Feeder Automation (FA) and Under-Frequency Load Shedding (UFLS) are two critical protection and control mechanisms in power systems. While both aim to ensure safe and stable system operation, they carry potential conflicts in logic and timing that require careful coordination.
Feeder Automation (FA): Primarily addresses local feeder faults (e.g., short circuits, ground faults) in distribution networks. Its objective is to quickly locate and isolate faulted sections and restore power to non-faulted areas via network reconfiguration using switches. FA emphasizes rapid local power restoration.
Under-Frequency Load Shedding (UFLS): Responds to severe frequency drops in the interconnected grid (e.g., due to generator tripping, sudden load increase, or tie-line disconnection causing power deficit). It systematically sheds pre-designated non-critical loads to prevent frequency collapse, restore power balance, and stabilize system frequency. UFLS prioritizes overall system frequency security.
Under-Voltage Load Shedding (UVLS): Monitors system voltage in real time. When voltage drops below a preset threshold, the UVLS scheme determines whether to act based on predefined logic. If conditions are met, it sequentially sheds loads to reduce reactive power demand or enhance reactive support, thereby restoring voltage to normal levels.
Conflict Case Examples
Event Description
In 2022, 110kV Line A and a power plant’s grid-connected Line B were operating on Bus Section I of a 110kV substation. A fault on Line A caused Switch A to trip. However, since the plant’s Line B switch remained closed, power continued to be supplied to the substation. As a result, the voltage on Bus Section I did not fall below the undervoltage threshold, preventing the 110kV automatic transfer switch (ATS) from initiating. Similarly, the plant supplied power via Transformer No. 1 to the 10kV Buses I and IV, whose voltages also remained above threshold, so the 10kV ATS did not activate.
As the plant continued to supply load, system frequency gradually declined. 5.3 seconds after Switch A tripped, frequency dropped to 48.2 Hz. The plant’s under-voltage and under-frequency separation device, set at 47 Hz and 0.5 s, did not operate. However, the substation’s UFLS relay, set at 48.25 Hz and 0.3 s, detected the frequency of 48.12 Hz and operated correctly, shedding several 10kV feeders (Lines C, D, E, F, G). All secondary equipment operated as expected.
On-site Review
The 110kV substation’s Switch A tripped correctly due to protection action, and UFLS operated, disconnecting Lines C, D, E, F, and G. The substation switches issued trip signals, triggering FA activation. The fault was identified between the substation switch and the first line switch. FA initiated on all five lines, locating the fault between the substation outlet and the first switch. However, no fault was found during on-site inspection, confirming a false FA operation.
Solution
Wenzhou Rockwell Transformer Co., Ltd. It is a high - tech enterprise integrating R & D, production, sales, and service. It focuses on the manufacturing of power transformers and supporting equipment, and is committed to providing efficient, reliable, and energy - saving power transmission and distribution solutions for global customers. We can offer: •Distribution transformers and substations •Outdoor switchgears and breakers(recloser) •Switchgears and it’s components (GIS, RMU, VCB, SF6 CB) Market and Service: We always take customers as the orientation and provide customized services according to their requirements. Our products are exported to the Middle East, Africa, Northern Europe, South America, and many other countries and regions. Drive the future of electricity with technological innovation and become a leading global supplier of intelligent power equipment.