Masalah dan Tindakan Pencegahan untuk Koneksi Kabel Unit Lingkaran Utama Tangki Umum Isolasi Gas SF₆ 10kV (Gaya Eropa)

Na gode da kudin da ƙarin tushen ƙarfin ƙungiyoyi 10kV SF₆ gas-insulated common tank Ring Main Unit (European-Style) Cable Connections

Daga cewa an yi amfani da hanyoyi na cable lines a jamiyar masana'antu, ƙungiyoyin 10kV SF₆ gas-insulated common tank Ring Main Units (RMUs) (European-style) suna fi amfani a matsayin mafi girman masana'antu saboda irin da suka haɗa da zuba ta duka, gaba da duka, ba a tabbas shi, tsari mai yawa, da kuma ingantaccen sauyin. Waɗannan RMUs European-style sun fi yawa waɗannan wurare da ke faruwa da fata, da kuma suna da zama da kyau a cikin gwamnati.

A nan da ake samun abubuwan da suka faruwa a cikin RMUs, akwai abubuwan da suka faruwa a cikin ƙofin da take da RMU bushings da 10kV cables. Wannan ya fi yawa wajen RMUs na duk'ar da kuma na gida da take da shirya da hanyoyin da suka fi yawa. Idan faruwa ya faru, za a yi de-energization da kuma kawo RMU kadan, da kuma za a yi sautin cable T-body connector. Wannan ya taimaka da yawan tabbacin shirya da kuma kusan lalace-aiki.

A cikin ƙofin da take da RMU bushings da 10kV cables, wani muhimmin yanayi da ke faruwa. Wannan littafi ya nuna abubuwan da suka faruwa da kuma ake bayyana ƙarin tushen.

1. Abubuwan da suka faruwa a cikin Common Tank RMUs da Three-Core Cable Connections

Yanzu, ƙungiyoyin 10kV SF₆ common tank RMUs (European-style) da kuma cable T-body connectors suna fi amfani a matsayin ƙungiyoyi na European. Waɗannan suna da rikitar da take da single-core cables, wadanda suke fi yawa da sautin da kuma inganta, ba a tabbas shi, ba suke yi torsional torque a cikin bushings, suke bayyana ingantaccen contact bayan terminal da bushing, da kuma suke rage ƙarin tushen. Duk da haka, a cikin sautin three-core cables, wannan ya fi yawa mafi yawa, da kuma ya faruwa abubuwan da ba a cikin single-core installations:

  1. Three-core cable fixing point ita ce outer sheath:​ Ba a zama iya fix individual phases ba. Idan ake yi connection, weight da kuma external forces ya taimaka da torsional torque a cikin bushing sections.
  2. Phase sequence alignment requires torque:​ A cikin sautin three-core cables, phase sequence alignment ya fi yawa da apply torque idan ake yi fixation. Bayan ake yi installation, internal stress da take da twisting ya faruwa, da kuma ya taimaka da restoring torque a cikin bushings.
  3. Limited cable chamber height:​ Tsari mai yawa da ke RMUs (da ake design da take da single-core cables) ya rage available length of each individual cable core phase.
  4. Limited adjustment after termination:​ Idan ake crimp cable lug, installation length ya rage fixed. Duk da individual core lengths (saboda space constraints) da suke fi yawa da bend, forcing the T-body connector into position ya fi yawa da apply excessive pushing, pulling, or levering forces. Wannan ya taimaka da damage bushings ko kuma poor contact.

2. Ƙarin tushen

Don bincike abubuwan da suka faruwa, ƙarin tushen suna da shi a matsayin RMU, T-body connectors, installation practices, da kuma civil foundation na RMU.

2.1 Ring Main Unit (RMU)

2.1.1 ​Adequately Increase Cable Chamber Height:
SF₆ common tank RMU cable chambers suna da tsari mai yawa (approx. H: 600mm, W: 350mm). Wannan ya fi yawa single-core cables, amma ya rage installation da T-body connectors, especially on large-section cables (240mm² or 300mm²), mafi yawa for three-core cables. T-body connector's trifurcating sleeve ya rage space, leaving only ~400mm for cable cores. Large-section cores suna da rigakki, da kuma site constraints, achieving correct T-body positioning ya fi yawa.

  • Solution:​ Although common tank RMUs are standardized, installation height can be increased using an extension base. Elevating the chamber height to ~800mm and ensuring the cable clamp's vertical distance from the HV bushing center point is ≥750mm allows core lengths of ~600mm. This facilitates correct T-body installation. Essentially, the extension base lengthens the separated single-phase cores after the three-core cable split, enabling connection similar to single-core cables.
  • Benefits:​ (1) Significantly reduces torsional torque on bushings; (2) Increases installation tolerance, minimizing need for force; lowers gas leakage risk; (3) Facilitates correct positioning of lugs and stress cones.

2.1.2 ​Consider Bushing Conductivity During RMU Selection:
Standard 630A RMUs often have bolt-type bushings with an outer copper tube diameter of 25mm and threaded inner hole for M16 bolts (conductive area ~289.6mm²). Actual contact area is often smaller due to fit tolerances. When stainless steel bolts are used (due to soft copper), conduction relies only on this end contact. Inside the sealed insulation, heat dissipation is poor. If the lug-to-bushing contact is poor under high currents (>400A), thermal faults occur.

  • Solution:​ For RMUs using 240mm² or 300mm² cables running >400A, select models with 800A-rated bushings (outer copper tube Ø 32mm) to reduce thermal fault risk.

2.1.3 ​Enhance RMU Bushing Temperature Monitoring:
Sealed common tank RMUs cannot be opened for inspection. Standard IR thermography cannot measure joint temperatures. Adding inspection ports compromises the IP rating.

  • Solution:
    • Routine checks: Manually feel cable chamber front panel temperature to detect T-body overheating.
    • Critical units: De-energize periodically after initial high-current operation to inspect connections for overheating signs.
    • Best practice (Technology):​ Install temperature sensors directly on RMU bushings or T-body connectors for real-time temperature monitoring.

2.2 Cable T-Body Connector

2.2.1 ​Ensure Quality of Conductive Components:
Switching to stainless steel bolts makes conduction solely dependent on end contact, increasing demands on lug structure/material quality. Common issues found:

Lug contact surface too narrow/hole too large → reduced contact area.

Poor lug material quality, uneven plating.

Mismatch between lug hole taper and double-ended bolt → lug cannot contact bushing properly → conduction only via bolt.

Copper washer too thin/small → cannot ensure parallel lug-to-bushing contact.

All lead to reduced current capacity and thermal fault risk.

  • Solution:​ Specify T-body connector conductive components clearly:
    • Lug contact surface width: 25mm or 32mm (match bushing conductive area).
    • Lug material: T2 copper (>99.9% Cu, electrolytic, molded, annealed). Tin or silver plating.
    • Washer: Large surface, ≥3mm thick to ensure good pressure contact.

2.2.2 ​Select Soft-Material T-Body Connectors to Ease Installation:
EPDM or rigid plastic/rubber T-bodies are hard/brittle, difficult to adjust during installation (especially large cores/stress cones/insulation), and hard to verify positioning. Poor elasticity/radial force risks long-term interface separation and tracking.

  • Solution:​ Choose ​Silicone Rubber​ T-body connectors for common tank RMUs. Benefits: Soft, elastic → easy positioning adjustment; Excellent radial force and uniformity → good sealing, prevents tracking; Sufficient mechanical strength for RMU chambers.

2.3 Site Installation Practices

2.3.1 ​Secure Cable Entry Point:
Secure the three-core cable entering the RMU ​directly below the HV bushings​ using a cable clamp. Avoid tilting or unsupported cable entry. Unsecured cables impose torsional/pulling forces, potentially compromising bushing/seal integrity → SF₆ leakage, bushing cracks, HV faults.

  • Position cores vertically and symmetrically; minimize twisting.
  • Place the branch glove and cable clamp as low as possible (≥750mm vertical distance from bushings).
  • Site Process:​ After pulling cable through foundation into chamber, cut off any damaged cable end. Verify phase sequence. Align cable entry angle so cores are straight towards bushings. If angle is excessive, retract cable to trench/pit, correct angle, then re-insert and clamp firmly. ​Double-fixing:​ Where possible, add a second clamp point (e.g., fixing beam in cable pit below) to secure the outer sheath further.

2.3.2 ​Cable Phase Separation and Preparation:

  1. Fix cable branch glove using clamp before trimming core lengths.
  2. Align B phase with B bushing.
  3. Slightly bend A/C phases outward at the root before vertically aligning them with their bushings.
  4. Place termination bolt into bushing, hang lug loosely on it.
  5. Cut core ends to exact required length after verifying alignment.
  • Crucial:​ ​Fix cable before final trimming.​ Failure to do so results in inconsistent core lengths → bushing stress and poor contact.
  • Peeling/Cleaning Process:
    • Follow T-body manufacturer's peeling dimensions exactly.
    • Avoid damaging inner layers while peeling outer layers.
    • Absolutely prevent longitudinal scratches on core insulation → prevents internal tracking.
    • Use manufacturer-supplied cleaning paper. Avoid other solvents like industrial alcohol.
    • Use polyfluoroether-based lubricant (compatible with silicone rubber). Avoid silicone grease → mutual dissolution → interface drying → tracking risk.

2.3.3 ​Stress Cone Installation:

  • Ensure stress cone matches cable size → correct interference fit. Too tight: hard install, risk splitting. Too loose: poor sealing, risk surface discharge.
  • Position strictly per T-body manufacturer’s instructions (positions relative to insulation and cable core affect stress control/sealing). Minimal tolerance.
  • Position stress cone on the vertical section of the cable if possible → ensures best seal.
  • Prevent sharp objects from scratching silicone rubber surfaces.
  • Apply uniform coating of compatible lubricant on interference fit surfaces.

2.3.4 ​Ensure Sufficient Conductor Contact Area:
Conductor connection inside the insulation sleeve is invisible/hard to check. Must ensure:

  • Lug surface is parallel to bushing conductive surface → minimized stress on bushing.
  • Excellent contact​ to prevent heating.
  • Crimping:​ Crimp lug to core per procedure. Ensure lug face orientation is parallel to bushing plane. After crimp dies close fully, hold pressure for 10-15 seconds. Deburr surfaces. Clean lug and core insulation.
  • Connection:​ Place lug onto bolt, push T-body into bushing → ensure parallel lug-to-bushing contact before tightening.

2.3.5 ​Ensure Reliable Grounding:
Shielded T-body connectors must be properly earthed using dedicated grounding rings/wires connected to the RMU ground grid. Failure risks:Static charge build-up on surface → shock hazard.

Surface discharge to nearby ground → material electrical erosion.

2.4 Requirements for RMU Civil Foundation

  • RMU base typically 300-500mm above ground level.
  • Cable pit depth below base should be ≥800mm; strive for ​1000mm​ if site permits.
  • Purpose:​ Provides adequate bending radius for cable entry (especially large sections), allowing near-vertical entry → reduces stress on cable/connection.
08/13/2025
Tambayar Da Yawanci
Engineering
Gwamnati na IEE-Business a Soluci Don Zama da Turuwa na Kashi da Karamin Rabi Don Jibohi Masu Yawanci
Afikaka​Bayanin da ake bayar ya nuna hanyoyi mai yawa na tattalin arziki na kayayyakin jirgin saman, tattalin kawo sararin jirgin saman, tattalin cika abinci da tattalin kudin ruwa. Tana ce ta gane muhimmanci da ke kan al'umma da suka fi shiga, tare da masu iya daidai, tattalin kawo sararin jirgin saman, tattalin cika abinci da tattalin kudin ruwa. Hanyoyin ya yi nasara da tattalin "kawo sararin jirgin saman - cika abinci - kudin ruwa", an yi hanyoyin da zai iya daidai, tattalin da za'a da lafiy
Engineering
Akwụkwọ Nri-ọnụ Na Nri-ekpere Etiti Site Fuzzy-PID Control maka Ihe Nrite Onye Ịkwalite Akụ na MPPT
Anci​Na proposal yana nuna aiki mai tattalin kasa na gida da zafi a cikin teknologi mai kontrol mai zurfi, da yake maimaita masu aiki da al'amuran mutane da ke juyin wurare da ma'aikata masu sauki. Kafin aikinsa yana cikin sistema mai kontrol mai zurfi da take a kan ATmega16 microprocessor. Wannan sistema yana yi Maximum Power Point Tracking (MPPT) don kasa da zafi, da kuma amfani da alhakin da ya haɗa PID da fuzzy control don iya shirya da al'adu tsari ga battery. Saboda haka, yana ƙara tsari t
Engineering
Kọ̀-ẹ̀kọ̀ Soluṣọn Ẹ̀ka-Awọn Arẹ̀ Ọ̀kan: Buck-Boost Converter & Smart Charging Jẹ́ Ẹ̀kọ̀ Fún Ìpínlé Síṣe
Abstrak​Solusi ini mengusulkan sistem pembangkit listrik hibrid angin-surya berdaya tinggi yang inovatif. Menangani kekurangan inti dalam teknologi yang ada seperti efisiensi penggunaan energi rendah, umur baterai pendek, dan stabilitas sistem buruk, sistem ini menggunakan konverter DC/DC buck-boost sepenuhnya digital, teknologi paralel interleave, dan algoritma pengisian tiga tahap cerdas. Ini memungkinkan pelacakan titik daya maksimum (MPPT) pada rentang kecepatan angin dan radiasi surya yang
Engineering
Sistema ɗin Tsohon Karamin Hawa da Karamin Rana na Gaba: Wani Bayanin Inganci na Kirkiro wanda Yake Daidai Don Iyakokin Mai Tsarki
Magana da Hanyar1.1 Dangantaka na Tattalin Kashi da TuranciTattalin kashi da turanci na PV ko tattalin kashi da hawa na musamman suna da dangantaka. Tattalin kashi da PV yana jin dadin da ya shafi gurbin ranar da kuma harsuna, wanda tattalin kashi da hawa ke amfani da kayan hawa mai yawa, wanda ke samu karfin da ya shafi da aiki. Don haka don in ba da aiki mai tsawo, an bukata sabon bayanai masu kyau don inganta da zama. Amma, batari da take yi aiki da dace-dace suna da kyau a matsayin cikakken