• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


High-speed fuse DNT-J1R Series Semiconductor fuses

  • High-speed fuse DNT-J1R Series  Semiconductor fuses
  • High-speed fuse DNT-J1R Series  Semiconductor fuses
  • High-speed fuse DNT-J1R Series  Semiconductor fuses

Key attributes

Brand Switchgear parts
Model NO. High-speed fuse DNT-J1R Series Semiconductor fuses
Rated voltage AC690V
Rated normal current 800-1600A
Breaking capacity 100kA
Series DNT-J1R

Product descriptions from the supplier

Description

This series of fuses for semiconductor equipment protection features strong current-limiting capability and high breaking capacity. They are suitable for rail transit, electric vehicle new energy stations, communications, and the power industry. These fuses can be used for short-circuit and overload current protection in power systems, energy storage systems, inverters, semiconductor equipment components, and devices.

Basic parameters of fuse links

Product model size Rated voltage          V Rated current         A Rated breaking  capacity    kA
DNT1-J1R-100 1 AC 690 100 100
DNT1-J1R-125 125
DNT1-J1R-160 160
DNT1-J1R-200 200
DNT1-J1R-250 250
DNT1-J1R-315 315
DNT1-J1R-350 350
DNT1-J1R-400 400
DNT1-J1R-450 450
DNT1-J1R-500 500
DNT1-J1R-550 550
DNT1-J1R-630 630
DNT2-J1R-350 2 350
DNT2-J1R-400 400
DNT2-J1R-450 450
DNT2-J1R-500 500
DNT2-J1R-550 550
DNT2-J1R-630 630
DNT2-J1R-710 710
DNT2-J1R-800 800
DNT2-J1R-900 900
DNT2-J1R-1000 1000
DNT2-J1R-1100 1100
DNT2-J1R-1250 1250
DNT3-J1R-800 3 800
DNT3-J1R-900 900
DNT3-J1R-1000 1000
DNT3-J1R-1100 1100
DNT3-J1R-1250 1250
DNT3-J1R-1400 1400
DNT3-J1R-1500 1500
DNT3-J1R-1600 1600
Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 1000m² Total staff: Highest Annual Export(usD): 300000000
Workplace: 1000m²
Total staff:
Highest Annual Export(usD): 300000000
Services
Business Type: Sales
Main Categories: Low Voltage Electrical Apparatus/Instrument meters/Production equipment/Tester/High Voltage Electrical Apparatus/Electrical fittings/Equipment Parts
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding Electrodes
    Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding ElectrodesWhen the grounding electrode of an Ultra-High-Voltage Direct Current (UHVDC) transmission system is located close to a renewable energy power station, the return current flowing through the earth can cause a rise in ground potential around the electrode area. This ground potential rise leads to a shift in the neutral-point potential of nearby power transformers, inducing DC bias (or DC offset) in their
    01/15/2026
  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.