• AC load bank 3KW-5MW
AC load bank 3KW-5MW
discuss personally
Model
DRLB-200
DRLB-150
DRLB-120
DRLB-100
DRLB-20
DRLB-10
DRLB-5
DRLB-3
Basic info
Brand Wone
Model NO. AC load bank 3KW-5MW
Power 5KW
Series DRLB
Product Detail

Description

  • It is used for the detection and maintenance of AC power supply equipment, performance testing of various switches and contactors, loading,
    burn-in, simulated load test, etc.

  • Power Range: 1kW-5MW (others on request).

  • Current Range: 0.1A-15000A.

  • Working Voltage Range: single phase, 3 phases, or custom requests.

  • Multiple safety protection functions : short circuit, over-current, over voltage, over-load, over temperature, fan fault, audible and visual alarm
     device, etc.

  • It can be designed with RS232 and RS485 to connect with PC for remotecontrol.

  • Forced air cooling and water cooled are available.

  • Production Time :3-4 weeks
    Widely used in test equipment, such as generator load, charging pile test,inverter power supply, data center test, server room load test, UPS, etc.


Parameter

Dimensions (mm)
Power L±5 W±5 H±5 h±5
3KW 580 380
250
70
5KW 680 380 250 70
6KW 680 450 250 70
8KW 450
500 700
70
10KW 500 500 800 100
15KW 500 550 800 100
20KW 600
600 800 100
25KW 600 650 800 100
30KW 600 650 1000
100
40KW 680
680
1100 100
50KW 680 680 1200 100
60KW 850
850
1200 100
80KW 850 850 1300
150
100KW 850
850 1400 150
120KW 900 850 1400 150
150KW 900 850 1500
150
200KW 1000
850 1500 150
300KW 1400 1200 1650 150
400KW 1500 1200 1800
150
500KW 1500
1400 1800 150
600KW 1500 1500 1800 150
800KW 1800 1500 1900
150
1000KW 2000
1500 1900 150
1200KW 2000 1600
1900 150
1500KW 2200 1600 1900 150
2000KW 2400 1800
2000
150



Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Ensuring Reliability: A Deep Dive into Transformer Maintenance
Ensuring Reliability: A Deep Dive into Transformer Maintenance
IntroductionElectric transformers are the backbone of modern power distribution systems, silently enabling the reliable delivery of electricity to homes, businesses, and industries. As these critical assets age and the demand for uninterrupted power grows, the importance of diligent transformer maintenance has never been greater. This essay explores the essential role of transformer maintenance, highlighting the value of proactive care, the impact of advanced diagnostic technologies, and the tra
Vziman
09/03/2025
How does a transformer work?
How does a transformer work?
Transformer Operation PrincipleA transformer is an electrical device that operates on the principle of electromagnetic induction to transfer electrical energy from one circuit to another. It enables the adjustment of voltage levels within an alternating current (AC) system, either stepping up (increasing) or stepping down (decreasing) voltage while maintaining the same frequency.Working Principle:Basic ComponentsA transformer consists of two coils, known as windings—the "primary winding" connect
Rockwell
09/03/2025
Constant testing of high-voltage cable lines
Constant testing of high-voltage cable lines
1. Definition of High-Voltage Cable Line Constant TestingHigh-voltage cable line constant testing refers to the systematic measurement, using specialized instruments, of electrical parameters such as resistance, inductance, capacitance, and conductance before a cable line is commissioned or after major maintenance. The aim is to obtain fundamental data characterizing the electromagnetic properties of the cable, serving as a critical testing phase that provides accurate parameter support for powe
Oliver Watts
09/03/2025
Technical Analysis of 220 kV High-Voltage Cable Construction in Winter
Technical Analysis of 220 kV High-Voltage Cable Construction in Winter
1.Work Environment Requirements and Safeguard MeasuresBased on technical requirements for cable equipment storage, laying, transportation, laying, transposition, testing, and cable terminations, the project owner and construction units have conducted extensive trials and implemented protective measures regarding ambient temperature, humidity, bending radius, traction control, and route optimization. These measures ensure high-voltage cable quality and on-site safety under harsh winter conditions
James
09/03/2025
Withstand voltage test of high-voltage cables
Withstand voltage test of high-voltage cables
Withstand voltage test is an insulation test, but it is a destructive test that can reveal insulation defects difficult to detect in non-destructive testing.The test cycle for high-voltage cables is three years, and it must be conducted after non-destructive tests. In other words, the withstand voltage test is performed only after all non-destructive tests have been passed.Most high-voltage cables used today are cross-linked polyethylene (XLPE) cables, which can have large cross-sections and cov
Oliver Watts
09/03/2025
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
I. Introduction to Cable Grounding Loop CurrentCables rated 110 kV and above use a single-core structure. The alternating magnetic field generated by the operating current induces a voltage on the metallic sheath. If the sheath forms a closed circuit through the earth, a grounding loop current will flow on the metallic sheath. Excessive grounding loop current (loop current exceeding 50 A, more than 20% of the load current, or a ratio of maximum-to-minimum phase current greater than 3) not only a
Felix Spark
09/03/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!