Minamahon ang Total Cost of Ownership (TCO) sa buong 30-taong siklo ng ekwipo. Hinuhubaran kini pinaagi sa sistemang pag-optimize sa disenyo ug mga estratehiya sa intelligent operation & maintenance (O&M), na epektibong naga-balance sa unang investment ug long-term operational expenditures.
I. Core Cost Optimization Strategies
- Design & Simulation Optimization
- Gamiton ang software para sa electric field simulation (e.g., ANSYS, COMSOL) aron mas precise nga makalkula ang creepage distance ug mechanical strength sa insulator. Optimize ang taas, profile, ug thickness sa insulator. Bawasan ang redundant materials habang sumala sa IEC/CNS standards, mabawasan ang cost sa raw material tungod niini sa 15%-20%.
- Performance Uncompromised: Ang optimized designs full na mogapit sa tanang type tests, kasagaran sa power frequency withstand, lightning impulse, ug pollution tests.
- Insulator Selection Strategy
- Medium Pollution Areas (ESDD ≤ 0.1mg/cm²): Gamiton ang composite insulators (silicone rubber material) aron molihok sa tradisyonal nga porcelain insulators:
✓ Nagbawas sa weight ngadto sa 40% → Mabawasan ang cost sa transport ug installation.
✓ Ang hydrophobicity nagdelay sa pollution flashover → Mabawasan ang frequency sa cleaning.
✓ Naka-enhance ang resistance kontra sa crack → Na-avoid ang unplanned replacements tungod sa breakage sa porcelain.
Nag-increase ang cost-effectiveness sa over 30% konpare sa tradisyonal nga porcelain.
II. Key Technologies for O&M Cost Control
- Maintenance-Minimized Structural Design
- Core-Lifting Free Design: Ang sealed oil tank gamiton ang bellows-type expansion device + dual sealing rings, na walay pangangailangan og core-lifting maintenance sa 30 years. Na-avoid ang traditional core-lifting costs (≈ $5,000/instance) ug outage losses.
- Modular Desiccant Unit: Respirator desiccant mahimong palitan on-site quick (< 30 minutes), wala na gikinahanglan og special equipment. Nagbawas sa O&M costs sa 70%.
- Intelligent Condition Monitoring
- Integrated Monitoring Interfaces: Pre-wired interfaces para sa oil pressure/moisture/oil level sensors (IEC 61850 compliant), suportado ang integration sa SCADA systems.
- Basic Configuration: Standard mechanical oil gauge, pressure gauge, ug moisture indicator para sa "visual" rapid diagnostics.
- Benefits: Naghatag og early warning sa insulation degradation, nagbawas sa unplanned outages sa ≥90% ug nagbawas sa fault repair costs sa 50%.
III. Long-Term Energy Savings & Reliability Assurance
|
Technical Measures
|
TCO Contribution
|
|
Low-loss Supermalloy Core
|
No-load loss nagbawas sa 40% konpare sa national standards. 30-year energy savings nakabalhin sa initial investment premium.
|
|
High-Reliability Branded Components
|
MTBF ≥ 500,000 hours. Nagbawas sa fault replacement costs ug outage losses ($100k+/instance).
|
IV. TCO Quantification Model (Example)
Assume a 220kV VT project:
TCO = Procurement Cost + Σ(t=1 to 30) [Annual O&M Cost / (1+r)^t] + Outage Loss Costs
(Where r = Discount Rate)
Key Parameters:
- Energy Savings: Low-loss design nag-save og ≈ 1,200 kWh/year (≈$600/year).
- Reliability Gain: High-reliability brand nag-siguro nga fault rate ≤ 0.2% → Nagbawas sa outage losses sa $500k sa 30 years.
Result: Investment payback period < 8 years. Total lifecycle cost nagbawas sa 18%-25%.
Summary
Kini nga solusyon gigamit og apat ka pillars – design-source cost reduction (material optimization), O&M structural innovation (core-lifting free + modularity), continuous energy consumption control (low-loss core), ug fault prevention system (condition monitoring + high reliability) – aron mapugos ang total lifecycle cost sa outdoor VTs/PTs sa over 20%, samtang sigurado ang safety ug reliability. Ito naghatag sa power grid enterprises og economically proven solution validated sa 30 years.
Reference Standards: IEC 60044-2, GB/T 20840.2, CIGRE TB 583