Transformer Use and Installation: Ensuring Safe and Reliable Operation

Vziman
Field: Manufacturing
China

Operating Conditions for Transformers

  • The installation site must be free from flooding, located at an altitude not exceeding 1,000 meters, and maintained in an ambient temperature not exceeding 40°C. Relative humidity may reach 100% within an operating temperature range of 40°C to -25°C (on-load tap changers and temperature controllers must be rated for -25°C).

  • The installation area should be clean, free from conductive dust and corrosive gases, and equipped with sufficient natural or mechanical ventilation.

  • When installing, maintain a minimum clearance of 300 mm between the transformer and walls or other obstacles. A 300 mm gap should also be provided between adjacent transformers. These distances may be reduced as necessary in space-constrained environments.

Product Packaging and Transportation

  • Transformers are available in open-type (without protective enclosure) and enclosed-type (with protective housing) configurations. They are typically transported by rail, sea, or road, and may be shipped either partially disassembled (e.g., on-load tap changers, temperature controllers, cooling units, and enclosures packed separately) or fully assembled within a shipping crate.

  • For crated units, lifting slings should be attached to the four bottom corners of the crate. When lifting from open packaging, use dedicated lifting equipment. A trial lift of 100–150 mm is recommended prior to full hoisting to verify stability and detect any abnormalities.

  • Avoid transport routes with inclines exceeding 15°. Position the transformer’s center of gravity along the vehicle’s vertical centerline to ensure even load distribution. Securely fasten the unit to the vehicle to prevent shifting or tipping, aligning the transformer’s long axis with the direction of travel.

Transformer Use and Installation.jpg

Pre-Installation Visual Inspection

  • After unpacking, remove protective covers and inspect the unit’s external condition. Pay close attention to the mechanical integrity of windings and core, the tightness of clamping structures, and the condition of connection bolts.

  • Re-tighten all fasteners and compression points on windings and core in sequence to ensure no looseness.

  • Clean the surface using dry compressed air or a clean, lint-free cloth to remove dust and debris.

  • If the transformer has been in storage for an extended period and shows signs of moisture or condensation, perform drying treatment until the winding insulation resistance meets acceptable standards.

Pre-Commissioning Checks

  • Measure the DC resistance of high- and low-voltage windings and verify results against factory test certificate values.

  • Inspect core grounding for reliability and ensure no foreign objects are creating unintended electrical paths.

  • Perform insulation resistance tests to confirm dielectric integrity.

Network Connection and Operation

  • Prior to full commissioning, operate the transformer under no-load conditions. After three energizing and de-energizing cycles, inspect and fine-tune the protection systems.

  • At the factory, the high-voltage tap changer is set to the rated position. If voltage adjustment is required during operation, it must be performed in accordance with the nameplate-specified rated tap voltage (off-circuit regulation) and only after the transformer has been completely de-energized.

Give a tip and encourage the author!
Recommended
What Is a Magnetic Levitation Transformer? Uses & Future
What Is a Magnetic Levitation Transformer? Uses & Future
In today’s rapidly advancing technological era, the efficient transmission and conversion of electric power have become continuous goals pursued across various industries. Magnetic levitation transformers, as an emerging type of electrical equipment, are gradually demonstrating their unique advantages and broad application potential. This article will thoroughly explore the application fields of magnetic levitation transformers, analyze their technical characteristics and future development tren
Baker
12/09/2025
How Often Should Transformers Be Overhauled?
How Often Should Transformers Be Overhauled?
1. Transformer Major Overhaul Cycle The main transformer shall undergo a core-lifting inspection before being put into service, and thereafter a core-lifting overhaul shall be performed every 5 to 10 years. Core-lifting overhaul shall also be carried out if a fault occurs during operation or if issues are identified during preventive tests. Distribution transformers operating continuously under normal load conditions may be overhauled once every 10 years. For on-load tap-changing transformers, t
Felix Spark
12/09/2025
Adjustment and Precautions for H61 Oil Power 26kV Electric Transformer Tap Changers
Adjustment and Precautions for H61 Oil Power 26kV Electric Transformer Tap Changers
Preparatory Work Before Adjusting the Tap Changer of H61 Oil Power 26kV Electric Transformer Apply for and issue a work permit; carefully fill out the operation ticket; conduct a simulation board operation test to ensure the operation is error-free; confirm the personnel who will carry out and supervise the operation; if load reduction is required, notify affected users in advance. Before construction, power must be disconnected to take the transformer out of service, and voltage testing must be
James
12/08/2025
H59/H61 Transformer Failure Analysis and Protection Measures
H59/H61 Transformer Failure Analysis and Protection Measures
1.Causes of Damage to Agricultural H59/H61 Oil-Immersed Distribution Transformers1.1 Insulation DamageRural power supply commonly uses a 380/220V mixed system. Due to the high proportion of single-phase loads, H59/H61 oil-immersed distribution transformers often operate under significant three-phase load imbalance. In many cases, the degree of three-phase load imbalance far exceeds the limits permitted by operational regulations, causing premature aging, deterioration, and eventual failure of th
Felix Spark
12/08/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.