What is Electrical Insulator Testing?

Encyclopedia
Encyclopedia
Field: Encyclopedia
0
China


What is Electrical Insulator Testing?


Electrical Insulator Definition


An electrical insulator is defined as a device that resists the flow of electric current, providing protection and ensuring safety in electrical systems.

 


Causes of Insulator Failure


Cracking, defective materials, porosity, improper glazing, flashover, and mechanical stress are primary causes of insulator failure.

 


Testing of Insulators


Flashover tests of insulator

 

Power Frequency Dry Flashover Test of Insulator


  • First the insulator to be tested is mounted in the manner in which it would be used practically.



  • Then terminals of variable power frequency voltage source are connected to the both electrodes of the insulator.



  • Now the power frequency voltage is applied and gradually increased up to the specified value. This specified value is below the minimum flash over voltage.



  • This voltage is maintained for one minute and observe that there should not be any flash-over or puncher occurred.



  • The insulator must be capable of sustaining the specified minimum voltage for one minute without flash over.

 


Power Frequency Wet Flashover Test or Rain Test of Insulator


  • In this test also the insulator to be tested is mounted in the manner in which it would be used practically.



  • Then terminals of variable power frequency voltage source are connected to the both electrodes of the insulator.



  • After that the insulator is sprayed with water at an angle of 45o in such a manner that its precipitation should not be more 5.08 mm per minute. The resistance of the water used for spraying must be between 9 kΩ 10 11 kΩ per cm3 at normal atmospheric pressure and temperature. In this way we create artificial raining condition.



  • Now the power frequency voltage is applied and gradually increased up to the specified value.



  • This voltage is maintained for either one minute or 30 second as specified and observe that there should not be any flash-over or puncher occurred. The insulator must be capable of sustaining the specified minimum power frequency voltage for specified period without flash over in the said wet condition.

 


Power Frequency Flash over Voltage test of Insulator


  • The insulator is kept in similar manner of previous test.



  • In this test the applied voltage is gradually increased in similar to that of previous tests.



  • But in that case the voltage when the surroundings air breaks down, is noted.

 


Impulse Frequency Flash over Voltage Test of Insulator


The overhead outdoor insulator must be capable of sustaining high voltage surges caused by lightning etc. So this must be tested against the high voltage surges.


 

  • The insulator is kept in similar manner of previous test.



  • Then several hundred thousands Hz very high impulse voltage generator is connected to the insulator.



  • Such a voltage is applied to the insulator and the spark over voltage is noted.



  • The ratio of this noted voltage to the voltage reading collected from power frequency flash over voltage test is known as impulse ratio of insulator.

 


6d1f83dddcf9e7757c46b02948d182f5.jpeg

 


This ratio should be approximately 1.4 for pin type insulator and 1.3 for suspension type insulators.


Performance tests


  • Temperature Cycle Test of Insulator



  • The insulator is first heated in water at 70oC for one hour.



  • Then this insulator immediately cooled in water at 7oC for another one hour.



  • This cycle is repeated for three times.



  • After completion of these three temperature cycles, the insulator is dried and the glazing of insulator is thoroughly observed.



  • After this test there should not be any damaged or deterioration in the glaze of the insulator surface.


Puncture Voltage Test of Insulator


  • The insulator is first suspended in an insulating oil.



  • Then voltage of 1.3 times of flash over voltage, is applied to the insulator.


Porosity Test of Insulator


  • The insulator is first broken into pieces.



  • Then These broken pieces of insulator are immersed in a 0.5 % alcohol solution of fuchsine dye under pressure of about 140.7 kg ⁄ cm2 for 24 hours.



  • After that the sample are removed and examine.


Mechanical Strength Test of Insulator


  • The insulator is applied by 2½ times the maximum working strength for about one minute.



  • The insulator must be capable of sustaining this much mechanical stress for one minute without any damage in it.


Routine tests


Each of the insulator must undergo the following routine test before they are recommended for using at site.


Proof Load Test of Insulatot


In proof load test of insulator, a load of 20% in excess of specified maximum working load is applied for about one minute to each of the insulator.


Corrosion Test of Insulator


  • The insulator with its galvanized or steel fittings is suspended into a copper sulfate solution for one minute.



  • Then the insulator is removed from the solution and wiped, cleaned.



  • Again it is suspended into the copper sulfate solution for one minute.


  • 4.The process is repeated for four times.

 

Give a tip and encourage the author!
Recommended
Three-Phase SPD: Types, Wiring & Maintenance Guide
Three-Phase SPD: Types, Wiring & Maintenance Guide
1. What Is a Three-Phase Power Surge Protective Device (SPD)?A three-phase power surge protective device (SPD), also known as a three-phase lightning arrester, is specifically designed for three-phase AC power systems. Its primary function is to limit transient overvoltages caused by lightning strikes or switching operations in the power grid, thereby protecting downstream electrical equipment from damage. The SPD operates based on energy absorption and dissipation: when an overvoltage event occ
James
12/02/2025
Railway 10kV Power Through Lines: Design & Operation Requirements
Railway 10kV Power Through Lines: Design & Operation Requirements
The Daquan Line has a large power load, with numerous and scattered load points along the section. Each load point has a small capacity, with an average of one load point every 2-3 km, so two 10 kV power through lines should be adopted for power supply. High-speed railways use two lines for power supply: primary through line and comprehensive through line. The power sources of the two through lines are taken from the dedicated bus sections fed by the voltage regulators installed in each power di
Edwiin
11/26/2025
Neutral Grounding Methods for Conventional-Speed Railway Power Systems
Neutral Grounding Methods for Conventional-Speed Railway Power Systems
Railway power systems primarily consist of automatic block signaling lines, through-feeder power lines, railway substations and distribution stations, and incoming power supply lines. They provide electricity to critical railway operations—including signaling, communications, rolling stock systems, station passenger handling, and maintenance facilities. As an integral part of the national power grid, railway power systems exhibit distinct characteristics of both electrical power engineering and
Echo
11/26/2025
Application of Condition Monitoring Technology in UHV Transmission Lines
Application of Condition Monitoring Technology in UHV Transmission Lines
1. Application of Condition Monitoring Technology in UHV Transmission LinesAt present, the main characteristics of UHV (Ultra-High Voltage) transmission line condition monitoring technology in China are reflected in the following aspects: Comprehensiveness: In general, during the implementation of monitoring technology, supporting facilities and integrated systems are required to ensure effective monitoring performance; High value: UHV transmission line condition monitoring technology is a criti
Echo
11/20/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.