Earthing of Electrical Transmission Tower

Electrical4u
Electrical4u
Field: Basic Electrical
0
China

What Is Earthing Of Electrical Transmission Tower

We should probably earth each tower of an electrical transmission line. We must measure footing resistance of each tower. We should take the footing resistance of tower in dry season before stringing the earth wire and/or OPGW (where OPGW is applicable). In any circumstances footing resistance of the tower will not be more than 10 ohms.
We should use either pipe earthing or counterpoise for earthing of the electrical transmission line tower. The tower earthing lug should extend beyond the concrete base of the tower leg. We also use lug connector in case of counterpoise earthing. Logically we should pipe earthing to any of the four legs of a tower but practically we should provide earthing to that leg which is specifically marked for providing earthing. Generally the leg members of that leg is marked with capital letter A. It’s a normal practice to avoid mistakes by tower erection gang. In case of river crossing and railway crossing towers we provide earthing at diagonally opposite two legs of a tower.
Let us now discuss these two types of earthing one by one.

Pipe Earthing of Electrical Transmission Tower

In case of pipe earthing system we use galvanised steel pipe of diameter 25 mm and of length 3 meters. We bury the pipe vertically in the soil in such a manner that the top of the pipe shall be 1 meter below the ground level. Where the tower stands on rock we have to bury the earthing pipe in damp soil available nearer to the tower.
Then we connect the tower leg with the pipe with the help of galvanized steel tape of suitable cross section. In that case we have to bury the steel tape in a groove cut on the rock and adequately protect the steel tape from damage.

In case of pipe earthing system we fill surroundings of the pipe with alternating layers of charcoal and salt, which maintain the surrounding soil of the pipe moist. A details pictorial representation of a pipe earthing is down here below.
pipe earthing of electrical transmission tower

Counterpoise Earthing

We use 10.97 mm dia galvanized wire for the purpose of counterpoise earthing of electrical transmission tower. Here we connect the galvanized wire with the leg of the tower with the help of galvanized lug and the galvanized lug is fitted with a tower leg with the help of 16 mm dia nut and bolts. The steel wire used for the purpose must be of minimum 25 meters in length. The wire is buried tangentially under the ground of minimum 1 meter depth from the ground level. Here four legs of a tower are connected together with counterpoise earth wire burried below the ground level of 1 meter depth as already been told.

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Give a tip and encourage the author!
Recommended
 Causes and Preventive Measures of Fire and Explosion in Oil Circuit Breakers
Causes and Preventive Measures of Fire and Explosion in Oil Circuit Breakers
Causes of Fire and Explosion in Oil Circuit Breakers When the oil level in an oil circuit breaker is too low, the oil layer covering the contacts becomes too thin. Under the effect of the electric arc, the oil decomposes and releases flammable gases. These gases accumulate in the space beneath the top cover, mixing with air to form an explosive mixture, which can ignite or explode under high temperature. If the oil level inside the tank is too high, the released gases have limited space to expan
Felix Spark
11/06/2025
THD Measurement Error Standards for Power Systems
THD Measurement Error Standards for Power Systems
Error Tolerance of Total Harmonic Distortion (THD): A Comprehensive Analysis Based on Application Scenarios, Equipment Accuracy, and Industry StandardsThe acceptable error range for Total Harmonic Distortion (THD) must be evaluated based on specific application contexts, measurement equipment accuracy, and applicable industry standards. Below is a detailed analysis of key performance indicators in power systems, industrial equipment, and general measurement applications.1. Harmonic Error Standar
Edwiin
11/03/2025
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Solid insulation assistance combined with dry air insulation is a development direction for 24 kV ring main units. By balancing insulation performance and compactness, the use of solid auxiliary insulation allows passing insulation tests without significantly increasing phase-to-phase or phase-to-ground dimensions. Encapsulation of the pole can address the insulation of the vacuum interrupter and its connected conductors.For the 24 kV outgoing busbar, with the phase spacing maintained at 110 mm,
Dyson
11/03/2025
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
Ring main units (RMUs) are used in secondary power distribution, directly connecting to end-users such as residential communities, construction sites, commercial buildings, highways, etc.In a residential substation, the RMU introduces 12 kV medium voltage, which is then stepped down to 380 V low voltage through transformers. The low-voltage switchgear distributes electrical energy to various user units. For a 1250 kVA distribution transformer in a residential community, the medium-voltage ring m
James
11/03/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.