Hydrant System for Power Plant Fire Protection

03/20/2024

WechatIMG1824.jpeg

Power Plant Fire Protection System (Part-II of III)

This section comprises of water based fire protection system called hydrant system in thermal power plants.
Flow Scheme for a Typical 660 MW Unit

Hydrant System

Hydrant system shall consist of a fire water ring main network of piping along with:

  • Isolation gate valves installed above ground on RCC pedestals around areas to be protected.

  • Hydrant valves (external/internal)

  • Hose cabinets

  • Couplings

  • Branch pipe

  • Nozzles and water monitors along with all accessories.

  • Other accessories like MS painted hose box shall be provided as per TAC.

  • External hydrants Hose houses or hose boxes shall be located all around the periphery of buildings and internal hydrants “hose box” shall be provided at each landing floor of staircases through above ground main.

Fixed Water Monitors (outdoor type) shall be provided for:

  • ESP areas,

  • Boiler house

  • Tall building

  • Coal stock pile area

  • Bunker building

  • Junction tower/transfer towers and

  • Other areas in the coal conveyor at locations where water can’t reach from hydrant system.

Hydrant System Requirements

Hydrant system requirements shall be designed keeping the following aspects of design in mind in line with the TAC requirements:

  • The hydrant network shall be sized to ensure that about 3.5 Kg/cm2 pressures are available at the hydraulically remotest point (as per TAC) in the system with the hydrant pump discharging the flow at rated pump capacity and head.

  • The velocity in the hydrant main shall not exceed 5.0 m/s.

  • At least two hydrants shall be provided with separate ring main for the main plants.

  • Spacing of each outdoor hydrant shall be provided 45 meters distance. The internal hydrant/landing valves shall be provided 45 meters distance in case of TG halls, Mill bay, Boiler and other area 30 Meters distance at each floor space.

  • Building shall be deemed to be protected by a hydrant if the hydrant is within 15 meters of the building.

  • Each of the landing valves and external hydrant valves associated with the main plant like transformer yard, TG building and Boiler area to be provided with a hose box.

  • Each ring mains to be terminated with an isolation valve and a blind flange at all the corners to enable future expansion/modification.

  • Fire water booster system pump head shall be designed for farthest top most point of the boiler and pressure will be tested at that elevation.

  • All the landings of boiler staircase, turbine buildings and other multi-storied structures, coal handling plant transfer points/junction towers, crusher house, bunker floors and other auxiliary buildings/non-plant buildings shall be provided with landing valves with hose box including the hose reels.

Spray System

The spray system works automatically. The deluge valves are operated and controlled by fire detection devices i.e. quartzite bulb detectors or by some other means of fire detection. The system could be pressurized till to the Deluge valves.
It covers all transformers located area, turbine and its auxiliaries, all oil storage tanks, cooling units and purifiers units. The equipment used in the whole system is spray pumps, the pressure controlling unit, variety of valves and strainers. There are two methods of spray system:

  1. High Velocity Water spray system (HVWS system)

  2. Medium Velocity Water spray system (MVWS system)

High Velocity Water Spray System (HVWS)

HVWS shall be designed as per TAC regulations. HVWS shall consists of above group piping, along with relevant fittings, deluge valves, isolation gate valves, spray nozzles, Quartzite bulb detector and pressure switches. HVWS system shall be equipped with the provision of automatically detect, control & extinguish any outburst of fire. The system shall allow hydraulically open the deluge valve thus allowing water to be sprayed on the equipment/area through projector nozzles in the form of a solid conical emulsifying spray.

Isolation gate valve and y-type strainer shall be provided on upstream and downstream side of the deluge valve. Fast acting butterfly valve shall be provided as a by-pass to deluge valve, so that this valve can be kept closed and can be operated manually in case of malfunction of deluge valve.
High Velocity Water Spray System
High Velocity Water Spray System
The pressure at the hydraulically most remote point in the network shall not be less than 3.5 bars for outdoor transformers as per TAC.
Placing of spray nozzles shall be such that their spray nozzles should cones overlap each other.

Areas covered under HVWS are:

  • All oil filled Generator transformers and its surrounding areas.

  • Unit auxiliary transformers.

  • Unit transformers.

  • Station auxiliary transformers.

  • Stand-by maintenance transformers.

  • Bus reactors.

  • CHP auxiliary transformers.

  • AHP auxiliary transformers.

  • Station transformer (transformer rating 10 MVA and above).

  • All type of oil storage tanks.

  • Oil coolers and purifiers unit.

  • Boiler’s burner and its surroundings.

  • Turbine Lube oil storage tanks and Turbine Oil purifier.

  • Clean and dirty lube oil tanks.

  • Boiler Feed Pumps lube oil tanks, coolers, consoles etc.

  • Turbine Oil canal pipelines in main plant.

  • Fuel Oil Pressurizing and Heating Units

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Hello,I'm Wdwiin. A decade of hands-on experience in electrical engineering, specializing in high-voltage systems, smart grids, and renewable energy technologies. Passionate about technical exchange and knowledge sharing, committed to interpreting industry trends with professional insights to empower peers. Connection creates value—let’s explore the boundless possibilities of the electrical world together!

What is the difference between a dielectric and an insulator?
What is the difference between a dielectric and an insulator?
Dielectrics and insulators are distinguished primarily by their applications. One of the main differences is that a dielectric can store electrical energy by becoming polarized in an electric field, whereas an insulator resists the flow of electrons to prevent current conduction. Other key differences between them are outlined in the comparison chart below.Definition of DielectricA dielectric material is a type of insulator that contains few or no free electrons. When subjected to an electric fi
08/30/2025
What losses occur during operation of the transformer? How to reduce losses?
What losses occur during operation of the transformer? How to reduce losses?
Transformers experience various types of losses during operation, primarily categorized into two main types: copper losses and iron losses.Copper LossesCopper losses, also known as I²R losses, are caused by the electrical resistance of the transformer windings—typically made of copper. As current flows through the windings, energy is dissipated in the form of heat. These losses are proportional to the square of the load current (I²R), meaning they increase significantly with high
Rockwell
08/29/2025
Cable Fault Detection, Testing, Location and Repair
Cable Fault Detection, Testing, Location and Repair
I. Methods for Cable Testing and Inspection:Insulation Resistance Test: Use an insulation resistance tester to measure the insulation resistance value of the cable. A high insulation resistance value indicates good insulation, while a low value may suggest insulation problems requiring further investigation.Voltage Withstand Test: Apply a high-voltage test using a high-voltage tester to verify whether the cable can withstand high voltage under its rated operating conditions. Under normal circums
08/29/2025
Cable Quality Inspection and Cable Detection & Testing
Cable Quality Inspection and Cable Detection & Testing
Power cable quality inspection and cable testing are conducted to ensure that the cable's quality and performance meet specified requirements, thereby guaranteeing the safe and stable operation of power systems. Below are some common contents of power cable quality inspection and cable testing:Visual Inspection: Check the cable surface for physical defects such as damage, deformation, or scratches to ensure the cable's exterior is intact.Dimensional Measurement: Measure dimensional parameters su
08/29/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!