What Is a Power System Bushing and Its Types for Transformers?

Edwiin
Edwiin
Field: Power switch
China

In electrical power systems, a bushing is an insulating device that allows an electrical conductor to pass safely through a grounded conductive barrier, as in the case of transformers or circuit breakers. All transformer windings are connected to high-voltage lines, so special attention must be paid to the terminal connections to prevent flashover between the high-voltage terminals and the transformer body. In low-voltage distribution transformers, cable connections are made within a terminal box on the secondary side.

However, in power transformers, both sides operate at high voltage, necessitating specially designed devices known as bushings. A bushing typically consists of a central current-carrying conductor (a rod, busbar, or cable) and a porcelain housing mounted in the opening of the transformer cover, which insulates the live part. The simplest type is a molded high-quality glazed porcelain insulator with a central conductor. This type is used for voltages up to 33 kV and features a smooth or slightly ribbed surface for indoor applications.

For outdoor transformers, the external (upper) part of the bushing includes sheds to protect the lower ribs from water during rain. For transformers operating above 36 kV, oil-filled or capacitor-type bushings are used. An oil-filled bushing consists of a hollow, two-part porcelain cylinder with a conductor passing through its axis. The space between the conductor and the inner surface of the porcelain is filled with oil, which is separate from the oil in the transformer tank. The top of the bushing connects to a small expansion chamber to accommodate volume changes due to oil temperature variations. Provision is made at the lower end for current transformers, allowing the bushing to be removed without disturbing the current transformer.

A capacitor bushing is constructed with layers of synthetic resin-bonded paper interleaved with thin metallic foils impregnated with conductive material. This forms a series of capacitors, where each pair of metal foils and the intervening resin-bonded paper cylinder acts as a capacitor. By varying the length of the metallic foils and the thickness of the resin-bonded paper layers, the dielectric stress is evenly distributed across the radial depth—i.e., along the radius of the bushing.

Give a tip and encourage the author!
Recommended
Why does a 2-in 4-out 10 kV solid-insulated ring main unit have two incoming feeder cabinets?
Why does a 2-in 4-out 10 kV solid-insulated ring main unit have two incoming feeder cabinets?
A "2-in 4-out 10 kVsolid-insulated ring main unit" refers to a specific type of ring main unit (RMU). The term "2-in 4-out" indicates that this RMU has two incoming feeders and four outgoing feeders.10 kVsolid-insulated ring main unit are equipment used in medium-voltage power distribution systems, primarily installed in substations, distribution stations, and transformer stations to distribute high-voltage power to low-voltage distribution networks. They generally consist of high-voltage incomi
Garca
12/10/2025
What Is a Magnetic Levitation Transformer? Uses & Future
What Is a Magnetic Levitation Transformer? Uses & Future
In today’s rapidly advancing technological era, the efficient transmission and conversion of electric power have become continuous goals pursued across various industries. Magnetic levitation transformers, as an emerging type of electrical equipment, are gradually demonstrating their unique advantages and broad application potential. This article will thoroughly explore the application fields of magnetic levitation transformers, analyze their technical characteristics and future development tren
Baker
12/09/2025
How Often Should Transformers Be Overhauled?
How Often Should Transformers Be Overhauled?
1. Transformer Major Overhaul Cycle The main transformer shall undergo a core-lifting inspection before being put into service, and thereafter a core-lifting overhaul shall be performed every 5 to 10 years. Core-lifting overhaul shall also be carried out if a fault occurs during operation or if issues are identified during preventive tests. Distribution transformers operating continuously under normal load conditions may be overhauled once every 10 years. For on-load tap-changing transformers, t
Felix Spark
12/09/2025
Low-Voltage Distribution Lines and Power Distribution Requirements for Construction Sites
Low-Voltage Distribution Lines and Power Distribution Requirements for Construction Sites
Low-voltage distribution lines refer to the circuits that, through a distribution transformer, step down the high voltage of 10 kV to the 380/220 V level—i.e., the low-voltage lines running from the substation to the end-use equipment.Low-voltage distribution lines should be considered during the design phase of substation wiring configurations. In factories, for workshops with relatively high power demand, dedicated workshop substations are often installed, where transformers supply power direc
James
12/09/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.