Discussion on Construction Techniques for the 20 kV Power Supply System in High-Speed Railways
1. Project OverviewThis project involves the construction of the new Jakarta–Bandung High-Speed Railway, with a mainline length of 142.3 km, including 76.79 km of bridges (54.5%), 16.47 km of tunnels (11.69%), and 47.64 km of embankments (33.81%). Four stations—Halim, Karawang, Padalarang, and Tegal Luar—have been constructed. The Jakarta–Bandung HSR mainline is 142.3 km long, designed for a maximum speed of 350 km/h, with a double-track spacing of 4.6 m, including approximately 83.6 km of balla