The testing of indoor load switches should cover their entire lifecycle, focusing on four core aspects: "ensuring reliable insulation, normal mechanical operation, safe switching capability, and operational compatibility." The main testing categories include:

1. Insulation Performance Testing: Use a megohmmeter to measure insulation resistance between phases, from phase to ground, and between moving and fixed contacts (≥0.5 MΩ for low voltage, ≥1000 MΩ for high voltage). High-voltage switches require additional power-frequency withstand voltage tests (e.g., a 10kV switch withstands 42kV for 1 minute without breakdown or flashover).

2. Mechanical and Contact Testing: Perform 3–5 open/close operations to verify smooth operation without jamming and compliance with travel specifications. Measure contact resistance using a DC double-arm bridge (≤50 μΩ). Simultaneously, verify terminal tightening torque and grounding continuity (grounding resistance ≤4 Ω).

3. Operational Status Monitoring: While under load, use an infrared thermometer to measure temperature rise at terminals and contacts (≤60K, with a maximum difference of ≤10K between phases). Periodically re-measure insulation resistance (a decrease of no more than 30% compared to initial values).

4. Special Compatibility Testing: For switches equipped with fuses, simulate a fault to verify that the switch can reliably trip after the fuse blows. In humid or high-dust environments, monitor cabinet humidity and clean insulating components regularly.

Give a tip and encourage the author!
Recommended
Vacuum Circuit Breakers for Capacitor Bank Switching
Vacuum Circuit Breakers for Capacitor Bank Switching
Reactive Power Compensation and Capacitor Switching in Power SystemsReactive power compensation is an effective means to increase system operating voltage, reduce network losses, and improve system stability.Conventional Loads in Power Systems (Impedance Types): Resistance Inductive reactance Capacitive reactanceInrush Current During Capacitor EnergizationIn power system operation, capacitors are switched in to improve power factor. At the moment of closing, a large inrush current is generated.
Oliver Watts
10/18/2025
Vacuum Circuit Breaker Withstand Voltage Test Guide
Vacuum Circuit Breaker Withstand Voltage Test Guide
Insulation Withstand Voltage Test Standards for Vacuum Circuit BreakersThe main purpose of the insulation withstand voltage test for vacuum circuit breakers is to verify whether the insulation performance of the equipment under high voltage is qualified, and to prevent breakdown or flashover accidents during operation. The test process must be strictly carried out in accordance with power industry standards to ensure equipment safety and power supply reliability.Test ObjectsThe test objects incl
Garca
10/18/2025
How to Test Vacuum in Vacuum Circuit Breakers
How to Test Vacuum in Vacuum Circuit Breakers
Vacuum Integrity Testing of Circuit Breakers: A Critical Measure for Performance EvaluationVacuum integrity testing is a key method for assessing the vacuum performance of circuit breakers. This test effectively evaluates the insulation and arc-quenching capabilities of the breaker.Before testing, ensure the circuit breaker is properly installed and correctly connected. Common vacuum measurement methods include the high-frequency method and the magnetic control discharge method. The high-frequen
Oliver Watts
10/16/2025
HV Circuit Breaker Testing: Methods & Safety Tips
HV Circuit Breaker Testing: Methods & Safety Tips
High-Voltage Circuit Breaker Characteristic Tests: Methods and PrecautionsHigh-voltage circuit breaker characteristic tests mainly include mechanical performance testing, loop resistance measurement, anti-pumping function verification, and non-full-phase protection testing. Below are the detailed test procedures and key precautions.1. Pre-Test Preparation1.1 Technical Documentation ReviewReview the operating mechanism manual to understand its structure, working principle, and technical parameter
Oliver Watts
10/16/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.