Hey everyone, I’m Oliver, a 10-year veteran in the power system industry. Today we’re going to talk about a very practical topic — how do you know if a current transformer (CT) used in Air Insulated Switchgear (AIS) is truly qualified? This isn’t just about meeting technical specs; it’s directly tied to equipment safety, grid stability, and accurate metering.Let’s dive in — based on my real-world experience.

Introduction

In substations or distribution systems, current transformers play a critical role. They convert high primary currents into manageable secondary signals for measurement, protection, and control.

To ensure they perform reliably under all conditions, a series of tests must be carried out — from factory testing to on-site commissioning and long-term maintenance.

So what are those essential tests?

Let me walk you through them step by step.

Part 1: Basic Performance Testing Before Factory Delivery
(1) Insulation Resistance Test

This is one of the most fundamental — yet crucial — tests.

  • Purpose: To check whether the insulation between the primary winding, secondary winding, and housing is intact.

  • Method: Use a megohmmeter (insulation tester) to measure resistance.

  • Standard: Typically should be above 500 MΩ, though exact values depend on manufacturer specifications and standards like IEC or IEEE.

A low reading could indicate moisture ingress, aging insulation, or manufacturing defects.

(2) Power Frequency Withstand Voltage Test (Dielectric Test)

Also known as the "hi-pot" test.

  • Purpose: To verify that the CT can withstand high voltages without breakdown during normal operation or transient overvoltages.

  • Procedure: Apply a voltage several times higher than rated (e.g., 3 kV for a 1 kV-rated CT), usually for 1 minute.

  • What to Watch For: Any signs of arcing, flashover, or insulation failure.

This ensures the CT can handle electrical stress safely.

(3) Ratio Error Test

The core function of a CT is to accurately transform current.

  • Purpose: To confirm that the actual current ratio matches the nameplate value.

  • How It's Done:

    • Measure primary and secondary currents at various loads.

    • Calculate the error percentage.

  • Acceptable Range:

    • For metering CTs: ±0.5%

    • For protection CTs: ±1% or more, depending on application.

Accuracy matters — especially when billing or protection logic depends on it.

(4) Polarity Check

Polarity errors can cause serious issues, especially in differential protection circuits.

  • Purpose: To confirm the correct direction of current flow between primary and secondary windings.

  • Methods:

    • DC method: Briefly apply a DC voltage and observe the deflection on a voltmeter.

    • AC method: Use a standard CT to compare phase angles.

  • Best Practice: Always double-check after installation.

Don’t skip this — it’s easy to mess up and hard to catch later.

Part 2: Functional Testing After On-Site Installation
(1)Grounding Resistance Test

Proper grounding is essential for both safety and performance.

  • Tool: Ground resistance tester.

  • Target: Usually below 4 ohms, though stricter requirements may apply in sensitive environments.

  • Why It Matters: Poor grounding can lead to electric shock risks, equipment damage, or false tripping.

Especially important in outdoor AIS setups exposed to weather and environmental factors.

(2) Secondary Loop Continuity Test

Ensures there are no open circuits or loose connections in the secondary wiring.

  • Method: Use a multimeter to check for continuity across terminals.

  • Importance:

    • An open circuit can cause dangerously high voltages.

    • Loose connections may result in signal loss or overheating.

Never energize a CT with an open secondary!

(3) Temperature Rise Test

Overheating can degrade insulation and shorten the life of a CT.

  • Process: Run the CT at rated current for a set time and monitor temperature rise.

  • Limits: Must stay within specified thermal limits (e.g., 55K rise for Class B insulation).

  • Tools: Infrared thermography or embedded temperature sensors.

Helps identify poor contact points or inadequate cooling.

(4) Dynamic Response Test

Checks how well the CT responds to sudden changes in current, such as short circuits.

  • Method: Inject a simulated fault current and observe secondary output behavior.

  • Goal: Ensure fast, stable response for reliable protection triggering.

Crucial for applications involving relay protection systems.

Part 3: Periodic Maintenance During Long-Term Operation
(1) Partial Discharge Detection

Early signs of insulation degradation often appear as partial discharges.

  • Technique: Use ultrasonic or ultra-high frequency (UHF) sensors to detect discharge activity.

  • Frequency: At least once a year for critical systems.

  • Benefits: Early warning before major insulation failures occur.

Especially useful for aging equipment or units operating in harsh conditions.

(2) Accuracy Calibration

Over time, due to aging or environmental effects, CT accuracy may drift.

  • Approach: Remove key CTs periodically and recalibrate in a lab setting.

  • Interval: Varies by usage, but typically every 3–5 years for metering CTs.

Ensures continued compliance with standards and avoids billing disputes.

(3) Visual Inspection & Cleaning

Simple but effective.

  • Checklist:

    • Cracks or discoloration on housing

    • Corrosion on terminals

    • Dust buildup or blockage in ventilation

  • Action: Clean with dry cloth, tighten connections, replace damaged parts.

Combine with regular patrols for early detection of issues.

Final Thoughts

Testing a current transformer in air insulated switchgear isn’t something you can afford to take lightly. From basic factory checks to field commissioning and long-term monitoring — every step plays a vital role in ensuring safe, stable, and accurate operation.

Here’s a quick recap of the key tests:

If you're working with AIS CTs and have questions about any of these tests — or need help interpreting results — feel free to reach out anytime. I’d be happy to share more hands-on tips and troubleshooting techniques.

Let’s keep our CTs running strong — silently guarding our power systems behind the scenes.

— Oliver

Give a tip and encourage the author!
Recommended
How to Test Vacuum in Vacuum Circuit Breakers
How to Test Vacuum in Vacuum Circuit Breakers
Vacuum Integrity Testing of Circuit Breakers: A Critical Measure for Performance EvaluationVacuum integrity testing is a key method for assessing the vacuum performance of circuit breakers. This test effectively evaluates the insulation and arc-quenching capabilities of the breaker.Before testing, ensure the circuit breaker is properly installed and correctly connected. Common vacuum measurement methods include the high-frequency method and the magnetic control discharge method. The high-frequen
Oliver Watts
10/16/2025
Ensure Hybrid System Reliability with Full Production Testing
Ensure Hybrid System Reliability with Full Production Testing
Production Testing Procedures and Methods for Wind-Solar Hybrid SystemsTo ensure the reliability and quality of wind-solar hybrid systems, several critical tests must be conducted during production. Wind turbine testing primarily includes output characteristic testing, electrical safety testing, and environmental adaptability testing. Output characteristic testing requires measuring voltage, current, and power under varying wind speeds, plotting wind-power curves, and calculating power generatio
Oliver Watts
10/15/2025
Electrical Meter Accuracy Issues? Solutions Revealed
Electrical Meter Accuracy Issues? Solutions Revealed
Analysis of Measurement Errors in Electrical Instruments and Elimination Strategies1.Electrical Instruments and Common Testing MethodsElectrical instruments play a vital role in the generation, transmission, and utilization of electricity. As a special form of energy, electricity requires strict safety standards in production and use. Safe electricity usage is crucial to daily life, production, and socio-economic development. Power system monitoring relies on electrical instruments, which are of
Oliver Watts
10/07/2025
High-Voltage Electrical Testing: Key Safety Requirements for Field Operations
High-Voltage Electrical Testing: Key Safety Requirements for Field Operations
The test site layout must be reasonable and organized. High-voltage testing equipment should be placed close to the test object, live parts must be isolated from each other, and remain within the clear line of sight of test personnel. Operational procedures must be rigorous and systematic. Unless otherwise specified, voltage must not be suddenly applied or removed during operation. In case of abnormal conditions, voltage increase must be stopped immediately, pressure rapidly reduced, power disc
Oliver Watts
09/23/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.