Ⅰ. Pangunahing Layunin
Pataasin ang efisiensiya ng paggawa ng kuryente, tiyakin ang reliabilidad ng suplay ng kuryente, bawasan ang buong siklo ng operasyon na mga gastos, at makamit ang intelligent na regulasyon ng sistema ng kuryente.
Ⅱ. Mga Solusyon para sa Pagsasama-sama ng Core Subsystem
Dedicated Solution for Power Transformers
Analisis ng Sakit: Ang mga transformer ay nagsisilbing mahalagang hub para sa transmisyong elektriko, na nagbabawas ng 3%~5% ng kabuuang nawawalang enerhiya ng planta. Ang downtime na dulot ng pagkakasira ay nagdudulot ng kompletong brownout ng planta.
1. Transformer Selection & Technological Innovation
|
Direction ng Pagsasama-sama |
Stratehiyang Pagpapatupad |
Teknikal na Benepisyo |
|
Ultra-Efficient Transformers |
Mag-adopt ng SCRBH15-class o mas mataas na amorphous alloy transformers o Grade-1 energy-efficient oil-immersed transformers |
40%~70% na pagbawas sa no-load loss, nagbabawas ng 100,000 kWh/year per unit |
|
Impedance Optimization Design |
I-customize ang impedance values batay sa short-circuit current (±2% accuracy) |
Nagpapababa ng impact ng short-circuit, nagpapataas ng seguridad ng kagamitan |
|
Intelligent Cooling System |
I-integrate ang VFD fans + oil pumps na may coordinated control |
50% na pagbawas sa power sa <60% load, noise ≤65dB |
2. Key Performance Enhancement Path
graph LR
A[Electromagnetic Optimization] --> B[Stepped Lap Core]
A --> C[Epoxy Resin Vacuum Casting]
B --> D[15% Eddy Current Loss Reduction]
C --> E[Partial Discharge <5pC]
E --> F[Lifespan Extended to 40 Years]
3. Digital O&M System
Ⅲ. System-Level Collaborative Optimization
Transformer-Subsystem Integration
|
Collaborative Module |
Optimization Measure |
Comprehensive Benefit |
|
Generators |
18-pulse rectifier transformer configuration |
THD reduced from 8% → 2% |
|
Switchgear |
Transformer-GIS protection coordination time ≤15ms |
Fault clearance speed ×3 faster |
|
Load Management |
±10% dynamic voltage regulation (OLTC) |
Voltage compliance rate ≥99.99% |
Ⅳ. Quantified Implementation Benefits
|
Metric |
Pre-Optimization |
Post-Optimization |
Improvement |
|
Comprehensive Efficiency |
95.2% |
98.1% |
↑ 3.04% |
|
Unplanned Outages |
2.3 times/year |
0.2 times/year |
↓ 91.3% |
|
Coal Consumption per kWh |
285g/kWh |
263g/kWh |
↓ 7.7% |
|
O&M Cost |
18 USD/kVA/year |
9.5 USD/kVA/year |
↓ 47.2% |
Note: Standard coal equivalent
Ⅴ. Key Technical Safeguards