The temperature rise test is a crucial test for generator circuit breakers to verify their current - carrying capacity. In this test, the maximum test current can reach as high as 35 kA to simulate the real operating environment. The test sample is a complete three - phase installation, but the test is only conducted on a single phase. The air temperature can be adjusted using cooling water.
The implementation of this test mainly focuses on the following three aspects, and the layout of the experimental site is shown in the figure. The following points should be noted during this test:

1.Attention to the Test Loop and Sample Resistance under High - Current Testing
Under high - current test conditions, it is essential to pay close attention to the test loop and the resistance of the sample. To avoid excessive voltage drops, it is necessary to reduce the current - carrying capacity of the connecting cables, select test equipment with appropriate capacities, and enhance the port voltage output capacity.

2. Appropriate Layout of the Test Loop
Using an appropriate test loop layout can effectively reduce the total power - frequency electrical impedance during operation. It can also prevent issues such as the skin effect, hysteresis losses, and heat generation in the test circuit body caused by multi - wire connections, which could otherwise affect the normal progress of the temperature rise test.

3. Temperature Adjustment under Forced Air - Cooling Test Conditions
Under forced air - cooling test conditions, since the adjustment of the wind temperature is achieved through heat exchange with the water temperature, there is a time lag. Therefore, adjustments should be made based on the temperature limits. It is necessary to make slow adjustments within the allowable temperature range to ensure accurate control of the test environment.

Give a tip and encourage the author!
Recommended
PT Fuse Slow Blow: Causes, Detection & Prevention
PT Fuse Slow Blow: Causes, Detection & Prevention
I. Fuse Structure and Root Cause AnalysisSlow Fuse Blowing:From the design principle of fuses, when a large fault current passes through the fuse element, due to the metal effect (certain refractory metals become fusible under specific alloy conditions), the fuse first melts at the soldered tin ball. The arc then rapidly vaporizes the entire fuse element. The resulting arc is quickly extinguished by quartz sand.However, due to harsh operating environments, the fuse element may age under the comb
Edwiin
10/24/2025
Why Fuses Blow: Overload, Short Circuit & Surge Causes
Why Fuses Blow: Overload, Short Circuit & Surge Causes
Common Causes of Fuse BlowingCommon reasons for fuse blowing include voltage fluctuations, short circuits, lightning strikes during storms, and current overloads. These conditions can easily cause the fuse element to melt.A fuse is an electrical device that interrupts the circuit by melting its fusible element due to heat generated when current exceeds a specified value. It operates on the principle that, after an overcurrent persists for a certain period, the heat produced by the current melts
Echo
10/24/2025
Fuse Maintenance & Replacement: Safety and Best Practices
Fuse Maintenance & Replacement: Safety and Best Practices
1. Fuse MaintenanceFuses in service should be regularly inspected. The inspection includes the following items: Load current should be compatible with the rated current of the fuse element. For fuses equipped with a fuse blown indicator, check whether the indicator has actuated. Check the conductors, connection points, and the fuse itself for overheating; ensure connections are tight and making good contact. Inspect the fuse exterior for cracks, contamination, or signs of arcing/discharge. Liste
James
10/24/2025
Maintenance and Repair Items for 10kV High-Voltage Switchgear
Maintenance and Repair Items for 10kV High-Voltage Switchgear
I. Routine Maintenance and Inspection(1) Visual Inspection of Switchgear Enclosure No deformation or physical damage to the enclosure. Protective paint coating shows no severe rust, peeling, or flaking. Cabinet is securely installed, clean on the surface, and free of foreign objects. Nameplates and identification labels are neatly affixed and not falling off.(2) Check of Switchgear Operating Parameters Instruments and meters indicate normal values (comparable to typical operating data, with no s