Transformer Fuse Blown | Step-by-Step Fault Diagnosis Guide

Felix Spark
Felix Spark
Field: Failure and maintenance
China

If the fuse element on the high-voltage side of the transformer blows or the circuit trips, the first step is to determine whether one phase, two phases, or all three phases are interrupted. This can be determined according to the fault symptoms as shown in the following table:

When a fuse element blows, first check whether the high-voltage side fuse or the lightning arrester gap has short-circuited to ground. If no abnormalities are found during external inspection, it can be concluded that an internal fault has occurred in the transformer. Carefully inspect the transformer for signs of smoke, oil leakage, or abnormal temperature.

Then, use a megohmmeter to test the insulation resistance between the high-voltage and low-voltage windings, as well as the insulation resistance of both the high-voltage and low-voltage windings to ground. Sometimes, an interlayer or turn-to-turn short circuit within the transformer windings can also cause the high-voltage side fuse to blow. If no defects are found when testing the turn-to-turn insulation resistance with a megohmmeter, use a bridge to measure the DC resistance of the windings for further diagnosis. After a comprehensive inspection, identify and rectify the fault, replace the fuse element with one of the same original specifications, and the transformer may then be returned to service.

Give a tip and encourage the author!
Recommended
Hydraulic Leak & SF6 Gas Leakage in Circuit Breakers
Hydraulic Leak & SF6 Gas Leakage in Circuit Breakers
Leakage in Hydraulic Operating MechanismsFor hydraulic mechanisms, leakage can cause short-term frequent pump starting or excessively long re-pressurization time. Severe internal oil seepage in valves may lead to pressure loss failure. If hydraulic oil enters the nitrogen side of the accumulator cylinder, it can cause abnormal pressure rise, which affects the safe operation of SF6 circuit breakers.Apart from failures caused by damaged or abnormal pressure detection devices and pressure component
Felix Spark
10/25/2025
10kV RMU Common Faults & Solutions Guide
10kV RMU Common Faults & Solutions Guide
1.Application Issues and Handling Measures for 10kV Ring Main Units (RMUs)The 10kV ring main unit (RMU) is a core power distribution device in urban 10kV distribution networks, widely used in industrial parks, residential communities, commercial centers, and public facilities for medium-voltage power supply and flexible power distribution. Its primary function is to enable flexible energy distribution, ring-fed operation, and fault isolation at the 10kV voltage level. However, during long-term o
Echo
10/20/2025
HV Breaker Fault Basics: Training Guide for New Engineers
HV Breaker Fault Basics: Training Guide for New Engineers
High-Voltage Circuit Breakers: Classification and Fault DiagnosisHigh-voltage circuit breakers are critical protective devices in power systems. They rapidly interrupt current when a fault occurs, preventing damage to equipment from overloads or short circuits. However, due to long-term operation and other factors, circuit breakers may develop faults that require timely diagnosis and troubleshooting.I. Classification of High-Voltage Circuit Breakers1. By Installation Location: Indoor-type: Insta
Felix Spark
10/20/2025
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation! Never install the transformer too far away—avoid placing it in remote mountains or wilderness. Excessive distance not only wastes cables and increases line losses, but also makes management and maintenance difficult. Never choose transformer capacity arbitrarily. Selecting the right capacity is essential. If the capacity is too small, the transformer may be overloaded and easily damaged—overloading beyond 30% should not exceed two hours
James
10/20/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.