Bidding Document Supply, Test and Commissioning of MV Switching Stations (RMU) for Addis Ababa Distribution Network
Technical Specifications · ROCKWILL

Bidding Document Supply, Test and Commissioning of MV Switching Stations (RMU) for Addis Ababa Distribution Network

24 kV SF6‑sealed ring‑main‑unit, 630A rated current, 20kA‑3s short‑time withstand, AFLR internal‑arc resistant, 2‑incomer LBS +4‑outgoing CB, SCADA‑ready, for 50 Hz high‑altitude heavy‑pollution Ethiopian distribution‑network projects.

Updated2026.09
LanguageEnglish
FilePDF · 2.8 MB
24kV MV Switching Stations (RMU)Specification for Addis Ababa Distribution NetworkEthiopia Electric utility(EEU)

Document description

This document is African Development Bank‑financed bidding document issued by Ethiopian Electric Utility, targeting EPCs, tenderers and design‑institutes for tender response and pre‑award evaluation.

It follows prevailing IEC and ISO standards and defines project scope, harsh high‑altitude tropical‑humid site constraints, functional configuration, quality‑system requirements, witness‑test rules, warranty obligations, documentation deliverables, personnel‑training and post‑project spare‑parts availability requirements.

It covers bidder qualification criteria, bidding forms and contract clauses for replacement‑type distribution‑switching‑station renovation projects. Contact us for compliance‑check templates and complete qualification documents.

Related Products

Frequently asked questions

The equipment shall be fully SCADA‑compatible, support multi‑protocol protection‑relay communication, local‑remote switch operation, position‑signal feedback and fault‑alarm uploading, to connect with existing DMS platform. Please contact us for SCADA‑interoperability‑advice.

Manufacturer shall hold valid ISO 9001 quality‑management‑system certification; ISO 14001 environmental‑management‑system certification is preferred. All design, production and testing activities shall follow approved quality‑assurance‑plan. Please contact us for qualification‑checklist.

The project faces high altitude up to 3000 m, heavy pollution grade, high humidity and large wind‑speed conditions. Equipment shall be adapted for local climate, insulation derating and anti‑pollution design must be taken into account. Please contact us for environmental‑adaptation guidance.

WhatsApp
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.
Login
or continue with
New here?
Register