• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Digital Timer Switch TS-GE2 Programmable Periodic Timer

  • Digital Timer Switch TS-GE2 Programmable Periodic Timer
  • Digital Timer Switch TS-GE2 Programmable Periodic Timer
  • Digital Timer Switch TS-GE2 Programmable Periodic Timer
  • Digital Timer Switch TS-GE2 Programmable Periodic Timer

Key attributes

Brand Switchgear parts
Model NO. Digital Timer Switch TS-GE2 Programmable Periodic Timer
Rated voltage AC220V
Rated normal current 16A
Rated frequency 50/60Hz
Series TS-GE2

Product descriptions from the supplier

Description

The TS-GE2 programmable cycle timer can automatically turn on and off various electrical devices according to the user's set time, with high precision, strong anti-interference and other functions. It is often used in various occasions such as street lamps, light boxes, neon lights, production equipment, agricultural breeding, warehouse exhaust dehumidification, automatic preheating, broadcasting and television equipment, etc. It is a programmable cycle timer with high cost-effectiveness.

TS-GE2 Programmable Cycle Timer Product Features:
1. It has summer time and winter time functions.
2. It can automatically turn on and off the power of various electrical devices according to the time set by the user.
3. Built in lithium battery, it will continue to operate and display after power failure.
4. High precision can make product control more precise.
5. Industrial grade chip design can make product operation more stable.
6. Has strong anti-interference function.

Item No

TS-GE2 16A/20A/25A/30A

Operating Voltage

AC 220-240V 50Hz/60Hz (Other special voltages can be customized)

Power Consumption

4.5VA

Operating Temperature

-10~+50℃

Accuracy

≤1s/d (25℃)

Power consumption

8ON+8OFF

Minimum Setting Range

1Minuters

Time Setting Range

1 minute to 168 hours

Contact Capacity

TS-GE2 16A Resistive: 16A/250VAC(cosφ =1)
TS-GE2 20A Resistive: 20A/250VAC(cosφ =1)
TS-GE2 25A Resistive: 25A/250VAC(cosφ =1)
TS-GE2 30A Resistive: 30A/250VAC(cosφ =1)

Storage Battery

3 YEARS

Dimension

81x36x66mm

Weight

125g

QTY

100PCS

G.W

18kg

N.W

17kg

MEAS

390x220x375mm

Mounting

DIN rail mounting

Documentation Resource Library
Restricted
Digital Timer Switch TS-GE2 Programmable Periodic Timer Contents
Catalogue
English
Consulting
Consulting
FAQ
Q: What are the core functions and advantages of the TS-GE2?
A:

The core functions and advantages focus on four dimensions: precise timing, flexible programming, stable reliability, and convenient adaptation:

·High-precision periodic timing: The timing range covers 1 minute ~ 168 hours with an accuracy of ±1 second/day, supporting daily and weekly cycles to meet short-term and long-term automatic control needs.

·Flexible programming and function expansion: Supports 8 groups of independent program settings for multi-period start-stop; built-in daylight saving/winter time switching function to automatically adapt to seasonal time changes.

·Power failure memory and high reliability: Equipped with a built-in lithium battery, retaining programs and time for ≥7 days after power off, and automatically executing preset programs after power recovery; industrial-grade anti-interference design adapts to complex electrical environments.

·Convenient installation and operation: 35mm DIN rail plug-and-play, compact size (81×36×66mm) to save power distribution space; the digital display is clear and intuitive, with simple key operation, allowing programming without professional technology.

Q: What is the TS-GE2 Digital Timer Switch (Programmable Periodic Timer)?
A:

The TS-GE2 is a DIN rail-mounted programmable periodic timer specially designed for automatic control scenarios, with core functions of automatically controlling circuit on/off according to preset programs. Compatible with AC 220V/240V voltage and 50/60Hz frequency, it supports a timing range of 1 minute ~ 168 hours (full week). Adopting 35mm standard DIN rail installation, it features 8 groups of programmable programs, daylight saving/winter time switching, 12/24-hour format conversion, and a built-in lithium battery for power failure memory (program retention ≥7 days after power off) with an accuracy of ±1 second/day. Equipped with a digital display and key operation, it is widely used in street lights, commercial lighting, agricultural aquaculture, production equipment and other scenarios to achieve unattended automatic control.

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 1000m² Total staff: Highest Annual Export(usD): 300000000
Workplace: 1000m²
Total staff:
Highest Annual Export(usD): 300000000
Services
Business Type: Sales
Main Categories: Low Voltage Electrical Apparatus/Instrument meters/Production equipment/Tester/High Voltage Electrical Apparatus/Electrical fittings/Equipment Parts
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • How to Judge, Detect and Troubleshoot Transformer Core Faults
    1. Hazards, Causes, and Types of Multi-Point Grounding Faults in Transformer Cores1.1 Hazards of Multi-Point Grounding Faults in the CoreUnder normal operation, a transformer core must be grounded at only one point. During operation, alternating magnetic fields surround the windings. Due to electromagnetic induction, parasitic capacitances exist between the high-voltage and low-voltage windings, between the low-voltage winding and the core, and between the core and the tank. The energized windin
    01/27/2026
  • A Brief Discussion on the Selection of Grounding Transformers in Boost Stations
    A Brief Discussion on the Selection of Grounding Transformers in Boost StationsThe grounding transformer, commonly referred to as "grounding transformer," operates under the condition of being no-load during normal grid operation and overloaded during short-circuit faults. According to the difference in filling medium, common types can be divided into oil-immersed and dry-type; according to phase number, they can be classified into three-phase and single-phase grounding transformers. The groundi
    01/27/2026
  • Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding Electrodes
    Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding ElectrodesWhen the grounding electrode of an Ultra-High-Voltage Direct Current (UHVDC) transmission system is located close to a renewable energy power station, the return current flowing through the earth can cause a rise in ground potential around the electrode area. This ground potential rise leads to a shift in the neutral-point potential of nearby power transformers, inducing DC bias (or DC offset) in their
    01/15/2026
  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.