SF6 gas analyze in switchgear purposes

Edwiin
Edwiin
Field: Power switch
China

00.jpg

Before Equipment Enters Service

To ensure the quality and condition of the gas in the equipment before it is put into service, measurements are typically taken for the SF6 percentage and humidity.

Additionally, it is necessary to determine the presence of SF6 decomposition products. Normally, the results should always be below the permitted levels for re - use.

During Equipment Service (Based on a Periodic Maintenance Regime)

Regularly, measurements are carried out for the SF6 percentage, decomposition products, and humidity. These tests can help identify potential issues such as:

  • Dielectric activities (Partial Discharge - PD, corona).

  • Nozzle wear.

  • Hot spots (indicating high contact resistance).

  • Non - standard switching conditions (resulting from heavy - duty switching operations).

  • Sealing problems (detected through humidity or air ingress).

  • Improper gas handling (manifested as humidity, air, or oil contamination).

After an Incident

  • In the event of a failure, gas testing can be part of the investigation process:

  • To identify the compartment where an internal flashover has occurred.

  • To assess the level of decomposition products.

  • To investigate abnormal behavior indicated by other factors, such as determining if the problem lies within a gas compartment.

  • To correlate the results obtained from other condition assessment techniques, like PD measurements.

Give a tip and encourage the author!
Recommended
 Causes and Preventive Measures of Fire and Explosion in Oil Circuit Breakers
Causes and Preventive Measures of Fire and Explosion in Oil Circuit Breakers
Causes of Fire and Explosion in Oil Circuit Breakers When the oil level in an oil circuit breaker is too low, the oil layer covering the contacts becomes too thin. Under the effect of the electric arc, the oil decomposes and releases flammable gases. These gases accumulate in the space beneath the top cover, mixing with air to form an explosive mixture, which can ignite or explode under high temperature. If the oil level inside the tank is too high, the released gases have limited space to expan
Felix Spark
11/06/2025
THD Measurement Error Standards for Power Systems
THD Measurement Error Standards for Power Systems
Error Tolerance of Total Harmonic Distortion (THD): A Comprehensive Analysis Based on Application Scenarios, Equipment Accuracy, and Industry StandardsThe acceptable error range for Total Harmonic Distortion (THD) must be evaluated based on specific application contexts, measurement equipment accuracy, and applicable industry standards. Below is a detailed analysis of key performance indicators in power systems, industrial equipment, and general measurement applications.1. Harmonic Error Standar
Edwiin
11/03/2025
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
Ring main units (RMUs) are used in secondary power distribution, directly connecting to end-users such as residential communities, construction sites, commercial buildings, highways, etc.In a residential substation, the RMU introduces 12 kV medium voltage, which is then stepped down to 380 V low voltage through transformers. The low-voltage switchgear distributes electrical energy to various user units. For a 1250 kVA distribution transformer in a residential community, the medium-voltage ring m
James
11/03/2025
Why Monitoring Accuracy Matters in Power Quality Systems
Why Monitoring Accuracy Matters in Power Quality Systems
The Critical Role of Monitoring Accuracy in Power Quality Online DevicesThe measurement accuracy of online power quality monitoring devices is the core of the power system’s “perception capability,” directly determining the safety, economy, stability, and reliability of power supply to users. Inadequate accuracy leads to misjudgment, incorrect control, and flawed decision-making—potentially causing equipment damage, economic losses, or even grid failures. Conversely, high accuracy enables precis
Oliver Watts
10/30/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.