• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Minera MP Oil Immersed Medium Power Transformers

  • Minera MP Oil Immersed Medium Power Transformers

Key attributes

Brand Schneider
Model NO. Minera MP Oil Immersed Medium Power Transformers
Rated frequency 50/60Hz
Series Minera MP

Product descriptions from the supplier

Description

General

Our broad range for Minera MP transformers includes:

  • Three phase units (single phase available on request)

  • Ratings up to 80 MVA, 50 or 60 Hz

  • Voltage insulation level up to 170 kV

  • Breathing or sealed type

  • A wide range of accessories

  • High capacity cooling options such as ONAN, ONAF, OFAF, OFWF or others upon request

  • Standard or low noise levels

  • Off-circuit tap changer (OCTC) or on load tap changer (OLTC)

Minera MP oil-immersed transformers are also available upon request for special applications including rectifier, hazardous area transformers, reactors (shunt and series), auto-transformers, step-up transformers, Solar power plant , Wind Mill Application etc.
Minera MP oil-immersed transformers meet the requirements of international standards such as ANSI, IEEE, IEC as well as other international/national standards.

 

Technical caracteristics 

 

The right tune for your network

Depending on your application and the different environmental influences you meet, we are able to deliver you a large variety of Minera MP transformers. Schneider Electric’s R&D team has created special designs for all your particular needs:

  • Breathing type and sealed type

  • For indoor application in buildings or industrial plants and in compact distribution substations

  • For outdoor applications

  • Normal noise level for urban or residential areas

  • Normal, low or very low level of losses

As customer satisfaction is our main concern, we constantly improve our manufacturing process, thus we are able to speed up delivery time while ensuring that all ISO 9001, ISO 14001 and/or ISO 18001 requirements are met at each production step. To ensure this high level of quality, our Minera MP transformers undergo routine tests in accordance with international standards such as IEC, ANSI standards. We can also provide type tests or special tests on request.

 

 

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 20000m² Total staff: Highest Annual Export(usD): 400000000
Workplace: 20000m²
Total staff:
Highest Annual Export(usD): 400000000
Services
Business Type: Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding Electrodes
    Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding ElectrodesWhen the grounding electrode of an Ultra-High-Voltage Direct Current (UHVDC) transmission system is located close to a renewable energy power station, the return current flowing through the earth can cause a rise in ground potential around the electrode area. This ground potential rise leads to a shift in the neutral-point potential of nearby power transformers, inducing DC bias (or DC offset) in their
    01/15/2026
  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025

Related Solutions

  • EcoStruxure™ Connected solutions
    What is EcoStruxure™ ?EcoStruxure™ is our open, interoperable, IoT-enabled system architectureand platform. EcoStruxure delivers enhanced value around safety, reliability,efficiency, sustainability, and connectivity for our customers. EcoStruxureleverages advancements in IoT, mobility, sensing, cloud, analytics, andcybersecurity to deliver Innovation at Every Level. This includes ConnectedProducts, Edge Control, and Apps, Analytics & Services, which are supported byCustomer Lifec
    04/23/2025
  • RM6 SeT Digital solutions
    Digital solutionsDistributed DTU Easergy T300Comprehensive features and flexbile scalabilityTailored to meet future operational challenges ofdistribution network automationApplications range from monitoring rooms tomedium and low voltage distribution stationsTH110-R cable joint temperature measurementWireless passive, easy to installDirect measurement of conductor temperaturewith high accuracyPD110 series local discharge test deviceReal-time monitoring of equipment corona andpartial discharge st
    04/30/2025
  • Your trusted partner for wind turbine and wind farm solutions
    Solutions overviewControl of the wind turbineEnsure an optimized operating environmentGain greater control of the turbine through automation and backup powerChoosing the most efficient wind turbine is the key to success. Schneider Electric offers a fully automated wind turbine with the programmablelogic controller (PLC) and a highly-reliable UPS. They have a very low power consumption, and can be easily modified or upgraded.As such, the PLC functions as the “brain” of the wind turbin
    05/05/2025
Related Free tools
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.