• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


36/38kV Indoor vacuum circuit breaker with servomotor actuation and controlled switching

  • 36/38kV Indoor vacuum circuit breaker with servomotor actuation and controlled switching

Key attributes

Brand ABB
Model NO. 36/38kV Indoor vacuum circuit breaker with servomotor actuation and controlled switching
Rated voltage 38kV
Rated normal current 2500A
Rated frequency 50/60Hz
Series VD4-AF1

Product descriptions from the supplier

Description

Description:

 ABB offers its new vacuum circuit breaker with servomotor actuation and controlled switching technology up to 38kV, 2500A, 31.5kA and up to 150,000 operations with extremely low inrush, to support your business needs for diverse installations like steel industries applications.

Feature:

 Protect your assets 
•    Enables increased lifespan of transformers by more than 10% in e.g. 3 years 
•    Reduction of hazards due to improved protection range 
•    Up to 5-to-10-times higher endurance performance than the market standard

Maximize your output 
•    Reduced total cost due to elimination of downtime for breaker overhaul and a lifespan 5 times the market standard, with predictive health indication 
•    Reduced compensation losses up to 10% while increasing power quality 
•    Fast and reliable support thanks to ABB’s global footprint

 Optimize your investment  

  • Elimination of inrush limiting reactors and resistances, leading to significant cost and space savings 

  • Cost saving by as much as 20%, using same ratings, same interfaces of existing MV substation thanks to optimized footprint equivalent to standard distribution breakers

 Technical Characteristics:

Type tested according to IEC 62271-100

Technical Characteristics of sensor  :

Type tested according to IEC 60044-7

 

Documentation Resource Library
Public.
36/38kV vacuum circuit breaker with servomotor actuation and controlled switching
Catalogue
English
FAQ
Q: What are the precautions for installing indoor vacuum circuit breakers?
A: Ensure the installation environment is dry, free of corrosive gases, and well-ventilated (meeting the IP4X protection class requirements). Check that the dimensions of the switchgear cabinet match those of the circuit breaker (e.g., withdrawable types need to be compatible with the switchgear rails), and fasten the connection terminals securely to prevent loosening and overheating. The insulation distance of the primary circuit must meet the standards (e.g., for 12kV products, the phase-to-phase and phase-to-ground clearances shall be ≥125mm).
Q: What are the differences between indoor vacuum circuit breakers and SF₆ circuit breakers?
A: Arc-quenching medium: Vacuum circuit breakers use vacuum for arc quenching (environmentally friendly, no greenhouse gases), while SF₆ circuit breakers use SF₆ gas (requiring attention to gas leakage and environmental treatment). Volume and maintenance: Vacuum circuit breakers are smaller in size and have a longer maintenance cycle (the maintenance-free cycle can reach 10 years); SF₆ circuit breakers require regular detection of gas pressure.
Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 20000m² Total staff: Highest Annual Export(usD): 580000000
Workplace: 20000m²
Total staff:
Highest Annual Export(usD): 580000000
Services
Business Type: Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding Electrodes
    Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding ElectrodesWhen the grounding electrode of an Ultra-High-Voltage Direct Current (UHVDC) transmission system is located close to a renewable energy power station, the return current flowing through the earth can cause a rise in ground potential around the electrode area. This ground potential rise leads to a shift in the neutral-point potential of nearby power transformers, inducing DC bias (or DC offset) in their
    01/15/2026
  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025

Related Solutions

  • Electrical House (eHouse) Solutions
    Reduce site complexity, improve lead timeABB eHouses are prefabricated transportable substations, designed to house medium voltage and low voltage switchgear, critical power equipment and automation cabinets.An eHouse solution is a cost effective, risk reduced alternative to conventional concrete block and brick construction. Each eHouse module is custom engineered to meet application requirements with respect to equipment layout, site footprint limitations and logistics considerations.Installat
    04/16/2025
  • Improve speed to deployment Modular prefabricated and pre-engineered solutions
    Reduce site works and risk of schedule delays and cost overrunsOverview:With a complicated data center project that has short delivery timelines, prefabricated modular solutions and pre-engineered modular solutions may be the answer.Modular solutions are ideal for enterprise, colocation, edge and cloud data centers, where project replicability and expandability are critical, alongside fast deployment time.Reduce risk by leveraging prefabricated and integrated solutions:Fast track projects with p
    04/16/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.