1. Konteksto sa Proyekto
Ang mga proyekto sa distributibong photovoltaic (PV) ug energy storage nagdala og radyo nga pag-abot sa Vietnam ug Southeast Asia, apan naghahadlok sa mga seriyosong hamubo:
1.1 Kabag-oan sa Grid:
1.2 Pressure sa Pagsumala sa Policy ug Safety:
1.3 Mga Panginahanglan sa Environmental Adaptability:
2. Solusyon: Intelligent High-Voltage Disconnecting Switch System
2.1 Core Technology Design
Ginamit ang double-break rotary structure, rated voltage ≥15kV, rated current 6300A (forced air-cooling design), mogamit sa needs sa large-scale distributed power plants.
Arc Extinguishing Optimization:Equipado uban sa built-in magnetic blowout arc extinguishing devices, DC arc breaking time ≤20ms, preventing arc faults from causing fires. Kini nga rapid arc extinction usa ka key safety feature sa High voltage Disconnect Switch.
Ang enclosure adunay IP65 protection rating; ang core components silver-plated aron molukso sa salt spray corrosion (compliant sa IEC 60068-2-52 standard). Kini nga protections ensure the long-term reliability of the High voltage Disconnect Switch.
Thermal Design:Idugang ang aluminum alloy heat sinks, temperature rise controlled at ≤40K (in 40°C ambient). Effective thermal management is vital for the High voltage Disconnect Switch in tropical climates.
2.2 Intelligent Monitoring and Protection System
Real-time monitoring sa contact temperature, arc signals, ug insulation status; data synchronized sa local SCADA ug cloud platforms (e.g., Hoymiles S-miles Cloud) within milliseconds. Continuous monitoring enhances the safety profile of the High voltage Disconnect Switch.
Collaboration with Circuit Breakers:Automatically opens within 10 seconds upon detecting grid voltage drop to 20% UN (meeting Vietnam's low-voltage lockout requirement).
Cooperation with AFCI (Arc Fault Circuit Interrupter) System:Cuts off the fault circuit within 0.5 seconds. This fast protection logic integrates seamlessly with the High voltage Disconnect Switch.
2.3 Localized Adaptation Improvements
Supports EVN-required islanding test mode, simulating seamless switch to energy storage supply after grid interruption. The High voltage Disconnect Switch is integral to passing this critical test.
Pre-installed sealing wire interfaces to meet Vietnam's mandatory metering room sealing requirements.
Contact lifespan ≥10,000 operations; maintenance cycle extended to 5 years, reducing O&M costs in tropical regions. The durability of the High voltage Disconnect Switch significantly lowers lifetime costs.
3. Nakamit nga Resulta
3.1 Enhanced Safety and Reliability
3.2 Economic Benefits and Compliance
3.3 Strengthened Grid Support Capability
Passed dynamic curtailment clause testing: Supports power regulation of up to 30% installed capacity under EVN's flexible dispatch (when grid load <75%), enabling power plants to participate in the Frequency Regulation Market (FRP). The High voltage Disconnect Switch contributes to this grid support functionality.