Accident Analysis and Improvement Measures for EAF Transformer High-Voltage Tap Changer Burnout

Dyson
Dyson
Field: Electrical Standards
China

Currently, the company operates two electric arc furnace (EAF) transformers. The secondary voltage ranges from 121 V to 260 V, with a rated current of 504 A / 12,213 A. The high-voltage side has a total of eight tap positions, utilizing motor-driven off-circuit voltage regulation. The equipment is equipped with a reactor of corresponding capacity, connected in series to designated taps on the high-voltage side. These transformers have been in operation for over 20 years. Throughout this period, to meet the evolving demands of the steelmaking process, several technical upgrades have been implemented on the electrode control system and transformer protection system, aiming to ensure safe and stable equipment operation. However, achieving this goal critically depends on the completeness and reliability of the interlocking circuit between the secondary protection circuit of the EAF transformer and the arc furnace's electrode control system. In recent years, several incidents of high-voltage tap changer burnout have occurred, raising concerns about the reliability of the associated interlocking circuits.

1 Accident Phenomenon

Core inspections of the transformers revealed that all failures involved burnout of the high-voltage side tap changer. In each incident, the secondary protection on the high-voltage side operated reliably. The instantaneous overcurrent protection setting for the high-voltage switch was 6,000 A on the primary side, meaning the protection would only activate if the short-circuit current through the tap changer exceeded 6,000 A instantaneously. However, the rated current of the tap changer itself is only 630 A.

2 Root Cause Analysis

The steelmaking process consists of three stages: melting, oxidation, and reduction. During the melting stage, the three-phase load fluctuates dramatically, generating large inrush currents that are often unbalanced. Even during the refining stage, continuous changes in the arc discharge path and arc gap ionization lead to constantly unbalanced load currents, resulting in zero-sequence components. When these zero-sequence components are reflected onto the star-connected high-voltage winding, they cause neutral point voltage displacement.

Based on the observed failure phenomena, various contributing conditions were analyzed. Detailed studies were conducted on the electrical circuits of the arc furnace electrode control system, the interlock relationship between the high-voltage secondary protection circuit, and the positions of the tap changer during gear shifting. Field tests were repeatedly performed to simulate whether the conditions leading to failure could occur during steelmaking. Ultimately, the following deficiencies in the interlocking protection circuit on the high-voltage side of the EAF transformer were identified. During steelmaking, the occurrence of any one of the following conditions could lead to tap changer burnout:

  • Performing tap changing after high-voltage power shutdown. During the tap changing process using the tap changer controller, the digital display may indicate completion, but the tap changer has not fully reached its position (i.e., the contact area between moving and stationary contacts has not reached the required capacity). If high-voltage power is restored under these conditions, it can lead to phase-to-phase short circuits and subsequent burnout of the tap changer during steelmaking.

  • Tap changing under voltage, i.e., directly changing the tap position of the tap changer while the arc furnace is operating.

  • Energizing under load, i.e., restoring high-voltage power while the three-phase electrodes of the arc furnace are still in contact with molten steel.

3 Improvement Measures

Compared to conventional power transformers, EAF transformers have the following characteristics: higher overload capacity, greater mechanical strength, larger short-circuit impedance, multiple secondary voltage levels, higher transformation ratios, low secondary voltage (tens to hundreds of volts), and high secondary current (thousands to tens of thousands of amperes). Current control in the arc furnace is achieved by changing the tap connections on the high-voltage side of the transformer and adjusting the electrode positions.

During steelmaking, according to process requirements and the operational nature of the EAF transformer, the two high-voltage switchgear units installed at the furnace front operate dozens or even hundreds of times per day. This places rigorous demands on the performance of vacuum switches and the reliability of protective operations. Therefore, the design incorporates a "one-in-use, one-on-standby" configuration, controlled from the furnace front operator station. Power is supplied via high-voltage power cables from the company's 66 kV central substation.

Given the deficiencies in the interlocking protection control circuit, it is essential to prevent the conditions that lead to tap changer burnout during steelmaking operations. Through analysis of the interlocking circuit, simulation testing, structural study of the tap changer, and understanding of the steelmaking process, the following corrective measures were developed:

  • Prohibit high-voltage energization until tap changing is fully completed;

  • Prohibit tap changing while the high-voltage side is energized;

  • Prohibit energizing the transformer under load.

4 Conclusion

By implementing the above solutions to address the deficiencies in the EAF transformer's interlocking protection control circuit, the reliability of the interlock system has been significantly enhanced. This effectively prevents operational errors by personnel from causing equipment damage, ensuring the safe, stable, and reliable operation of the EAF transformers. It also guarantees the successful completion of the company's steelmaking production tasks and substantially reduces equipment maintenance costs.

Give a tip and encourage the author!
Recommended
Minimum Operating Voltage for Vacuum Circuit Breakers
Minimum Operating Voltage for Vacuum Circuit Breakers
Minimum Operating Voltage for Trip and Close Operations in Vacuum Circuit Breakers1. IntroductionWhen you hear the term "vacuum circuit breaker," it might sound unfamiliar. But if we say "circuit breaker" or "power switch," most people will know what it means. In fact, vacuum circuit breakers are key components in modern power systems, responsible for protecting circuits from damage. Today, let's explore an important concept — the minimum operating voltage for trip and close operations.Though it
Dyson
10/18/2025
Efficient Wind-PV Hybrid System Optimization with Storage
Efficient Wind-PV Hybrid System Optimization with Storage
1. Analysis of Wind and Solar Photovoltaic Power Generation CharacteristicsAnalyzing the characteristics of wind and solar photovoltaic (PV) power generation is fundamental to designing a complementary hybrid system. Statistical analysis of annual wind speed and solar irradiance data for a specific region reveals that wind resources exhibit seasonal variation, with higher wind speeds in winter and spring and lower speeds in summer and autumn. Wind power generation is proportional to the cube of
Dyson
10/15/2025
Wind-Solar Hybrid Powered IoT System for Real-Time Water Pipeline Monitoring
Wind-Solar Hybrid Powered IoT System for Real-Time Water Pipeline Monitoring
I. Current Status and Existing ProblemsCurrently, water supply companies have extensive networks of water pipelines laid underground across urban and rural areas. Real-time monitoring of pipeline operation data is essential for effective command and control of water production and distribution. As a result, numerous data monitoring stations must be established along the pipelines. However, stable and reliable power sources near these pipelines are rarely available. Even when power is accessible,
Dyson
10/14/2025
How to Build an AGV-Based Intelligent Warehouse System
How to Build an AGV-Based Intelligent Warehouse System
Intelligent Warehouse Logistics System Based on AGVWith the rapid development of the logistics industry, growing land scarcity, and rising labor costs, warehouses—serving as key logistics hubs—are facing significant challenges. As warehouses become larger, operational frequencies increase, information complexity grows, and order-picking tasks become more demanding, achieving low error rates and reduced labor costs while improving overall storage efficiency has become a primary goal for the wareh
Dyson
10/08/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.