manutenzjoni Annwali Programmata

(1) Verifika, Tlettjar, u Korezzjoni tal-Defetti tal-Enclosure

  • Ħassar bl-alcool u tiftixa tazza tal-qattus biex tassigura li m'hemmx akkumu mulħ tal-dust jew tiftix.

  • Verifika l-livwa protettiva għal rust jew mqassma; jekk infetaħet, esegui l-eliminazzjoni tal-rust u ripintja.

(2) Verifika u Manutenzjoni tal-Compartment tal-Kabli

  • Il-segell tal-ingress tal-kabli hu sliem.

  • Is-silġ tal-plug tal-kabli ma jkunux stqarrijiet.

  • It-tiftix tal-identifikazzjoni tal-kabli u l-markar tal-kulur tal-fasi huma preżenti u ma jkunu qatt mhux misfi hemm jew skidati.

  • Il-compartment tal-kabli hu ħal, mingħajr kondensazzjoni; tlettjar u senza dust.

  • Ħassar l-insulators bl-alcool u tiftixa tazza tal-qattus biex tassigura li m'hemmx dust jew kontamini.

  • Il-konduċtur tal-grounding hu fissat b'sigurtà mingħajr stqarr.

(3) Verifika tal-Grounding Switch

  • Opera manwalment il-grounding switch permezz ta' siklu waħid kummerċjali.

  • L-operazzjoni għandha tkun smooth, mingħajr jamming.

  • Il-posizzjoni tal-switch għandha tkun konformi mal-indikatur fuq il-panel frontali.

(4) Verifika u Manutenzjoni tal-Circuit Breaker Compartment

  • Withdraw il-main circuit breaker għal posizzjoni test u uża karrettin biex tuċċa barra mill-compartment. Verifika l-isolators primarji u l-konnessjonijiet tal-busbars tal-kuwwinta għall-segni ta' burning jew arcing. Jekk necessari, poliš permezz ta' sandpaper u tlettjar bl-alcool-soaked cloth.

  • Apply layer uniformi ta' conductive grease (0.5–1 mm thick) għal l-isolators tal-main circuit breaker.

  • Stringi kull bolt primarju għal valuri ta' torque speċifikati. Wara stringi, verifika li l-washers spring huma flat. Mark anti-loosening lines fuq kull bolt stringut.

  • Ħassar kull komponenti fit-compartment tal-circuit breaker bl-alcool u tiftixa tazza tal-qattus biex tassigura li m'hemmx dust jew kontamini.

  • Reinsert il-circuit breaker karrettin fit-compartment u move għal posizzjoni test. Perform one manual close-open operation cycle. Verify smooth operation, correct mechanical position indication, breaker position indication, and spring charged/uncharged status.

  • Waraq verifikazzjoni, move il-breaker għal posizzjoni service u perform power on/off operations as required.

(5) Verifika u Manutenzjoni tal-Secondary Circuit Compartment

  • Verifika l-secondary wiring: il-konnessjonijiet għandhom ikunu stringuti u l-labels tal-filji klarji.

  • Assigura li l-compartment hu tlettjar: mingħajr dust jew objetti esterni.

  • Jekk necessari, tlettjar u re-stringi l-secondary terminals.

III. Prova Elettrika Annwali

(1) Prova tal-Resistance tal-Insulation tal-Circuit Primarju

  • Uża 2500 V megohmmeter.

  • Valur misuratu > 50 MΩ.

(2) Prova tal-Voltage tal-Withstand tal-Frequenza tal-Kurrent
(Test fuq il-circuit primarju: phase-to-ground, phase-to-phase, u across open contacts)

  • Waraq major maintenance: apply test voltage as per standard.

  • During service: apply 80% of the standard test voltage.

(3) Insulation Test of Auxiliary and Control Circuits

  • Use a 500 V megohmmeter.

  • Measured value > 2 MΩ.

IV. Manutenzjoni bażita fuq l-Erroġi (Meta Neceżessarju)

(1) Aligning the Circuit Breaker Operating Position

  • Apply conductive grease or Vaseline to the inner ring of the moving contact.

  • Insert the trolley to the service position and then withdraw it.

  • Use a caliper to measure the effective engagement depth between moving and stationary contacts on the visible part: should be 15–25 mm.

(2) Repair or Replacement of the Circuit Breaker

  • Carry out in accordance with manufacturer’s specific technical specifications.

(3) Repair or Replacement of Instruments and Meters

  • Carry out in accordance with manufacturer’s specific technical specifications.

Agħti tipp u inkoraġixxi l-awtur!
Mħalless
Għalaq Tisfil Trasformatur Solidu?
Għalaq Tisfil Trasformatur Solidu?
Il-trasformatur solid-state (SST), anki ma konosci bħala Electronic Power Transformer (EPT), huwa apparaċċ elettriku statiku li jikkombini t-teknika tal-konverżjoni elettronika tal-enerġija mal-konverżjoni ta' enerġija tal-frekwenza magħża u mhux għal-bażi ta' induzzjoni elettromagnetika, li jippermetti l-konverżjoni tal-enerġija elettrika minn waħda setta ta' karatteristiċi tal-enerġija għal oħra.Fil-mqyas ma' trasformaturi konvenzjonali, l-EPT joffri n-numru kbir ta' avvantaggi, meta r-reat tr
Echo
10/27/2025
Għal li jagħmlu l-Transformer Solid-State? Guida Kompleta
Għal li jagħmlu l-Transformer Solid-State? Guida Kompleta
Il-transformaturi solid-state (SST) joffru effiċjenza għoli, affidabilità, u fleksibilità, li jiġu renduti addattati għal varjetà ta' applikazzjonijiet: Sistemi tal-Elettroenerġija: Fl-aġġornament u rimpiazzu tal-transformaturi tradizzjonali, l-il-transformaturi solid-state jmuraw is-siguri potenzjali u prospetti tal-merkat konsiderevoli. L-SST jippermettu konverżjoni, kontrollo u manġament tal-elettroenerġija b’mod effiċjenti u stabili, li jagħti ssoccorso biex is-sistemi tal-elettroenerġija tk
Echo
10/27/2025
Għal liex Iċ-Ċavett Miftuħ: Kwalit Overload Short Circuit u Rilġil Causes
Għal liex Iċ-Ċavett Miftuħ: Kwalit Overload Short Circuit u Rilġil Causes
Kawżuni Komuni ta’ l-FusIr-raġunijiet komuni għal fus jilġu jinkludu varjazzjonijiet fil-voltiġġ, ċikli qisra, xita tal-fulmin meta jiġi tiftix, u sovraccarichi tad-daqqa. Dawn il-kondizzjonijiet jistgħu jġibu s-silġ tas-silġ tal-fus.Il-fus huwa apparaċċ elettriku li jinterrompi l-ċiklu milla jilġu tas-silġ tal-element fusibbili minħabba l-ħalq prodotta meta l-daqqa toverpassa valur speċifikat. Jopera fuq il-prinċipju li, wara li s-suverankarriġa tkun persistenti għal perjodu żgħir, l-ħalq prodo
Echo
10/24/2025
Ħilġ tal-Fużi u Sostituzzjoni: Sigurtà u Pratiki Aħjar
Ħilġ tal-Fużi u Sostituzzjoni: Sigurtà u Pratiki Aħjar
1. Manutenċija tal-fjużiIl-fjużi f'operazzjoni għandhom jiġu esaminati regolarment. L-esame inkluġi l-oggetti segwenti: Il-kurrent tal-carica għandu jkun kompatibbli mal-kurrent indikat tal-fjuż. Għal fjużi mhux magħmula b'indikatur tal-fjuż mur, tixtri lil hawn jekk l-indikatur intaġġa. Ikkontrolla l-konduktör, l-punti ta' konnessjoni, u stess il-fjuż għal eccess ta' ħilgħ; assicurajtkom li l-konnessjonijiet huma ċerti u qed jagħmlu kontatt b'sidir. Ikkontrolla l-exterior tal-fjuż għal krazji,
James
10/24/2025
Ċalja tal-inquery
Downloadu
Ikseb l-App IEE Business
Uża l-app IEE-Business biex tiftakar imkienjar taħt il-mod ġdid waqt li tkun qiegħed tixtieq soluzzjonijiet tikkonektja ma' esperti u tkun parti min kollobazzjoni f'sektor kwalunkwe ħin u fejn siekta s-sodisfaċċament tas-silġ tal-proġetti tiegħek u t-affarijiet tiegħek fl-enerġija