• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


On-line Monitoring System for Distribution Lines

  • On-line Monitoring System for Distribution Lines
  • On-line Monitoring System for Distribution Lines

Key attributes

Brand RW Energy
Model NO. On-line Monitoring System for Distribution Lines
CPU Intel x86
RAM DDR3 2GB
ROM 250G HHD or SSD
Series RWZ-1000

Product descriptions from the supplier

Description

Description:

RWZ-1000 distribution line fault online monitoring system mainly realizes real-time monitoring of power grid operation by collecting real-time data (such as current, voltage information, switch position signal, switch protection behavior SOE information, etc.) of switches distributed at each responsibility boundary point of the distribution network. Through the management platform, the on-duty personnel and system scheduler can grasp the operation status of the system and the initiative of accident handling in time. In addition, the supporting mobile client software realizes the function of mobile terminal, which can view or manage the power grid anytime and anywhere, improving the automatic management level and power supply quality of the distribution network.

The B/S structure (browser/server) mode is mainly adopted, and the system is entered through the WEB browser. This mode unifies the client and concentrates the core part of the system function on the server. Compared with the traditional C/S structure (client/server), it simplifies the deployment, maintenance and use of the system. The advantage of the system is that it can be operated anywhere without installing any special software, as long as there is a computer with Internet access, it can be used, and the client is zero installation and zero maintenance. The supporting mobile phone client has realized the mobile terminal management function, and only a mobile phone authorized to install software can view and manage the power grid anytime and anywhere through the mobile phone client.

Main function introduction:

  • To achieve remote signaling remote measuring, remote controlling, remote Settings and fault real-time monitoring.

  • Event alarm (audio alarm and SMS alarm).

  • Device positioning (can visually display the geographic information, status and measurement value of the device on the map).

  • Fault point map navigation (through the mobile phone, direct navigation to the fault point).

  • Event recording and handling methods.

  • Real-time data display of distribution network wiring diagram.

  • Control and remote Settings (remote control, remote equipment parameter setting).

  • Historical data management and inquiry.

  • Historical telemetry data curve.

  • Responsibility area and authority management.

  • System equipment partition and level management.

  • Mobile client (with line status and line fault alarm).

How dose using RWZ-1000 system for distribution network automation?

If you want to use the RWZ-1000 as your SCADA service system, you need to do the following:

  • Make sure that the devices on your line have been connected to the network through GPRS/CDMA communication, Passing GPRS/CDMA  communication controller terminal: Real-time collection of primary switching equipment (such as intelligent vacuum circuit breaker) voltage, current and other information through GPRS/CDMA  transmission mode, realize the local line protection function (including overcurrent protection, phase short circuit, zero sequence protection, etc.) upload to the server, but also can execute the background issued remote control opening and closing command and protection set parameter modification command. Controller terminal is the main mechanism of distribution network automation, so it is very important to choose the right controller.  (as shown below).

企业微信截图_17344026731723.png

Computer room construction (as shown below):

  • You need to prepare the server(cloud server) to build a database, which is used to store the telecontrol, telemetry, remote control, remote control and fault record data of distribution network switches collected by the power monitoring server, which is the data basis of distribution network operation analysis.

  • In addition, it is necessary to prepare the server(cloud server)required for monitoring services. Through the GPRS/CDMA network, the remote data and SOE data sent by the intelligent switch controller are centrally processed, and the data are recorded and saved. At the same time, it receives access requests from clients in the corresponding LAN and clients outside the LAN, so that the clients can monitor the equipment and maintain the system data.

  • Prepare one or more client devices that can display graphics. Through graphics, the status of switches on the distribution network line can be viewed in real time, and the automatic switches on the distribution network line can be operated remotely by applying for the operation password to the dispatch center according to the need.

企业微信截图_17344028071134.png

Configuration requirements:

企业微信截图_17344032894600.png

What is a SCADA system?

A: SCADA (Supervisory Control And Data Acquisition) system, that is, data acquisition and monitoring control system. It is mainly used to centrally monitor and manage various industrial processes, infrastructure, etc. For example, in the power system, SCADA system can collect voltage, current and other data of the substation in real time to monitor the running state of the equipment. 

What are the important components of a SCADA system?

A: It includes the Remote Terminal Unit (RTU), which is responsible for collecting field data. Programmable logic controller (PLC) for logic control; Communication network for data transmission There is also a human-machine interface (HMI) in the monitoring center, which is convenient for operators to monitor and manage. 

What are the advantages of SCADA systems?

A: It can improve productivity, through real-time monitoring to detect and solve problems in time. It can be operated remotely to reduce the cost of human on-site inspection. At the same time, it can store and analyze a large amount of data.


FAQ
Q: What is the role of the distribution automation system
A:

Five core functions of distribution automation systen

  1. Fault Isolation Fast isolation of fault section,reduce the scope of power cuts,avoid overridetrip and expand the outage scope.
  2. Fault location Locate fault section accurately,shorten the time of troubleshooting.
  3. Alarm Push Push the fault type,fault time and switch position to the responsible person'smobile phone and monitoring center in time.
  4. Monitoring Analysis Real-time monitoring of load current,voltage,switch state,three-phaseunbalance,overload abnormal alarm,viewing the historical data statistics,analyzing historical load and setting reasonable value.
  5. Setting Value Remotely Adjusting protection values remotely for saving times and efforts.
Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 30000m² Total staff: Highest Annual Export(usD): 100000000
Workplace: 30000m²
Total staff:
Highest Annual Export(usD): 100000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Instrument meters/New energy/Tester/Robot
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025
  • Risk Identification and Control Measures for Distribution Transformer Replacement Work
    1.Electric Shock Risk Prevention and ControlAccording to typical design standards for distribution network upgrades, the distance between the transformer’s drop-out fuse and the high-voltage terminal is 1.5 meters. If a crane is used for replacement, it is often impossible to maintain the required minimum safety clearance of 2 meters between the crane boom, lifting gear, slings, wire ropes, and the 10 kV live parts, posing a severe risk of electric shock.Control Measures:Measure 1:De-energize th
    12/25/2025

Related Solutions

  • Distribution automation systems solutions
    What are the difficulties in overhead line operation and maintenance?Difficulty one:Overhead lines of distribution network have wide coverage,complicatedterrain,many radiation branches and distributed power supply,resultingin "many line faults and difficulty in fault troubleshooting".Difficulty Two:Manual troubleshooting is time-consuming and laborious.Meanwhile,therunning current,voltage and switching state of the line cannot be graspedin real time,because of the lack of intelligent technical m
    04/22/2025
  • RW8000 DMS Distribution Management System Solutions
    OverviewNowadays, the development trend of power grid is intellectualization. As an important part of power grid, the power distribution system is very close to the customers and it has to run properly. The distribution management system (DMS)played an important role in it.Introduction:RW8000 power distribution management system (DMS) is designed for the smart grids. It is based on real-time application, centered on distribution network operation and management, focusing on the business process
    09/07/2023
  • High-Precision Electrical Parameter Monitoring System Solution
    1.Introduction​With the increasingly stringent requirements for power supply quality in high-end facilities such as precision manufacturing, medical diagnosis, and data centers, traditional power monitoring systems, due to their low sampling accuracy and weak data analysis capabilities, can no longer meet the demand for deep insight and precise management of power quality. In response, we are introducing a new generation ​High-Precision Electrical Parameter Monitoring System. With ​millisecond-l
    09/28/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.