Why does Feeder Automation (FA) cause simultaneous operations of switches in multiple lines?

RW Energy
08/06/2025

Feeder Automation (FA) and Under-Frequency Load Shedding (UFLS) are two critical protection and control mechanisms in power systems. While both aim to ensure safe and stable system operation, they carry potential conflicts in logic and timing that require careful coordination.

Feeder Automation (FA): Primarily addresses local feeder faults (e.g., short circuits, ground faults) in distribution networks. Its objective is to quickly locate and isolate faulted sections and restore power to non-faulted areas via network reconfiguration using switches. FA emphasizes rapid local power restoration.

Under-Frequency Load Shedding (UFLS): Responds to severe frequency drops in the interconnected grid (e.g., due to generator tripping, sudden load increase, or tie-line disconnection causing power deficit). It systematically sheds pre-designated non-critical loads to prevent frequency collapse, restore power balance, and stabilize system frequency. UFLS prioritizes overall system frequency security.

Under-Voltage Load Shedding (UVLS): Monitors system voltage in real time. When voltage drops below a preset threshold, the UVLS scheme determines whether to act based on predefined logic. If conditions are met, it sequentially sheds loads to reduce reactive power demand or enhance reactive support, thereby restoring voltage to normal levels.

Conflict Case Examples

  • Case 1: In 2019, in North America, FA-induced power restoration triggered a secondary frequency collapse.
  • Case 2: In 2020, in East China, FA operation following a short-circuit fault caused erroneous UFLS activation.
  • Case 3: In 2021, wind farm disconnection triggered overlapping actions between UFLS and FA.
  • Case 4: In 2022, during a typhoon in South China, FA network reconfiguration led to excessive load shedding.

Event Description

In 2022, 110kV Line A and a power plant’s grid-connected Line B were operating on Bus Section I of a 110kV substation. A fault on Line A caused Switch A to trip. However, since the plant’s Line B switch remained closed, power continued to be supplied to the substation. As a result, the voltage on Bus Section I did not fall below the undervoltage threshold, preventing the 110kV automatic transfer switch (ATS) from initiating. Similarly, the plant supplied power via Transformer No. 1 to the 10kV Buses I and IV, whose voltages also remained above threshold, so the 10kV ATS did not activate.

As the plant continued to supply load, system frequency gradually declined. 5.3 seconds after Switch A tripped, frequency dropped to 48.2 Hz. The plant’s under-voltage and under-frequency separation device, set at 47 Hz and 0.5 s, did not operate. However, the substation’s UFLS relay, set at 48.25 Hz and 0.3 s, detected the frequency of 48.12 Hz and operated correctly, shedding several 10kV feeders (Lines C, D, E, F, G). All secondary equipment operated as expected.

On-site Review

The 110kV substation’s Switch A tripped correctly due to protection action, and UFLS operated, disconnecting Lines C, D, E, F, and G. The substation switches issued trip signals, triggering FA activation. The fault was identified between the substation switch and the first line switch. FA initiated on all five lines, locating the fault between the substation outlet and the first switch. However, no fault was found during on-site inspection, confirming a false FA operation.

Solution

  • Enhance synchronization of load shedding information. For lines with UFLS/UVLS protection, support blocking of automatic load transfer functions.
  • Implement robust load transfer blocking: in fully automatic centralized FA schemes, upon receiving a load shedding signal, immediately block the FA execution function for the affected lines.
RW Energy

Wenzhou Rockwell Transformer Co., Ltd. It is a high - tech enterprise integrating R & D, production, sales, and service. It focuses on the manufacturing of power transformers and supporting equipment, and is committed to providing efficient, reliable, and energy - saving power transmission and distribution solutions for global customers. We can offer: •Distribution transformers and substations •Outdoor switchgears and breakers(recloser) •Switchgears and it’s components (GIS, RMU, VCB, SF6 CB) Market and Service: We always take customers as the orientation and provide customized services according to their requirements. Our products are exported to the Middle East, Africa, Northern Europe, South America, and many other countries and regions. Drive the future of electricity with technological innovation and become a leading global supplier of intelligent power equipment.

Fault Analysis and Treatment of Oil-Immersed Transformers
Fault Analysis and Treatment of Oil-Immersed Transformers
Oil Leakage at Welded JointsOil leakage at welded joints primarily stems from poor welding quality, such as incomplete or detached welds, and defects like pinholes and gas pores. Although oil-immersed transformers are initially coated with solder and paint during manufacturing, potentially masking these issues temporarily, the defects tend to surface during operation. Additionally, electromagnetic vibration can cause weld cracks, leading to oil leakage.To resolve such leaks, the first critical s
08/29/2025
What losses occur during operation of the transformer? How to reduce losses?
What losses occur during operation of the transformer? How to reduce losses?
Transformers experience various types of losses during operation, primarily categorized into two main types: copper losses and iron losses.Copper LossesCopper losses, also known as I²R losses, are caused by the electrical resistance of the transformer windings—typically made of copper. As current flows through the windings, energy is dissipated in the form of heat. These losses are proportional to the square of the load current (I²R), meaning they increase significantly with high
Rockwell
08/29/2025
Transformer Detection, Testing, Maintenance and Servicing
Transformer Detection, Testing, Maintenance and Servicing
Transformer testing, inspection, and maintenance are essential tasks to ensure normal operation and extend the service life of transformers. Below are some recommended steps:Visual Inspection: Regularly inspect the transformer's exterior, including the enclosure, cooling system, and oil tank. Ensure the enclosure is intact, free from corrosion, damage, or leakage.Insulation Resistance Testing: Use an insulation resistance tester to check the transformer's insulation system. Verify that the insul
Vziman
08/29/2025
Preventive Detection and Testing of Transformers
Preventive Detection and Testing of Transformers
I. DC Resistance Test of Transformer Primary and Secondary Windings:The DC resistance of transformer primary and secondary windings can be measured using the four-wire (Kelvin) method, which is based on principles related to accurate resistance measurement.In the four-wire method, two test leads are connected to both ends of the winding under test, while the other two leads are connected to adjacent winding terminals. An AC power source is then applied to the two leads connected to the adjacent
Rockwell
08/28/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!