Electrical Room Power-On Safety Operation Guide

Echo
Field: Transformer Analysis
China

Power Supply Procedure for Low-Voltage Electrical Rooms

I. Pre-Power-On Preparations

  • Clean the electrical room thoroughly; remove all debris from switchgear and transformers, and secure all covers.

  • Inspect busbars and cable connections inside transformers and switchgear; ensure all screws are tightened. Live parts must maintain adequate safety clearance from cabinet enclosures and between phases.

  • Test all safety equipment before energizing; use only calibrated measuring instruments. Prepare fire-fighting equipment and necessary warning signs (e.g., "Danger", "Do Not Close").

  • Verify that grounding and bonding systems are intact and reliable.

  • Check secondary wiring in switchgear for correctness and ensure all terminals are securely tightened.

  • Set protective relay settings for all equipment according to the electrical system drawings.

II. Power-On Procedure

  • Open the grounding switch of the transformer cubicle in the 10kV switchroom, then insert the circuit breaker trolley into position.

  • Close the load switch in the high-voltage incoming line isolation cubicle.

  • Press the transformer closing button to perform five inrush energizations, with a 5-minute interval between each.

  • Sequentially insert and close each low-voltage switchgear drawer unit. Use a multimeter to verify normal voltage and confirm no abnormalities in all low-voltage cabinets.

  • After all equipment is energized, operate under load for 24 hours for observation and testing.

Give a tip and encourage the author!

Recommended

Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
HECI GCB for Generators – Fast SF6 Circuit Breaker
1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
01/06/2026
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.