• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


11kV 12kV 35kVSF6 gas-insulated box-type Ring Main Unit/closed switchgear

  • 11kV 12kV 35kVSF6 gas-insulated box-type Ring Main Unit/closed switchgear
  • 11kV 12kV 35kVSF6 gas-insulated box-type Ring Main Unit/closed switchgear

Key attributes

Brand ROCKWILL
Model NO. 11kV 12kV 35kVSF6 gas-insulated box-type Ring Main Unit/closed switchgear
Rated frequency 50/60Hz
Series RMU

Product descriptions from the supplier

Description
Description

SF6 ring main unit has the advantages of compact structure, fully enclosed type, fully insulated layer, long service life, maintenance-free, small indoor space occupation, and no environmental hazards during work. Widely used in industrial production and civil cable ring network and power supply system. It is very suitable for small and medium secondary substations, opening and closing stations, factories and mines, airports, railway lines, residential quarters, multi-storey buildings, highways, subway stations, tunnel construction and other industries.

Working environment conditions

  • Applicable altitude: 1000m
  • Applicable temperature: -40ºC~+45ºC
  • Relative humidity: daily average ≤95%, monthly average ≤90%
  • Earthquake damage level: ≤8

Structural features

  • Safe and reliable operation: Through multiple safety protection designs (such as a comprehensive interlocking mechanism and overload protection), it fully ensures the safety of the equipment during operation and running, effectively avoiding risks such as misoperation and short circuits. It builds a solid foundation for the continuous and stable operation of the power system, ensuring the continuity and reliability of power supply.
  • Integrated three-position load switch: Adopting an integrated three-position load switch (with three working positions: closing, opening, and grounding), it not only simplifies the internal structure and operation process of the equipment but also significantly improves the accuracy, coordination, and response speed of switch actions through precise mechanical linkage design. This reduces operational errors and enhances the stability of equipment operation.
  • Strong economic efficiency and durability: Achieves maintenance-free performance with high-quality materials and sealing technology, eliminating the need for frequent shutdowns for maintenance and reducing labor and material costs. Meanwhile, the equipment has high overall reliability, excellent anti-aging and anti-corrosion properties, and a service life of up to 20 years. This significantly reduces the frequency of equipment replacement and, in the long run, greatly lowers the full-life-cycle operating costs of the project.
  • Flexible and diverse solutions: Supports multiple incoming line modes such as left, right, upper, and forward incoming lines, which can be freely selected according to the on-site space layout. Unit combinations are not restricted, enabling complex combinations such as multi-unit series and parallel connections as needed. Combined with insulated busbar connection technology, it can flexibly build layout schemes of front-rear cabinets or left-right cabinets, perfectly adapting to the installation needs of different power distribution scenarios.
  • Wide design adaptability: The design scheme balances versatility and customization needs. It can not only meet the power distribution scenarios of conventional industrial plants and commercial buildings but also adapt to high-demand power distribution environments in special fields such as new energy power stations, rail transit, and data centers. With flexible and changeable structural design, it easily copes with personalized needs such as voltage levels and load capacities in different scenarios.
  • Efficient outgoing lines and space-saving: The outgoing line circuit design has a large capacity bearing capacity, which can meet the power output needs of high-power equipment. At the same time, it adopts a compact structural layout, minimizing the floor area while ensuring performance. It is especially suitable for scenarios with tight land resources such as urban core areas and industrial parks, achieving dual optimization of efficient power distribution and space utilization.

 

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 108000m²m² Total staff: 700+ Highest Annual Export(usD): 150000000
Workplace: 108000m²m²
Total staff: 700+
Highest Annual Export(usD): 150000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Electric transformer
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding Electrodes
    Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding ElectrodesWhen the grounding electrode of an Ultra-High-Voltage Direct Current (UHVDC) transmission system is located close to a renewable energy power station, the return current flowing through the earth can cause a rise in ground potential around the electrode area. This ground potential rise leads to a shift in the neutral-point potential of nearby power transformers, inducing DC bias (or DC offset) in their
    01/15/2026
  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025

Related Solutions

  • Intelligent Operation Solution for 12kV Vacuum Circuit Breakers: Integrating Real-time Monitoring & Lifetime Optimization
    Ⅰ. Equipment Operation & MaintenanceIntelligent Monitoring System Integration​Multi-parameter Real-time Monitoring: Embedded sensors (temperature, displacement, Hall effect current sensors) track contact temperature rise, mechanical characteristics (opening/closing speed, overtravel), coil current, and partial discharge signals. Data undergoes preprocessing via edge computing prior to cloud upload.​Lifetime Prediction Model: Dynamically evaluates remaining lifespan using electrical wear data
    06/10/2025
  • SF6 Circuit Breaker Solutions for Outdoor Installation (Anti-Pollution & Seismic Resistance)
    I.Core Challenges in Outdoor Installation​In high-voltage transmission and distribution systems, SF6 circuit breakers are exposed to complex outdoor environments for extended periods, facing the following critical issues:​Pollution & Insulation Degradation​Dust, salt fog, and industrial pollutants in outdoor environments easily adhere to equipment surfaces. In coastal or industrial areas, pollution levels may reach ​Class IV, resulting in insufficient creepage distance and triggering ​flasho
    05/12/2025
  • 12kV Indoor Vacuum Circuit Breaker Southeast Asia Solution: Anti-Corrosion Compact Design
    12kV Indoor Vacuum Circuit Breaker Southeast Asia Solution: Anti-Corrosion Compact DesignⅠ. Executive Summary​Southeast Asia faces rapidly growing electricity demand alongside environmental challenges including high temperatures, humidity, salt spray corrosion, and grid instability. This solution recommends ​Solid Insulated Pole-Mounted Vacuum Circuit Breakers (VCB)​​ featuring ​high reliability, ​compact design, and ​smart monitoring. Tailored for tropical climates and industrial scenarios, it
    06/10/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.