
Sa modernong power grids, partikular sa mga substation sa mga power plant ug dako nga industrial parks, ang parallel operation sa daghang transformers o generators gigamit aron mopadako ang reliability sa power supply ug energy efficiency. Apan, kini nagresulta sa sharp na pagtaas sa short-circuit current levels, kasagaran nagsobra sa rated withstand capacity (e.g., dynamic/thermal withstand current) sa existing equipment sama sa switchgear, circuit breakers, ug transformers.
Ang traditional solutions mibati og significant challenges:
II. Solution: Core Application Value of the Ultra-Fast Current Limiter (FCL)
Ang Ultra-Fast Current Limiter (FCL) nga gihatag kaniadtong solution kini usa ka intelligent device batas sa parallel configuration sa "fast switch" ug "current-limiting fuse." Giaddress niya ang giingong challenges, ang iyang core application value nakita sa "millisecond-level breaking" ug "full lifecycle economic benefits."
Core Application Advantages:
III. Typical Application Scenarios and Solutions
|
Application Scenario |
Core Problem |
FCL Solution |
|
1. Bus Sectionalizing / Transformer Parallel Operation |
Parallel operation sa multiple transformers nagresulta sa short-circuit current nga sobra sa levels under single transformer operation, surpassing the withstand limit sa switchgear (e.g., cabinet withstands 2Ik, 4 parallel units can reach 4Ik). |
Install FCL sa bus sectionalizing point (e.g., between sections 1-2 ug 3-4). Ensures bus tie during normal operation; rapidly breaks during faults, limiting short-circuit current to an acceptable system level without replacing switchgear. |
|
2. Bypassing Current Limiting Reactors |
Existing reactors nagresulta sa high energy consumption ug voltage drop during long-term operation. |
Connect the FCL in parallel with the reactor. During normal operation, the FCL conducts, bypassing the reactor for zero loss ug zero voltage drop; during a short circuit, the FCL breaks, transferring current to the reactor for limiting. |
|
3. Grid and Captive Power Source Connection Point |
Commissioning sa captive generators within an enterprise nagresulta sa short-circuit current sa Point of Common Coupling (PCC) nga sobra sa limits, threatening upstream grid equipment. |
Installing an FCL sa connection point ang tanging reasonable solution. Directional protection functionality ma-add-on aron ensure operation only for grid-side faults, avoiding maloperation. |
|
4. Power Plant or Large Factory Feeders |
The large short-circuit capacity sa auxiliary power systems makes it difficult for outgoing feeder equipment to withstand. |
Install FCLs on feeder circuits sa generator or transformer outlet aron provide top-level protection for downstream switchgear, enhancing overall system security. |
IV. Technical Implementation and Selection Guide
|
Technical Parameter |
Unit |
12kV / 17.5kV System |
24kV System |
36kV / 40.5kV System |
|
Rated Voltage |
kV |
12 / 17.5 |
24 |
36 / 40.5 |
|
Rated Current |
A |
1250 - 5000¹ |
2500 - 4000¹ |
1250 - 3000¹ |
|
Maximum Breaking Capacity |
kA (RMS) |
210 |
210 |
140 |
|
Note ¹: Forced air cooling required for rated currents exceeding 2000A. |
V. Summary
Ang Ultra-Fast Current Limiter (FCL) wala lang usa ka simple alternative device apan represent sa revolutionary approach sa system protection. Through its millisecond-level breaking speed, redefines niya ang benchmark para sa short-circuit protection, delivering unprecedented safety ug economic benefits sa customers. When facing the widespread challenge sa excessive short-circuit currents, ang FCL provides a top-tier solution nga mature, reliable, ug validated by thousands of projects globally. Kini strategic choice aron ensure the future reliability ug economical operation sa critical power systems.