Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Construction technology for the expansion and renovation of the 500 kV GIS operation area
The 500 kV GIS system of Lianghekou Hydropower Station is composed of circuit breakers, disconnectors, earthing switches, bus - pipes, current transformers (CTs), potential transformers (PTs), arresters, etc. It has a total of 12 circuit - breaker bays, adopting an indoor structure and a "Z" - shaped layout, with 6 incoming lines and 2 outgoing lines, and using 4/3 and 3/2 wiring schemes. To meet the access of the Kela Photovoltaic project in the first - phase hydro - photovoltaic complementary
05/24/2025
Consult
Tip
Consult
Tip
Research on the Installation Technology of GIS Equipment in the Construction of 110 kV Substation
Gas Insulated Switchgear (GIS) consists of circuit breakers, disconnectors, earthing switches, current transformers, voltage transformers, surge arresters, busbars, connectors, and outlet terminals. With higher reliability, safety, and relatively small space occupation, it is widely used in the design and construction of high - voltage substations. In urban and densely - populated areas, GIS is the preferred choice due to its compact structure and excellent insulation performance.However, 110 kV
05/23/2025
Consult
Tip
Consult
Tip
Discussion on the Problem of Gas Liquefaction during the Installation of Tank Circuit Breakers in Severe Cold Regions
Technical Explanation of Sulfur Hexafluoride (SF₆) Circuit Breakers and Gas Liquefaction ChallengesSF₆ circuit breakers, which use sulfur hexafluoride gas—known for its excellent arc-quenching and insulating properties—as the arc-extinguishing medium, are widely applied in power systems. These breakers are suitable for frequent operations and scenarios requiring high-speed interruption. In China, SF₆ circuit breakers are basically used for voltage levels of 110kV and above. H
05/21/2025
Consult
Tip
Consult
Tip
A simplified configuration of wind turbines equipped with American-style box-type transformers
Wind power generation, as a renewable and clean energy source, has relatively mature technology and has witnessed rapid development in China in recent years. It is estimated that by 2010, the total installed capacity will reach 1.8×10⁴ MW. Wind power generation is characterized by a short construction period, quick results, and the most cost - effective advantages. Typically, it takes only about one year to build a 50 - MW wind farm. After completion, the operation cost is low, and the
05/15/2025
Consult
Tip
Consult
Tip
Installation Measures for Prefabricated U - shaped Concrete Cable Tunnels in Substations
1. IntroductionCurrently, with the rapid development of the economy and science and technology, and the increasing intelligence of the informatization level, the construction of substations is also becoming more and more intelligent. Among them, cable tunnels are an important means for substations to achieve intelligence. Therefore, in practical applications, higher technical and quality requirements are needed. For example, to meet the needs of complex signal transmission, the cable tunnels in
04/28/2025
Consult
Tip
Consult
Tip
Protection of the operating mechanism of outdoor vacuum circuit breakers
In recent years, medium-voltage vacuum circuit breakers have witnessed substantial development and achieved remarkable results, especially in the 12 kV voltage class, where vacuum circuit breakers hold an absolute advantage. Currently, the operating mechanisms commonly equipped with 12 kV outdoor vacuum circuit breakers are mostly spring operating mechanisms.At present, outdoor vacuum circuit breaker products often focus on the design and protection of the main circuit of the circuit breaker whi
04/21/2025
Consult
Tip
Consult
Tip
Installation and Debugging of Vacuum Circuit Breaker
Installation Requirements All parts and components must pass inspection before installation. Work - position tools and equipment used for installation must be clean and meet assembly requirements. When tightening fasteners, use fixed wrenches, box wrenches, or socket wrenches. Do not use adjustable wrenches when tightening screws near the arc - extinguishing chamber. The installation sequence should comply with the installation process regulations, and the specifications of fasteners for each co
04/19/2025
Consult
Tip
Consult
Tip
Installation of Distribution-to-Utilization Voltage Transformers
A. Aerial MountingA1. Unit Capacities, Mounting Methods, and TypesFor aerial transformer installations, three - phase units or banked single - phase units can be used. Transformers, whether single or in banks, with an individual unit or combined capacity greater than 300 kVA shall not be mounted on a single wooden pole. Special structural considerations are required for single - pole installations with a capacity greater than 100 kVA.Pole - platform mounting (two - pole structure) will not be us
04/14/2025
Consult
Tip
Consult
Tip
Selecting Energy Efficient Distribution Transformers
Definition of Transformer LossesTransformer losses can be mainly categorized into two types: no - load losses and load losses. These losses are ubiquitous across all types of transformers, irrespective of their application scenarios or power ratings.However, there are two additional types of losses: extra losses induced by harmonics, and losses that are especially relevant for larger transformers – cooling or auxiliary losses, which result from the use of cooling equipment such as fans
04/12/2025
Consult
Tip
Consult
Tip
Selection of distribution transformers for supplying power to LV networks
The characteristic data of distribution transformers are dictated by the requirements of the network. The determined effective power must be multiplied by the power factor cosφ to obtain the rated power Srt. In distribution networks, a value of uk = 6% is commonly preferred.Selection of Distribution Transformers for Supplying Power to LV NetworksTransformer losses consist of no - load losses and short - circuit losses. No - load losses stem from the continuous reversal of magnetization i
04/11/2025
Consult
Tip
Consult
Tip
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.