• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Digital Timer Switch THC 15B-2C Astronomical Timer

  • Digital Timer Switch THC 15B-2C Astronomical Timer
  • Digital Timer Switch THC 15B-2C Astronomical Timer
  • Digital Timer Switch THC 15B-2C Astronomical Timer
  • Digital Timer Switch THC 15B-2C Astronomical Timer

Key attributes

Brand Switchgear parts
Model NO. Digital Timer Switch THC 15B-2C Astronomical Timer
Rated voltage AC220V
Rated normal current 16A
Rated frequency 50/60Hz
Series THC-15B

Product descriptions from the supplier

Description

The THC-15B/20G/30B series timer adopts an intelligent loop design and is a precise and sensitive latitude and longitude timer with high precision, strong anti-interference, and stable operation. The THC-15B/20G/30B series latitude and longitude timers are commonly used as streetlights, light boxes, neon lights, production equipment, agricultural breeding, warehouse ventilation and dehumidification, automatic preheating, broadcasting and television equipment and other facility equipment. It is a cost-effective digital timer.

THC-15B/20G/30B series latitude and longitude timer product features:
1. Adopting intelligent loop design, it can accurately schedule and maintain stable product operation.
2. Adopting industrial grade chip design makes the product more precise and sensitive, and improves its anti-interference performance.
3. LED display screen makes the setting parameters clear at a glance and the status more intuitive and clear.
4. Built in lithium battery, it will continue to operate and display after power failure.
5. Equipped with a 40 year calendar (2009-2050), it accurately implements latitude and longitude timing switches.
6. Installed using 35mm guide rails.
Application scenarios of THC-15B/20G/30B series latitude and longitude timers:
The control objects can be ideal control products such as street lamps, light boxes, neon lights, production equipment, agricultural breeding, warehouse ventilation and dehumidification, automatic preheating, broadcasting and television equipment, etc.

ItemNo

THC15B-2C 16A, THC15B-2C 20A,THC15B-2C 25A,THC15B-2A 30A

Voltage range

AC 220-240V 50Hz/60Hz(Other special voltages can be customized)

Timing error

AC 180-250V

Switching frequency

≤1s/d (25℃)

Power consumption

8ON+8OFF

Display

4VA (max)

Electrical life

LCD

Mechanical life

10⁵times (Rated load)

Min. switching time

1min

Contact

2NO+2NC/ 2NC

Control current

16A,20A,25A,30A

Mounting

DIN rail mounting

Contact Capacity

THC15B-2C 16A Resistive: 16A/250V AC(cosφ =1THC15B-2C 20A Resistive: 20A/250V AC(cosφ =1)THC15B-2C 25A Resistive: 25A/250V AC(cosφ =1)THC15B-2A 30A Resistive: 30A/250V AC(cosφ =1)

QTY

100PCS

G.W

19KG

N.W

18.5KG

MEAS

460x320x290mm

Temperature

-10~40℃

Relative humidity

35~85%RH

Documentation Resource Library
Restricted
Digital Timer Switch THC 15B-2C Astronomical Timer Catalogue
Catalogue
English
Consulting
Consulting
FAQ
Q: What are the core functions and advantages of the THC 15B-2C?
A:

The core functions and advantages focus on four dimensions: astronomical adaptation, dual-channel control, flexible programming, and stable reliability:

·Precise astronomical timing adaptation: After entering the latitude and longitude of the device installation location, it automatically calculates daily sunrise and sunset times, and intelligently adjusts switch times with sunlight changes in four seasons without frequent manual modifications.

·Dual-channel independent control: 2 groups of changeover contacts can control two different loads simultaneously (such as street lights + landscape lights), with independent programming without mutual interference, improving control efficiency.

· Multi-mode programming compatibility: Supports 44 groups of custom on/off programs, which can be superimposed with astronomical timing mode (such as turning off lights 30 minutes after sunrise and turning on lights 15 minutes before sunset) to meet complex scenario needs.

· High-reliability design: Equipped with a long-life lithium battery, retaining programs and time memory for ≥3 years after power outage; industrial-grade anti-interference capability, with an operating temperature range of -10℃~+50℃, adapting to outdoor power distribution environments.

·Convenient operation experience: The LCD display clearly shows latitude and longitude, sunrise and sunset times, and program status; key operation is simple, supporting 12/24-hour format switching and automatic daylight saving time adjustment.

Q: What is the THC 15B-2C Astronomical Timer Switch?
A:

The THC 15B-2C is a dual-channel astronomical timer switch specially designed for sunrise-sunset adaptive control, compatible with AC 220V-240V voltage and 50/60Hz frequency, with mainstream rated current specifications of 16A/20A/25A/30A (resistive load). Its core function automatically calculates sunrise and sunset times based on latitude and longitude, supporting four-season time adaptive adjustment. It also integrates 44 groups of programmable on/off programs, automatic daylight saving time switching, and power failure memory (built-in lithium battery life ≥3 years). Adopting 35mm standard DIN rail installation, it has a compact size of 86×36×66mm and an accuracy of ≤1 second/day, widely used in municipal street lights, landscape lighting, agricultural greenhouses and other scenarios requiring automatic control following natural light.

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 1000m² Total staff: Highest Annual Export(usD): 300000000
Workplace: 1000m²
Total staff:
Highest Annual Export(usD): 300000000
Services
Business Type: Sales
Main Categories: Low Voltage Electrical Apparatus/Instrument meters/Production equipment/Tester/High Voltage Electrical Apparatus/Electrical fittings/Equipment Parts
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Main Transformer Accidents and Light Gas Operation Issues
    1. Accident Record (March 19, 2019)At 16:13 on March 19, 2019, the monitoring background reported a light gas action of No. 3 main transformer. In accordance with the Code for Operation of Power Transformers (DL/T572-2010), operation and maintenance (O&M) personnel inspected the on-site condition of No. 3 main transformer.On-site confirmation: The WBH non-electrical protection panel of No. 3 main transformer reported a Phase B light gas action of the transformer body, and the reset was ineff
    02/05/2026
  • Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
    Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
    01/30/2026
  • Neutral point grounding operation mode for 110kV~220kV power grid transformers
    The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
    01/29/2026
  • Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
    Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
    01/29/2026
  • Why Must a Transformer Core Be Grounded at Only One Point? Isn't Multi-Point Grounding More Reliable?
    Why Does the Transformer Core Need to Be Grounded?During operation, the transformer core, along with the metal structures, parts, and components that fix the core and windings, are all situated in a strong electric field. Under the influence of this electric field, they acquire a relatively high potential with respect to ground. If the core is not grounded, a potential difference will exist between the core and the grounded clamping structures and tank, which may lead to intermittent discharge.I
    01/29/2026
  • Understanding Transformer Neutral Grounding
    I. What is a Neutral Point?In transformers and generators, the neutral point is a specific point in the winding where the absolute voltage between this point and each external terminal is equal. In the diagram below, pointOrepresents the neutral point.II. Why Does the Neutral Point Need Grounding?The electrical connection method between the neutral point and earth in a three-phase AC power system is called theneutral grounding method. This grounding method directly affects:The safety, reliabilit
    01/29/2026
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.