What Causes CT20 Mechanism to Fail to Close? Insufficient Closing Solenoid Stroke Is Key

Felix Spark
Felix Spark
Field: Failure and maintenance
China

The CT20 series operating mechanism is a classic design. One common cause of failure to close is an improperly adjusted, overly short stroke of the closing solenoid. The rated stroke is approximately 5mm. However, due to vibration or incorrect adjustment after maintenance, the stroke may decrease to around 3mm, potentially causing the mechanism to fail to operate. If the control system continuously issues a closing command under such conditions, the solenoid remains energized, which can lead to overheating and eventual burnout.

As shown in the diagram below, when the closing solenoid stroke is normal, the U-shaped component at the end of the plunger pushes the primary closing trip unit, enabling successful closing.

CT20.jpg

One possible cause of failure to close is illustrated below:

CT20.jpg

If the closing solenoid stroke is too short, when the solenoid operates, the front end of the U-shaped part is lifted by the fixed cylindrical rod directly ahead. As a result, although the solenoid activates, it fails to drive the primary closing trip unit to release, leading to a failed closing operation.

In such cases, manual adjustment may restore normal closing. However, if the adjusted stroke remains near the critical 3mm value, the mechanism may again fail to close during the next attempt after a subsequent opening operation.

CT20.jpg

According to feedback from power grid experts, most CT20 mechanism failures are caused by the red-circled area in the figure above failing to reset.

In addition, other causes include mechanical binding combined with spring fatigue. For XK25 models produced before 2013, poor sealing of the mechanism enclosure often led to water ingress and corrosion.

Some failures are due to the dislocation of the reset spring at the closing solenoid or anti-jump assembly, while others result from dried lubricant and slight rust causing resistance and preventing proper reset. The stroke, once correctly set during commissioning, rarely causes issues later—however, care must be taken to restore the correct setting after replacing the coil.

Give a tip and encourage the author!
Recommended
Top 5 Critical Process Controls for GIS Installation & Commissioning
Top 5 Critical Process Controls for GIS Installation & Commissioning
This paper briefly outlines the advantages and technical characteristics of GIS (Gas-Insulated Switchgear) equipment, and elaborates on several critical quality control points and process control measures during on-site installation. It emphasizes that on-site withstand voltage tests can only partially reflect the overall quality and installation workmanship of GIS equipment. Only by strengthening comprehensive quality control throughout the entire installation process—especially in key areas su
James
10/29/2025
Home Outlet Grounding Test: 3 Simple Methods
Home Outlet Grounding Test: 3 Simple Methods
Purpose of Grounding System Functional Grounding (Working Grounding):In power systems, grounding is required for normal operation, such as neutral point grounding. This type of grounding is known as working grounding. Protective Grounding:The metal enclosures of electrical equipment may become energized due to insulation failure. To prevent electric shock hazards to personnel, grounding is provided and is referred to as protective grounding. Overvoltage Protection Grounding:Grounding is installe
Oliver Watts
10/29/2025
The 8-Phase Guide to Installing LW25-126 High-Voltage Circuit Breakers Correctly
The 8-Phase Guide to Installing LW25-126 High-Voltage Circuit Breakers Correctly
1. Pre-Installation PreparationsBefore commencing installation work, the following preparatory steps must be completed: Organization and Training: Organize training sessions for all construction personnel on relevant regulations,technical standards, and construction procedures. Special emphasis should be placed on safety protocols. Site Survey: Examine the intended location of the circuit breaker, its foundation, and the layout of surrounding equipment and wiring to prevent accidental contact wi
James
10/29/2025
7 Key Steps to Ensure Safe and Reliable Installation of Large Power Transformers
7 Key Steps to Ensure Safe and Reliable Installation of Large Power Transformers
1. Maintaining and Restoring the Factory Insulation ConditionWhen a transformer undergoes factory acceptance tests, its insulation condition is at its optimal state. Thereafter, the insulation condition tends to deteriorate, and the installation phase may be a critical period for sudden degradation. In extreme cases, the dielectric strength may drop to the point of failure, leading to coil burnout immediately upon energization. Under normal circumstances, poor installation quality leaves behind
Oliver Watts
10/29/2025
Send inquiry