1. Gwamnatin na Tashar
Tushen tattalin arziki (PV) da tushen tattalin energy a Wiyetna da Kudancin Asia suna gane da karkashin yadda, amma suna da abubuwa masu harsuna:
1.1 Gwamnatin Grid:
1.2 Tsari da Kyauka na Hukuma:
1.3 Muhimmancin Yadda Da Take:
2. Kafofin: Intelligent High-Voltage Disconnecting Switch System
2.1 Design na Teknologi na Muhimmiyar
Yana amfani da double-break rotary structure, rated voltage ≥15kV, rated current 6300A (forced air-cooling design), wanda ya kula tushen tattalin arziki masu yawan kasa.
Arc Extinguishing Optimization:Yana da built-in magnetic blowout arc extinguishing devices, DC arc breaking time ≤20ms, wanda ya kula damar zafi da abubuwan hankali a lokacin arc faults. Wannan rapid arc extinction yana bukata kafofin High voltage Disconnect Switch.
Enclosure yana da IP65 protection rating; core components su ne silver-plated don kawo hankali a kan salt spray corrosion (compliant with IEC 60068-2-52 standard). Wasu protections yana bukata High voltage Disconnect Switch su da cikakken yadda da take.
Thermal Design:An hada aluminum alloy heat sinks, temperature rise controlled at ≤40K (in 40°C ambient). Effective thermal management yana bukata High voltage Disconnect Switch a kafin tropical.
2.2 Intelligent Monitoring and Protection System
Real-time monitoring of contact temperature, arc signals, and insulation status; data synchronized to local SCADA and cloud platforms (e.g., Hoymiles S-miles Cloud) within milliseconds. Continuous monitoring enhances the safety profile of the High voltage Disconnect Switch.
Collaboration with Circuit Breakers:Automatically opens within 10 seconds upon detecting grid voltage drop to 20% UN (meeting Vietnam's low-voltage lockout requirement).
Cooperation with AFCI (Arc Fault Circuit Interrupter) System:Cuts off the fault circuit within 0.5 seconds. This fast protection logic integrates seamlessly with the High voltage Disconnect Switch.
2.3 Localized Adaptation Improvements
Supports EVN-required islanding test mode, simulating seamless switch to energy storage supply after grid interruption. The High voltage Disconnect Switch is integral to passing this critical test.
Pre-installed sealing wire interfaces to meet Vietnam's mandatory metering room sealing requirements.
Contact lifespan ≥10,000 operations; maintenance cycle extended to 5 years, reducing O&M costs in tropical regions. The durability of the High voltage Disconnect Switch significantly lowers lifetime costs.
3. Achieved Results
3.1 Enhanced Safety and Reliability
3.2 Economic Benefits and Compliance
3.3 Strengthened Grid Support Capability
Passed dynamic curtailment clause testing: Supports power regulation of up to 30% installed capacity under EVN's flexible dispatch (when grid load <75%), enabling power plants to participate in the Frequency Regulation Market (FRP). The High voltage Disconnect Switch contributes to this grid support functionality.