Procedura Testuum Admissibilium pro Transformatoribus Electricis Oleo-Immersis

Oliver Watts
Campus: Inspectio et Experimentum
China

Procedurae Probationis Commutationis Transformatoris

1. Probae Non-Porcellanae Bushing

1.1 Resistentia Insulationis

Suspensio bushing verticaliter utendo craneo aut frame supporto. Metire resistentiam insulationis inter terminalem et tap/flange utendo metron 2500V insulationis. Valores mensurati non debent significanter abicere a valoribus factory sub similibus conditionibus environmentalibus. Pro bushing capacitor-type rated 66kV et supra cum parvis bushing voltage sampling, metire resistentiam insulationis inter bushing parvum et flange utendo metron 2500V insulationis; valor non debet esse minus quam 1000MΩ.

1.2 Mensura Factoris Dissipationis

Metire factorem dissipationis (tanδ) et capacitatem insulationis principali ad tap utendo methodo wiring positivo. Sequi configurationem wiring instrumenti specificati et selecta test voltage 10kV.

Ducula high-voltage pro factoribus dissipationis testing debeant proprie suspendi cum insulating tape, teneantur longe ab aliis equipment et terra. Implementare praesidia security apta ad prohibendum accessum unauthorized ad area high-voltage test. Valores mensurati factores dissipationis et capacitatis non debent significanter abicere a valoribus factory et debent complere standards handover.

2. Inspectio et Testing On-Load Tap Changer

Inspectionem actionis sequentiae completae contactorum on-load tap changer. Metire valor resistivitatis transitionis et tempus switching. Valores mensurati resistivitatis transitionis, deviation triphasica synchronization, valores temporis switching, et deviation tempus switching forward-reverse debent complere requisita technica manufacturer.

Oil-Immersed Power Transformer.jpg

3. Mensura Resistance DC Windings cum Bushings

Metire resistance DC winding high-voltage in singulis positionibus tap et low-voltage side. Pro transformatoribus cum punctis neutralibus, metire resistance DC single-phase ubi aptum. Recorda temperaturam ambientem durante measurement ad facilitandam comparationem cum valoribus factory post conversionem temperature. Deviation inter line-to-line vel phase-to-phase debet complere standards handover.

4. Inspectio Ratio Voltage pro Omnibus Positionibus Tap

Connect leads tester ratio turns ad high et low voltage sides transformatoris triphasici. Inspectio ratio voltage pro omnibus positionibus tap. Comparata cum data nameplate manufacturer, non debet esse significans differentia, et rationes debent sequi patterns expectatas. In positione tap rated, error permittendus est ±0.5%. Pro transformatoribus tri-winding, performa tests ratio pro HV-MV, MV-LV separatim.

5. Inspectio Group Connection Triphasica et Polarity Terminalis Transformatoris Single-Phase

Resultata verificationis debent convenire cum requisitis design, marking nameplate, et symbolis in housing transformatoris.

6. Sampling et Testing Insulation Oil

Sampling oil debet fieri postquam transformator plene impletus est oleo et permansit pro tempore specificato. Post colligendum sample oil, seal container proper et prompte deliver ad department relevant pro testing.

7. Mensura Resistance Insulation, Absorption Ratio vel Index Polarizationis

Omnes tests insulation-related debent fieri postquam insulating oil approbavit inspectionem et sub conditionibus weather cum levelibus humidity appropriatis. Pro transformatoribus requirientibus mensuram index polarizationis, verificare ut current short-circuit metron resistance insulationis non sit minor quam 2mA. Recorda temperaturam ambientem durante testing ad facilitandam comparationem cum valoribus factory ad temperature equivalentes. Valores mensurati non debent esse minus quam 70% valorum factory. Test items debent includere: HV-(MV+LV+ground), MV-(HV+LV+ground), LV-(MV+HV+ground), overall-ground, core-(clamp+ground), et clamp-(core+ground). Exempli gratia, pro HV-(MV+LV+ground), short-circuit omnes tres phases lateralis high-voltage et punctum neutral corresponding (si present), ground omnia alia partes, connect terminal high-voltage metron resistance insulationis ad lateralem HV, et terminal ground ad ground pro testing.

8. Mensura Factoris Dissipationis (tanδ) pro Windings cum Bushings

Test utendo methodo wiring reverso, sequi configurationem wiring instrumenti specificati. Test items includunt: HV-(MV+LV+ground), MV-(HV+LV+ground), LV-(MV+HV+ground), et overall-ground, facienda secundum ordinem. Durante testing, suspend ducula high-voltage tester factoris dissipationis cum insulating tape ad prohibendum contactum cum tank transformatoris. Recorda temperaturam ambientem durante testing. Comparata cum valoribus factory ad temperature equivalentes, valores mensurati non debent superare 1.3 times valorum factory. Si measurements deviant significanter ab valoribus factory, clean bushings aut use conductive shielding super bushings ad reducendum current leakage surface. Testing debet preferenter fieri sub conditionibus weather cum relativiter humilitate basse.

9. Mensura Current Leakage DC pro Windings cum Bushings

Mensura currentis effluvii debet fieri ad terminalem alti voltus. Item testandi sunt: HV-(MV+LV+terra), MV-(HV+LV+terra), LV-(MV+HV+terra). Testa debent fieri in tempore parvo humiditatis, et temperatura ambientis debet registrari. Valores currentis effluvii non debent excedere specifica in normis traditionis.

10. Experimenta Electrica

10.1 Experimentum Deformationis Bobinorum

Pro transformatoribus nominatis 35kV et infra, methodus impedientiae commutationis bassi voltus commendatur. Pro transformatoribus nominatis 66kV et supra, methodus analysis responsionis frequentiae (FRA) commendatur pro mensurando spectris characteristici bobinorum.

10.2 Experimentum Tolerantiae Voltus Alternati

Fer experimenta tolerantiae voltus alternati ad terminales transformatoris utendo vel voltage frequentiali externae applicationis vel methodo inductionis. Quod possibile est, uti testing inductionis resonantia seriea ad reducendum capacita apparatus testandi necessaria. Pro transformatoribus nominatis 110kV et supra, punctum neutrale debet preferenter subire experimentum separatim tolerantiae voltus alternati. Valores voltage experimenti debent sequi normas traditionis.

10.3 Experimentum Longi Temporis Inductionis cum Mensura Dispersio Partialis

Pro transformatoribus nominatis 220kV et supra, experimenta longi temporis inductionis cum mensura dispersio partialis debent fieri in situ durante nova installatione. Pro transformatoribus 110kV, testing dispersio partialis commendatur quando qualitas isolationis dubia est. Haec experimenta detegunt defectus internos non penetrantes in transformatoribus.

10.4 Experimentum Clausurae Impulsus Totius Voltus ad Voltu Nominato

Fer secundum requisitiones plani inaugurationis.

10.5 Verificatio Phasium

Verifica sequentiam phasorum transformatoris, quae debet convenire cum sequentia phasorum rete.

Specialis attendendum debet fieri ad characteristics olei ad temperaturis negativis pro singulis systematibus olei. Sicut, oleum intra vas principale habet viscositatem maiorem ad temperaturis negativis, resultans in fluiditate mala et dissipatione caloris. Oleum in compartimento commutationis on-load tap changer ad temperaturis negativis potest prolongare processum commutationis et augmentare incrementum caloris resistorum transitionis.

Pro systemate olei vasis principalis transformatorum EHV immersorum oleo, attendendum debet fieri etiam ad phenomena electrificationis fluxus olei. Praeveni transitionem ab electrificatione fluxus olei ad emissio electrica per controllandum resistivitatem olei, velocitatem fluxus olei in diversis partibus, et praebendo spatium sufficientem ad emittendum charges electricas in oleo.