Minor inspection list for gas insulated switchgear GIS

Edwiin
Field: Power switch
China

This inspection of GIS components can typically be carried out every 5 - 10 years. However, its frequency can also hinge on the number of operations of switching devices and the manufacturer's recommendations. The overarching aim is to verify the proper functioning of all switching devices. To this end, the relevant equipment must be de - energized.

GIS manufacturers furnish users with recommended maintenance plans, which should be scrupulously adhered to. The typical operations during this inspection are as follows:

  • Check the SF6 pressures (density).

  • Examine the operations of SF6 density relays, including wiring and alarms.

  • Verify the purity of SF6 gas.

  • Assess the content of SF6 by - products and impurities (such as SO2 and moisture, in compartments lacking absorbers).

  • Detect any SF6 leakages (especially in the event of alarms since the last inspection).

  • Record and review the operating times of circuit breakers (using auxiliary switches).

  • Operate the circuit breakers and switching devices.

  • Check the correct operation of pressure switches, applicable when hydraulic mechanisms are in use.

  • Inspect the proper alignment and operation of position indicators.

  • Verify the control and alarm functions.

Give a tip and encourage the author!

Recommended

Main Transformer Accidents and Light Gas Operation Issues
1. Accident Record (March 19, 2019)At 16:13 on March 19, 2019, the monitoring background reported a light gas action of No. 3 main transformer. In accordance with the Code for Operation of Power Transformers (DL/T572-2010), operation and maintenance (O&M) personnel inspected the on-site condition of No. 3 main transformer.On-site confirmation: The WBH non-electrical protection panel of No. 3 main transformer reported a Phase B light gas action of the transformer body, and the reset was ineff
02/05/2026
Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
Related Products
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.