What Is High Voltage Testing

The electrical power demand is rising rapidly. Now days, huge quantity of electrical power is necessary to transmit from one place to other for fulfilling this rising power demand. Bulk power transmission can be most efficiently done through high voltage electrical power transmission system. Hence, high voltage system becomes most essential requirement for power transmission. The equipments used in these high voltage transmission system, should be capable of withstanding this high voltage stress.

But in addition to that normal high voltage withstanding capability, high voltage equipment must also be capable of withstanding different over voltages during its operational life span. These different over voltages may occur during various abnormal conditions.

These abnormal over voltages cannot be avoided hence, the insulation level of the equipment is so designed and manufactured, that, it can withstand all these abnormal conditions.
To ensure the capabilities of withstanding these abnormal over voltages, the equipment must go through different high voltage testing procedures.

Some of these tests are used to ensure, permittivity, dielectric losses per unit volume and dielectric strength of an insulating material. These tests are generally carried out on a specimen of insulating material. Some other high voltage tests are carried out on the complete equipments. These tests are far measuring and ensuring, capacitance, dielectric losses, break down voltage, and flash over voltage etc. of the equipment as a whole.

Types of High Voltage Test

There are mainly four types of high voltage testing methods applied on high voltage equipment and these are

  • Sustained low frequency tests.

  • Constant DC test.

  • High frequency test.

  • Surge or impulse test.

Sustained Low Frequency Test

This test is generally done at power frequency (In India it is 50 Hz and in America it is 60 Hz). This is most commonly used high voltage test, carried on H.V. equipment. This test i.e. sustained low frequency test are carried out on a specimen of insulating material to determine and ensure, dielectric strength, dielectric losses of the insulating material. This test is also carried out on high voltage equipment and high voltage electrical insulators to ensure the dielectric strength and losses of these equipment and insulators.

Sustained Low Frequency Testing Procedure

The testing procedure is very simple. High voltage is applied across a specimen of insulation or equipment under test by means of a high voltage transformer. A resistor is connected with series with the transformer to limit the short circuit current in the event of breakdown occurred in the device under test. The resistor is rated with as many ohms as the high voltage applied across the device under test.

That means the resistance must be rated 1 ohm / volt. For example if we apply 200 KV during the test, the resistor must have 200 KΩ, so that during ultimate short circuit condition, the faulty current must be limited to 1 A. For this test the power frequency high voltage is applied to the specimen or equipment under test for a long specific period to ensure the continuous high voltage withstanding capability of the device.

N. B. : The transformer used for producing extra high voltage in this type of high voltage testing procedure, may not be of high power rating. Although although the output voltage is very high, but maximum current is limited to 1A in this transformer. Sometimes, cascaded transformers are used to get very high voltage, if required.

High Voltage DC Test

High voltage DC test is normally applicable to those equipments which are used in high voltage DC transmission system. But this test is also applicable for high voltage AC equipments, when high voltage AC testing is not possible due to unavoidable condition.

For example mainly at site, after installation of equipments it is quite difficult to arrange for high voltage alternating power as high voltage transformer may not be available at site. Hence, high voltage test with alternating power is not possible at site after installation of equipment. At that situation high voltage DC test is most suitable.

In high voltage direct current test of AC equipment, direct voltage about two times of the normal rated voltage is applied across the equipment under test for 15 minutes to 1.5 hours. Although high voltage DC test is not complete substitute of high voltage AC test but still it is applicable where HVAC test is not at all possible.

High Frequency Test

The insulators used at high voltage transmission system, may be subjected to breakdown or flash-over during high frequency disturbances. The high frequency disturbances occur in the HV system due to switching operations or any other external causes. High frequency in power may cause failure of insulators even at comparatively low voltage due to high dielectric loss and heating.

So the insulation of all high voltage equipment must ensure the high frequency voltage withstanding capacity during its normal life span. Mainly sudden interruption of line current during switching and open circuit fault, gives rise to the frequency of voltage wave form in the system.

It is found the dielectric loss for every cycle of the power is nearly constant. So at high frequency the dielectric loss per second becomes much higher than that of normal power frequency. This fast and large dielectric loss causes excessive heating of the insulator. Excessive heating ultimately results to insulation failure may be by blasting of insulators. So to ensure this high frequency voltage withstanding capacity, high frequency test is carried out on high voltage equipments.

Surge Test or Impulse Test

There may be great influence of surge or lighting on the transmission lines. These phenomena can breakdown transmission line insulator and it may also attack, the electrical power transformer connected at the end of the transmission lines. Surge test or impulse tests are very high or extra high voltage tests, carried out for investing the influences of surges or lightning on the transmission equipment.

Normally direct lightening strokes on transmission line is very rare. But when a charged cloud comes closer to the transmission line, the line is oppositely charged due to the electrical charge inside the cloud. When this charged cloud is suddenly discharged due to lightning stroke nearby, the induced charge of the line no longer bound but travel through the line with velocity of light.

So it is understood that even when the lightning do not strike the transmission conductor, directly, still there will be a transient over voltage disturbance.
Due to lightning discharge on the line or nearby to the line, a step fronted voltage wave travel along the line. The wave form is shown below.
Surge WaveformDuring traveling of this wave, high voltage stress occurred on the insulator. Due to which violent rupture of insulators is often caused by such lightning impulse. So proper investigation of the insulator and insulating parts of high voltage equipments, should be done properly by high voltage testing.

The lightning impulse is totally natural phenomenon so it does not have any predetermined shape and size of the steep-fronted voltage. So, for performing this high voltage testing, a standard voltage wave is applied. This standard voltage may not have any similarity in height and shape with the actual impulse voltage due to lightning or surges.

In Britain in BSS 923 : 1940, the standard testing wave is expressed as 1/50 νsec which means, the voltage rises to its peak within 1 micro second and fall to 50% of its peak value within 50 micro second. As per Indian standard, the impulse voltage is expressed as 12/50 νsec. That indicates, the voltage rises to its peak at 12 micro seconds and falls back to 50% of its peak at 50 micro second.

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Give a tip and encourage the author!
Recommended
Low-Voltage Distribution Cabinet Maintenance Steps and Safety Guide
Low-Voltage Distribution Cabinet Maintenance Steps and Safety Guide
Maintenance Procedure for Low-Voltage Power Distribution FacilitiesLow-voltage power distr ibution facilities refer to the infrastructure that delivers electrical power from a power supply room to end-user equipment, typically including distribution cabinets, cables, and wiring. To ensure the normal operation of these facilities and guarantee user safety and power supply quality, regular maintenance and servicing are essential. This article provides a detailed introduction to the maintenance pro
Edwiin
10/28/2025
Low-Voltage Electrical Work Safety Preparation and Operation Guide
Low-Voltage Electrical Work Safety Preparation and Operation Guide
Low-Voltage Electrician Safety Operating Procedures1. Safety Preparation Before performing any low-voltage electrical work, personnel must wear approved protective equipment, including insulating gloves, insulating boots, and insulating workwear. Carefully inspect all tools and equipment for proper operation. Report any damage or malfunction immediately for repair or replacement. Ensure adequate ventilation at the worksite. Avoid prolonged work in confined spaces to prevent fire hazards or poiso
Echo
10/28/2025
How to Handle Common Faults in RMU and Transformer Substations?
How to Handle Common Faults in RMU and Transformer Substations?
1. Ring Main Unit (RMU) and Transformer SubstationThe ring main unit (RMU) and transformer substation is a critical terminal in a distribution ring network system. The operational status of this terminal is directly affected by the performance of the distribution ring network system. Therefore, this section discusses the advantages, system composition, and key characteristics of the distribution ring network.1.1 Advantages of RMU and Transformer SubstationDue to technological limitations, radial
Felix Spark
10/28/2025
Six Key Differences Between Ring Main Units and Switchgear Explained
Six Key Differences Between Ring Main Units and Switchgear Explained
Differences Between Ring Main Units (RMUs) and SwitchgearIn power systems, both ring main units (RMUs) and switchgear are common distribution equipment, but they differ significantly in function and structure. RMUs are primarily used in ring-fed networks, responsible for power distribution and line protection, with the key feature being multi-source interconnection through a closed-loop ring network. Switchgear, as a more general-purpose distribution device, handles power reception, distribution
Echo
10/28/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.