بەشداری ئەو خراپییانەی پێکهاتە ڕەنگی بەستەرەکان بە پێی چەندین شێواز هەڵبژێرە

Felix Spark
Felix Spark
qalab: Daxwaza û Baxta
China

Pêşnûna Vê Rewşê

Di dema komîsyonkirina AC de ya yek substationê, çarşeyek şimendanên post insulator da pêşkeft. Rewşa xeta teqdimkirin diha:
Heke qapik 500 kV ya AC switchyard bi serbexiya busbarê bikriye, têne û hêviya dual - set busbar differential protection ya busbar ê amade kirin, û qapik çalak kir. Fasey xetayek fase B bo, û deravê xetayek 5,760 A bo. Analîz gas composition ya SF₆ gas da li ser gas chamber dibe, û SO₂ content 5.3 μL/L (standart 2 μL/L) bo.

Sazkirina Post Insulator

Gas chamber pirsa trê post insulators, particle traps, pull plates, jî binihêre. Wêgotin Figure 1, di dema montajê de, trê post insulators û particle traps bi bolts da ser metal pull plate fix kirin. Shielding cover bi bolts da ser metal insert di navbera insulator de saz kirin. Insert bi casting da li ser insulator bond kirin. Di dema montajê de, bi bolts da pull plate ser pipe busbar flange fix kirin. Malper material ya insulator epoxy resin bo, particle trap alloy material bo, û limit pad insulating material bo.

Malper farsa post insulator da ku malper conductor internal da support bikin û ji bervek isolating gas chamber nebe. Heke cihaz normal bikar bînin, post insulator di deravê gas constant da evenly stressed bikin, wêgotin Figure 2. Dilêrin, electric field distribution ya trê post insulator extremely uneven bo. Electric field strength di interface di navbera metal insert û epoxy resin de relatively high bo. Ev uneven distribution divê local charge accumulation relatively serious li ser trê post insulator bike. Heke foreign objects û serekî vêstîn, flashover discharge pêşkeft bibe.

Re - measurement Appearance Dimensions

Post insulator faulty li factory re - measurement dimensions û appearance inspection bika. Faulty busbar post insulators slightly wiped û marks polished bikan. Surface ya post insulator intact bo, û no visible cracks, bubbles, û other anomalies dibin.

Bi reference drawings, multiple key dimensions ya post insulator, particle traps, shielding covers, pull plates, jî re - measured bikan. Ev li ser re - measuring multiple dimensions center - to - center distance ya trê legs ya post insulator, circumferential diameter, û angle bêtir. Hemû dimensions qualified dibin.

Dye Penetrant Inspection

Dye penetrant inspection li ser post insulator bika. Di dema cleaning û grinding de, inspection bika. Cleaning agent spray bi ser paper, û then penetrant surface ya insulator clean bika. Li dema careful inspection, no penetrant seepage detected, û no anomalies dye penetrant inspection dibin.

X - ray and Industrial CT Inspection

X - ray inspection li ser post insulator bika. Post insulator rotated 360° li ser inspection, û no defects such as poor bonding, bubbles, û cracks dibin.
Industrial CT inspection tests li ser post insulator bikan. Internal insulation material generally uniform bo, û no air holes, cracks, impurities, û other defects dibin. No poor bonding between low - voltage end insert û epoxy resin, neither central cylinder û epoxy resin.

Mechanical Performance Test

Mechanical performance tests li ser post insulator bikan, including pressure test (12 kN, holding pressure for 30 min) û torsion test (15 kN, holding pressure for 30 min). Surface ya post insulator observed for any anomalies, cracks, û damage. No anomalies found through mechanical performance test.

Insulation Performance Test

Post insulators assembled into busbar test state with new particle traps û old particle traps (after grinding) returned from site respectively, û filled with 0.5 MPa SF₆ gas inside.
First, assessment carried out according in - factory withstand voltage test method: power - frequency withstand voltage (740 kV for 1 min - 381 kV for 5 min), û lightning impulse (±1675 kV, 3 times each); then, assessment carried out according on - site withstand voltage test method: power - frequency withstand voltage (318 kV for 5 min - 550 kV for 3 min - 740 kV for 1 min - 381 kV for 45 min). All test results normal, û no discharge or abnormal conditions.

Fault Reproduction Test

Based on above analysis post insulator, determined no fault problems found in design û manufacturing stages post insulator. Preliminarily judged foreign objects surface post insulator during installation stage might caused flashover discharge. To further confirm cause accident analyzed, considering possible hiding places foreign objects û situation non - application lubricating grease, reproduction tests under various working conditions carried out, including: applying 1/3 lubricating grease post insulator (no discharge), applying 1/2 lubricating grease post insulator (no discharge), applying 2/3 lubricating grease post insulator (no discharge), applying 1/3 lubricating grease post insulator û blowing dust (dust onto post insulator, no discharge), etc.

Based on reproduction test results under above - mentioned working conditions, can concluded single - source lubricating grease contamination û metallic foreign objects not likely cause surface flashover breakdown insulator; for insulators break down under power - frequency voltage, both central insert û ground - potential insert have obvious ablation marks; for insulators break down under lightning impulse voltage, central insert has ablation marks, similar phenomenon on - site fault.

 

Bexşişek bidin û nuşkarê wê bikevin!​
Pêşniyariyek
10kV RMU Common Faults & Solutions Guide

بەخێربێی ڕاهێنانی کۆمەڵایەتی و شاراوەکانی 10kV RMU
10kV RMU Common Faults & Solutions Guide بەخێربێی ڕاهێنانی کۆمەڵایەتی و شاراوەکانی 10kV RMU
Çavdarên Serîkariyê û Çareserkavanên Vebijarkên Unitên Serîkarî yên 10kV (RMUs)Unita serîkarî ya 10kV (RMU) yekînîsînî ya bêhirsanîn ên cihazan daxuyaniya elektrikî û da dest pê hatîne di şebêkan xwe-dixwaza de, ku bi sereke ji bo darbendkerdina wanê û daxuyaniyê ya nîvîna guherand. Di dema xebitandina rast de, çend çavdar dê bidin. Ji bilind û berî heye çavdarên herêmî û çareserkevanên taybet.I. Çavdarên Elektrîk Kurterkirina Naverok û Rewirgirtina BêdarKurterkirina naverok an rewirgirtina bêda
Echo
10/20/2025
Bistîna Lajanê ya Bilind & Gotina Xebata
Bistîna Lajanê ya Bilind & Gotina Xebata
Bikarên Şevdarîya Daşkê: Rûbarkirina û Têkiliyekkirina XebelBikarên şevdarîya daşkê yên parastinên ên dereng an di cihazên şevda de ne. Wan çab bikin da ku hêzdan bi serkeftin bigihên wan re were kesandin, tuza xebelên ji bo dawiyên yek bêtir in ya ji bo dawiyên kurtan. Lakin, di dema berdestina werkerdina wan de û ji bo astên din, dikarin ku bikarên şevdarîya daşkê xebel pêwend bixin ku hewceyên têkiliyekkirina û rêzikirina weha bibin.I. Rûbarkirina Bikarên Şevdarîya Daşkê1. Ber Hemîna Dibistin
Felix Spark
10/20/2025
10 Pêşkêşkirinên Serbestbûnî ji bo Nisandin û Vekeşandin Transformer!
10 Pêşkêşkirinên Serbestbûnî ji bo Nisandin û Vekeşandin Transformer!
10 Serbixanên Ji Bo Destpêk û Karkeşanîya Transformer! Transformer ne bixebit derbas—ne bixebit da li ser çiyayên derbas an divar. Derbas ne girîng nînivîsên berdest bikin û herzandina línan zêdetir bike, amma ku kirûbar û karanîna werazerkirin de girîng e. Ne hilbijêre hêza transformerê bi tevahî—hilbijêrana hêza rast pirzihkir. Heke hêza pîk be, transformerê dikare bi nirxekirina sereke ve bigire û lê zêde bigire—herzandina ji 30% ya tijî ne dibînin du saet. Heke hêza mezin be, vê dihêjin û nî
James
10/20/2025
چۆن دەتوانیت ترانسفورماتورە گڕیکەکان بە ئامانی پارهێزی بدەیت؟
چۆن دەتوانیت ترانسفورماتورە گڕیکەکان بە ئامانی پارهێزی بدەیت؟
Pêşkêşkirina Dastûrên Bîstûnê yên Ji bo Tranformatorên Paşîn Tranformatora peyvên biguheze, çalak bikin. Kesana lagehê ya viran û tevahî ya tranformatora ji bo bîstûnê biguheze, füzyonê ya nîrvana kontrol bigere, û îmâna "BI ÇALAK NIKIN" li ser pîçeyka kesanê veqetandin. Kesana lagehê ya berî ya tranformatora ji bo bîstûnê biguheze, kesana zemînê vebike, tranformatora tamamîn bişînin, qapîka lageha berî bike, û îmâna "BI ÇALAK NIKIN" li ser pîçeyka kesanê veqetandin. Ji bo bîstûnê ya tranformato