I. Kîna ji bo Yek Faulta Overvoltage ya Grid Voltage e?
Overvoltage ya grid voltage dike bir fênomena e ku divê bi rêjeya çalakîyê ya nermalî were piştgirî kirin.
Yekêre, li ser freqencya şerikê, ger heta RMS (Root Mean Square) ya dergahê AC bibe da 10% yê jêr hesabkirî û ev dest pê deqet minût, divê wek faulta overvoltage ya grid voltage bêtirin.
Mînak, li ser sisteman gridê ya sêfaseya 380V yên Çîn, ger dergah bibe da 418V û ev dest pê deqet demekî, divê faulta overvoltage ya grid voltage têne wergerandin.
Li istilgahan guneç (PV), inverteran paralel hatine encuma yên derbarê grid voltage.
Inverteran herêmê sensorên dergahê yên bikarhênerîn dike ku dergaha gridan hilînin. Sensoran îro zanyarên dergahê bi sistema kontrola inverteran din berdane, ku analiz û proces bikin da dikarin taybet bike da dergaha grid an jêr rengi çalakîyê ne.
Ger dergaha grid bibe da rûniyên ewle yên amneye, inverter hemen mekanîzmaya parastina aktive bike, bigire û ji grid derbas bike da overvoltage nehatîn malper û amneye ya operasyonan parastin.
Tebahî, li istilgahan PV yên mezbur, cihazên monitoringa kalîta elektrikê xas bişînin da monitoringa kompîtir û real-time bi karî yên guhurtan gridan bikin, ku têne detektirin û pêşkerdanî ya problemên kalîta elektrikê, mînak overvoltage.
II. Asayîsa Faulta Overvoltage
(1) Factoran Line: Tesîra Impedance Cable
Cableyan nîve inverter û pîvan grid connection point dike rolên keyîn bi transmîsyona elektrik.
Ger cable bibe da rakîn, rezistansiya wê girde. Li ser qanûna Ohm (U = I×R), bi amperiya pêstî, rezistansiya girde dibêje vêjînînê dergahê, ku jêrîn dergaha output AC li ser inverter girde.

Cableyan rakîn têne rezistansiya girde, ku tebhişîn vêjînînê dergahê. Mînak, li ser istilgahan PV yên derveyî, ger pîvan grid connection point bibe da rakîn, bi karî yên cableyan ku nisbiyên navçeyan ne, tebhişîn faulta overvoltage li ser impedance cable.
Ger cableyan bibe da têkiliyên rakîn, inductancê wê girde. Li ser çavkanên AC, inductancê têne amperiya pêşand bike, ku têne dergahê veqetandin û tebhişîn faulta overvoltage.
Errors Wiring
Di dema instalasyonê xweyî de istilgahan PV, wiring cableyan AC (mînak, pîvan neutral terminal ji live wire) têne dergaha abnormî, ku têne inverter detektirin dergaha ku ne hatiye ên dergaha grid, ku têne aktivkirina mechanisma overvoltage protection.
Pas operasyonê inverter, connectionan rakîn û tevahî li ser cableyan grid têne contact resistance girde. Li ser qanûna Joule (Q = I²Rt, ku Q heat, I amperi, R rezistans, û t dem), contact resistance girde têne heat girde, ku têne vêjînînê temperature local. Ev têne performansa elektrik lineyê veqetandin, ku têne vêjînînê dergaha inverter û aktivkirina faulta overvoltage.
(2) Factors Grid Structure and Load: Conflict Between Grid Capacity and Load Absorption
Li ser herêmên jêr, paqij rûbar û herêmên ku infrastruktur gridê nîn pirsgir, capacity load absorption gridê nîn pir. Ger installed capacity PV li ser area power distribution yekê be da rakîn, power PV zi kerî hate lêdana grid. Ger grid ne hatiye absorbînin power bi rêjeya pêst û efektî, dergaha grid têne vêjînînê.
Transformer-Related Issues
Transformeran dike rolên keyîn bi conversiona dergah û distributiona power:
Ger transformer bibe da rakîn ji pîvan grid connection point, output voltage wê têne vêjînînê da compensat bikin loss voltage line û amneye voltage li ser area far ji transformer. Lakin, ev têne overvoltage ji pîvan grid connection point near transformer.
Settingan tap transformer不合理,这里应继续翻译为库尔德语。以下是修正后的翻译:
Settingsan tap transformer nehatîn û operational faults (mînak, poor contact of the tap changer) têne turns ratio transformer veqetandin, ku têne elevation abnormal output voltage û trigger faulta overvoltage grid voltage. (3) Inverter-Related Factors: Initial Settings and Operational Faults Inverteran bi rangea protection voltage default hatine çêkirin. Di aplikasyonan praktîkî de, ger preset range ne hatiye têgeha şertên grid local, misjudgment têne wergerandin. Mînak, ger grid voltage fluctuate within a normal range but inverter's voltage protection threshold set too low, inverter will frequently report overvoltage faults. During long-term operation, inverters may experience hardware failures (e.g., damaged voltage sampling circuits, faulty control boards). These faults cause inaccurate grid voltage detection by the inverter, leading to incorrect activation of the overvoltage protection mechanism and inverter shutdown. Multi-Inverter Connection Issues In large-scale PV power stations, multiple inverters are often connected to the grid simultaneously. If multiple single-phase inverters are concentrated on one phase, the current on that phase will be excessively high, causing grid voltage imbalance and elevating the voltage of that phase. III. Hazards of Voltage Overvoltage Faults to PV Power Stations and the Grid (1) Damage to PV Power Station Equipment: Increased Risk of Inverter Faults When grid voltage is overvoltage, electronic components inside the inverter bear voltage exceeding their rated value, accelerating component aging or even causing direct damage. For example, power switching devices in inverters (such as IGBTs, Insulated Gate Bipolar Transistors) experience increased voltage stress during turn-on and turn-off under overvoltage conditions, making them prone to breakdown and rendering the inverter inoperable. Additionally, overvoltage may cause faults in the inverter’s control circuit, impairing its ability to precisely control output voltage and current and further reducing the inverter’s performance and reliability. Shortened PV Module Lifespan Excessively high grid voltage can be fed back to the PV module side through the inverter, increasing the operating voltage of the modules. Long-term operation of PV modules under high voltage can alter the performance of their internal semiconductor materials, leading to issues such as hot spots and microcracks. (2) Impact on Grid Stability: Deteriorated Power Quality Grid voltage overvoltage degrades power quality and causes harmonic pollution. When voltage exceeds the normal range, nonlinear loads in the power system generate additional harmonic currents, which in turn further disrupt grid voltage, creating a vicious cycle. Harmonics increase heat generation in electrical equipment, reduce service life, and may interfere with the normal operation of communication systems, undermining the overall stability of the power system. (3) Power Generation Loss and Reduced Economic Benefits: Inverter Shutdown and Derated Operation When an inverter detects grid voltage overvoltage, it shuts down for protection or operates at reduced power to ensure equipment safety. Inverter shutdown causes the PV power station to stop generating electricity entirely, resulting in direct power generation loss. Increased Long-Term Operation and Maintenance (O&M) Costs Damage to PV power station equipment (e.g., inverters and PV modules) caused by voltage overvoltage faults requires timely repair and replacement. This not only increases short-term repair costs but also necessitates more frequent equipment replacement in the future due to shortened service life, raising long-term O&M costs. IV. Effective Solutions to Voltage Overvoltage Faults (1) Pre-Construction Planning and Design Optimization: Comprehensive Grid Survey and Assessment In the pre-construction phase of a PV power station, a comprehensive and detailed survey and assessment of the local grid should be conducted. Key parameters such as grid structure, capacity, load conditions, and voltage fluctuation range should be thoroughly understood. Professional power analysis software should be used to simulate and analyze the potential impact of the PV power station on the grid after connection. For example, tools like PSCAD (Power System Computer-Aided Design) or ETAP (Electrical Transient Analyzer Program) can simulate grid voltage changes under different PV installed capacities, connection locations, and connection methods. This helps determine the most reasonable PV power station construction plan, ensures healthy voltage at the grid connection point, and reduces the risk of voltage overvoltage faults at the source. Rational Planning of PV Installed Capacity Based on the grid’s load absorption capacity and transformer capacity, the installed capacity of the PV power station should be planned rationally. Avoid overconcentrating PV equipment in the same power distribution area to prevent voltage elevation caused by excessive PV power that the grid cannot absorb. Optimization of Inverter Connection Methods For PV power stations with multiple inverters, the inverter connection method should be optimized. Avoid concentrating multiple single-phase inverters on one phase; instead, distribute them evenly across the three grid phases to achieve multi-point grid connection. This balances three-phase current and reduces voltage imbalance and elevation caused by excessive single-phase current. (2) Equipment Selection, Installation, and Commissioning Specifications: Use of High-Quality Cables and Rational Wiring In PV power station construction, high-quality cables that meet national standards should be used. Cable specifications and cross-sectional area should be selected based on actual transmission power and distance. For long-distance grid connection, a larger cable cross-sectional area is required to reduce line impedance and voltage drop. Meanwhile, wiring should be rational to avoid excessively long, tangled, or unnecessarily bent cables. During wiring, cable trays or ducts can be used to protect and organize cables, ensuring safe cable operation. For example, in large-scale PV power stations, underground cable laying can be adopted, and cable routes can be planned rationally to reduce cable length and crossings, improving power transmission efficiency and lowering the probability of voltage overvoltage faults. Accurate Inverter Selection and Installation When selecting inverters, full consideration should be given to local grid conditions. Inverters with a wide voltage adaptation range, reliable overvoltage protection, and high power conversion efficiency should be chosen. During installation, ensure correct AC wiring of the inverter to avoid voltage abnormalities caused by swapping phase and neutral wires. Rational Transformer Configuration and Maintenance Transformers with good voltage regulation performance should be selected to enable timely adjustment when grid voltage fluctuates. Meanwhile, daily maintenance and monitoring of transformers should be strengthened. Transformer parameters such as tap changers, windings, and oil levels should be inspected regularly to ensure normal transformer operation. For transformers far from the grid connection point, on-load tap changers can be used to realize real-time adjustment of transformer output voltage through remote control, ensuring that the voltage at the grid connection point remains within the normal range. (3) Operational Monitoring and Intelligent Regulation Strategies: Establishment of a Real-Time Monitoring System A comprehensive real-time monitoring system should be established for the PV power station to monitor grid parameters such as voltage, current, power, and frequency in real time. Sensors installed at the grid connection point, inverter output end, and PV modules transmit collected data to the monitoring center in real time. Big data analytics and cloud computing platforms are used to analyze and process monitoring data, enabling timely detection of abnormalities such as voltage overvoltage. For example, by setting an early warning threshold for voltage overvoltage, the system automatically sends an alert when the monitored grid voltage approaches or exceeds the threshold, reminding O&M personnel to take timely measures to prevent faults. Regular Maintenance and Fault Troubleshooting A strict regular maintenance plan should be formulated for the PV power station to conduct regular inspections, maintenance, and upkeep of equipment. The operating status of equipment such as inverters, PV modules, cables, and transformers should be checked regularly to identify and repair potential fault risks in a timely manner. During maintenance, equipment parameters should be tested and recorded, and historical data should be compared to analyze equipment operating trends and predict potential faults in advance.